Event Notification Report for May 29, 2004
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/28/2004 - 05/29/2004
EVENT NUMBERS
40784
Power Reactor
Event Number: 40784
Facility: NORTH ANNA
Region: 2 State: VA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: PAGE KEMP
HQ OPS Officer: ARLON COSTA
Region: 2 State: VA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: PAGE KEMP
HQ OPS Officer: ARLON COSTA
Notification Date: 05/29/2004
Notification Time: 09:55 [ET]
Event Date: 05/29/2004
Event Time: 02:02 [EDT]
Last Update Date: 05/29/2004
Notification Time: 09:55 [ET]
Event Date: 05/29/2004
Event Time: 02:02 [EDT]
Last Update Date: 05/29/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
DAVID AYRES (R2)
DAVID AYRES (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Hot Standby | 0 | Hot Standby |
CONTROL ROD POSITION INDICATION FAILURE DURING HOT ROD DROP TEST
"During performance of Hot Rod Drop Testing [and] when withdrawing 'D' Control banks, a failure of Group 1 Position Indication was identified. Entered action of Technical Requirement Manual [TRM] 3.1.3 and opened the Reactor Trip Breakers within 15 minutes per action [statement] of TRM 3.1.3."
After the Reactor Trip Breakers were opened all Group 1 "D" Control Rods fully inserted into the core. There were no reactivity concerns since the reactor was borated with adequate shutdown margin. The failure of the position indicator has been identified and repaired. There were no other issues associated with this incident and the licensee will proceed with Hot Rod Drop Testing while at 0% reactor power and Mode 3.
The licensee will notify the NRC Resident Inspector.
"During performance of Hot Rod Drop Testing [and] when withdrawing 'D' Control banks, a failure of Group 1 Position Indication was identified. Entered action of Technical Requirement Manual [TRM] 3.1.3 and opened the Reactor Trip Breakers within 15 minutes per action [statement] of TRM 3.1.3."
After the Reactor Trip Breakers were opened all Group 1 "D" Control Rods fully inserted into the core. There were no reactivity concerns since the reactor was borated with adequate shutdown margin. The failure of the position indicator has been identified and repaired. There were no other issues associated with this incident and the licensee will proceed with Hot Rod Drop Testing while at 0% reactor power and Mode 3.
The licensee will notify the NRC Resident Inspector.