Skip to main content

Event Notification Report for May 02, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/01/2004 - 05/02/2004

EVENT NUMBERS
4071941833

Power Reactor
Event Number: 40719
Facility: NINE MILE POINT
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: FRED RINGWALD
HQ OPS Officer: BILL GOTT
Notification Date: 05/02/2004
Notification Time: 04:09 [ET]
Event Date: 05/02/2004
Event Time: 02:17 [EDT]
Last Update Date: 05/02/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - PLANT S/D REQD BY TS 50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
RICHARD BARKLEY (R1)
TAD MARSH (NRR)
SUSAN FRANT (IRO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 19 Power Operation 0 Hot Shutdown
Event Text
MANUAL SCRAM DUE TO RISING TORUS TEMPERATURE DUE TO STUCK OPEN ERV

"Operators inserted a manual scram at 0217 (EDT) in anticipation of torus bulk temperature approaching 110 degrees F following an Electromatic Relief Valve (ERV) failing to close during ERV testing. Technical Specification 3.3.2.e requires the insertion of a manual scram prior to torus bulk temperature reaching 110 degrees F. The maximum average torus temperature was 104 degrees F.

"Operators opened ERV 123 at 0209 for post maintenance testing from approximately 19% power. The ERV subsequently stuck open. Operators performed the off-normal procedure for a stuck open ERV, but this failed to shut the valve. This ported steam from the reactor vessel to the torus resulting in an uncontrolled torus temperature rise. Operators placed torus cooling in service but this did not stop the rising torus temperature. Following the manual scram, cooldown, and depressurization, shutdown cooling is being placed in service.

"Immediately following the manual scram, a turbine trip signal actuated the logic for high pressure coolant injection. High pressure coolant injection actuated and operators controlled level above 53 inches.

"With the ERV stuck open, the cooldown rate could not be controlled. The cooldown rate was approximately 190 degrees F during the first hour following the scram."

All control rods fully inserted into the core. Decay heat is being removed by shutdown cooling (in service at the time of the report). The operators intend to cooldown to cold shutdown. The electrical buses are stable. Nine Mile Point Unit 2 was not affected.

The licensee notified the NRC Resident Inspector.


General Information or Other
Event Number: 41833
Rep Org: MA RADIATION CONTROL PROGRAM
Licensee: CARDINAL HEALTH
Region: 1
City: WOBURN   State: MA
County:
License #: 42-0146
Agreement: Y
Docket:
NRC Notified By: BRUCE PACKARD
HQ OPS Officer: STEVE SANDIN
Notification Date: 07/11/2005
Notification Time: 10:00 [ET]
Event Date: 05/02/2004
Event Time: 00:00 [EDT]
Last Update Date: 07/11/2005
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
PAMELA HENDERSON (R1)
JOHN HICKEY (NMSS)
Event Text
AGREEMENT STATE REPORT INVOLVING A POTENTIAL EXTREMITY OVEREXPOSURE

The following information was received via facsimile:

"A radio pharmaceutical worker received an extremity dose for 2004 of 51 Rem according to her ring badge. 20 Rem of this dose occurred on April 26 - May 2. The licensee thought this may have been an erroneous reading so this is currently considered a potential extremity overexposure until further investigation."

The radiation source is described as mostly Tc-99m with a dose received to the left ring finger of 51050 mRem. The time and date of discovery for this event was 1100 hours on 7/7/05.