Skip to main content

Event Notification Report for March 20, 2004

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
03/19/2004 - 03/20/2004

EVENT NUMBERS
4068640601

Power Reactor
Event Number: 40686
Facility: OCONEE
Region: 2     State: SC
Unit: [] [2] []
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: RANDY TODD
HQ OPS Officer: ARLON COSTA
Notification Date: 04/20/2004
Notification Time: 10:55 [ET]
Event Date: 03/20/2004
Event Time: 15:59 [EDT]
Last Update Date: 04/26/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.73(a)(1) - INVALID SPECIF SYSTEM ACTUATION
Person (Organization):
CAUDLE JULIAN (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Hot Shutdown 0 Hot Shutdown
Event Text
INVALID ACTUATION OF THE MOTOR DRIVEN EMERGENCY FEEDWATER PUMPS

"By design, the Steam Generator (SG) Dry-out Protection Circuit actuates whenever two level indications (two of two actuation logic) in either SG are lower than the setpoint for more than 30 seconds. This start circuit is not credited in any ONS safety analysis, therefore this signal is considered an INVALID signal with respect to 50.73 (a)(2)(iv)(A). Upon actuation, the circuit starts both Motor Driven Emergency Feedwater Pumps (MDEFWPs) on the affected unit. It does not send a start signal to the Turbine Driven Emergency Feedwater Pump.

"Shortly after entering Mode 4, a control operator stopped one of two operating Reactor Coolant Pumps per the Unit shutdown procedure. A second control operator was manually controlling Feedwater and reduced flow to control the system cooldown rate, without recognizing that the 2B SG had reached the low level setpoint for SG Dry-out Protection Circuit actuation.

"In this event, the 2B SG level trains A and B indicated lower than the setpoint value (-21 inches) for more than 30 seconds, so the SG Dry-out Protection Circuit started the 2A and 2B MDEFWPs. The actuation was considered complete and the system started and functioned successfully. Both MDEFWPs started. The 2B SG control valve, 2FDW-316, opened and fed the 2B SG from the 2B MDEFWP for approximately one minute until the SG level reached the EFDW control setpoint (30 inches). The 2A pump did not feed the 2A SG because 2A SG level remained well above the EFDW control setpoint so there was no demand for the 2A SG control valve, 2FDW-315, to open."

The licensee notified the NRC Resident Inspector.

* * * UPDATE ON 4/26/04 AT 16:23 FROM R. TODD TO A. COSTA * * *
This update is to clarify a typographic misspelling on the first sentence of the last paragraph of this event notification which should read (~[approximately] 21 inches) instead of (-21 inches). Notified R2DO(Julian).


Power Reactor
Event Number: 40601
Facility: CALVERT CLIFFS
Region: 1     State: MD
Unit: [1] [] []
RX Type: [1] CE,[2] CE
NRC Notified By: KEVIN UMPHREY
HQ OPS Officer: RICH LAURA
Notification Date: 03/20/2004
Notification Time: 15:25 [ET]
Event Date: 03/20/2004
Event Time: 13:40 [EST]
Last Update Date: 03/20/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
HAROLD GRAY (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Standby
Event Text
AUTOMATIC REACTOR TRIP AT CALVERT CLIFFS UNIT 1 DUE TO A LOSS OF FEEDWATER

"At 1340 on 3/20/2004, Calvert Cliffs Unit 1 Reactor automatically shutdown due to low Steam Generator Water Level. The low water level was caused by a loss of at least one Steam Generator Feed Pump. The loss was initially caused by a short or ground from Chart Recorder maintenance in Panel 1C29. 1C29 is a control panel in the control room. The chart recorder was a 500KV Bus Voltage Monitor.

"The post trip primary indications responded normally. The auto steam dump operation responded normally until the quick open signal was cleared at which time the Turbine Bypass Valves failed shut. It is unclear at this time why they failed shut. Steam dump continues through the use of the Atmospheric dump valves and feedwater is supplied via the Auxiliary Feedwater System with the use of 11 (Steam Driven Pump) & 13 AFW Pump (electric driven pump). Lowest Steam Generator Level was -210" in 11 S/G and -115" in 12 S/G level.

"Current Conditions are RCS pressure is 2250 PSIA and temperature is 532°F."

All control rods properly inserted into the reactor core. The NRC Resident Inspector was notified.