Event Notification Report for February 25, 2004
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
02/24/2004 - 02/25/2004
EVENT NUMBERS
40545
Power Reactor
Event Number: 40545
Facility: SALEM
Region: 1 State: NJ
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Steve Sauer
HQ OPS Officer: RICH LAURA
Region: 1 State: NJ
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Steve Sauer
HQ OPS Officer: RICH LAURA
Notification Date: 02/25/2004
Notification Time: 14:05 [ET]
Event Date: 02/25/2004
Event Time: 11:15 [EST]
Last Update Date: 02/25/2004
Notification Time: 14:05 [ET]
Event Date: 02/25/2004
Event Time: 11:15 [EST]
Last Update Date: 02/25/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
MOHAMED SHANBAKY (R1)
MOHAMED SHANBAKY (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 99 | Power Operation | 99 | Power Operation |
OFFSITE NOTIFICATION TO NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION
"Made 2 hour notification to the New Jersey Department of Environmental Protection of a New Jersey pollutant discharge elimination system permit violation. The limit for petroleum hydrocarbons is a daily average of 10 ppm over a month period. Current projected amount is 40 ppm."
The sample is taken at the oil water separator outfall for liquid going to the storm drains.
The NRC Inspector was notified.
"Made 2 hour notification to the New Jersey Department of Environmental Protection of a New Jersey pollutant discharge elimination system permit violation. The limit for petroleum hydrocarbons is a daily average of 10 ppm over a month period. Current projected amount is 40 ppm."
The sample is taken at the oil water separator outfall for liquid going to the storm drains.
The NRC Inspector was notified.