Event Notification Report for January 05, 2004
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/04/2004 - 01/05/2004
EVENT NUMBERS
40425404264043040529
Power Reactor
Event Number: 40425
Facility: MCGUIRE
Region: 2 State: NC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: THAD REAMES
HQ OPS Officer: CHAUNCEY GOULD
Region: 2 State: NC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: THAD REAMES
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 01/05/2004
Notification Time: 12:47 [ET]
Event Date: 01/05/2004
Event Time: 09:30 [EST]
Last Update Date: 01/05/2004
Notification Time: 12:47 [ET]
Event Date: 01/05/2004
Event Time: 09:30 [EST]
Last Update Date: 01/05/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
26.73 - FITNESS FOR DUTY
10 CFR Section:
26.73 - FITNESS FOR DUTY
Person (Organization):
DAVID AYRES (R2)
DAVID AYRES (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
LICENSEE MANAGER TESTED POSITIVE FOR ALCOHOL ON A RANDOM TEST
Contact HOO for additional information
The NRC Resident Inspector will be informed.
Contact HOO for additional information
The NRC Resident Inspector will be informed.
Power Reactor
Event Number: 40426
Facility: HADDAM NECK
Region: 1 State: CT
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: CHARLIE REID
HQ OPS Officer: JEFF ROTTON
Region: 1 State: CT
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: CHARLIE REID
HQ OPS Officer: JEFF ROTTON
Notification Date: 01/05/2004
Notification Time: 17:08 [ET]
Event Date: 01/05/2004
Event Time: 08:00 [EST]
Last Update Date: 01/05/2004
Notification Time: 17:08 [ET]
Event Date: 01/05/2004
Event Time: 08:00 [EST]
Last Update Date: 01/05/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
26.73 - FITNESS FOR DUTY
10 CFR Section:
26.73 - FITNESS FOR DUTY
Person (Organization):
JAMES NOGGLE (R1)
JAMES NOGGLE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Decommissioned | 0 | Decommissioned |
PLANT ACCESS TERMINATED DUE TO POSITIVE FITNESS FOR DUTY TEST
A contractor employee was given an Administrative positive FFD test result due to not showing up for a random FFD test and leaving the site without completing the test. The employee's access to the plant has been terminated. Contact the HOO for additional details.
The licensee notified the NRC Resident Inspector and Connecticut DEP.
A contractor employee was given an Administrative positive FFD test result due to not showing up for a random FFD test and leaving the site without completing the test. The employee's access to the plant has been terminated. Contact the HOO for additional details.
The licensee notified the NRC Resident Inspector and Connecticut DEP.
General Information or Other
Event Number: 40430
Rep Org: TEXAS DEPARTMENT OF HEALTH
Licensee: THE METHODIST HOSPITAL
Region: 4
City: HOUSTON State: TX
County:
License #: L00457-000
Agreement: Y
Docket:
NRC Notified By: JAMES H. OGDEN
HQ OPS Officer: JOHN MacKINNON
Licensee: THE METHODIST HOSPITAL
Region: 4
City: HOUSTON State: TX
County:
License #: L00457-000
Agreement: Y
Docket:
NRC Notified By: JAMES H. OGDEN
HQ OPS Officer: JOHN MacKINNON
Notification Date: 01/07/2004
Notification Time: 16:43 [ET]
Event Date: 01/05/2004
Event Time: 08:16 [CST]
Last Update Date: 01/07/2004
Notification Time: 16:43 [ET]
Event Date: 01/05/2004
Event Time: 08:16 [CST]
Last Update Date: 01/07/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
MIKE RUNYAN (R4)
JOSEPH GIITTER (NMSS)
MIKE RUNYAN (R4)
JOSEPH GIITTER (NMSS)
AGREEMENT STATE REPORT: NOVOSTE STRONTIUM-90 INTRAVASULAR BRACHYTHERAPY (IVB) SOURCE DISCOVERED MISSING.
"Novoste Strontium-90 Intravascular brachytherapy (IVB) source (remote afterloader) was discovered missing on January 5, 2004. Source was last seen but not used on December 17, 2003. Reported by phone by RSO. Source is a small handlheld device - Manufacturer: Novoste, Model: BethCath, Serial No. 92607; Source train Serial No. ZB-520; Original Activity 55.62 millicuries; current activity (date of discovery) 54.64 millicuries; Calibration date: 04/11/2003; Last leak test 10/29/2003. Received at the hospital on November 4, 2003. Last used in a patient on December 5, 2003 (first and last use). Last seen on during a functional test on December 17, 2003 in the Fondren Building, Room F1099 (near cath lab) at the Licensee's main site 6565 Fannin Street, Houston, Texas. The source was not used that day. Two other sources of different activity and length remain in storage. The room and cath lab have been search 4 times by the Licensee's staff. Trash has been surveyed. Hospital staff has been notified of the missing equipment.."
Texas Incident No.: I-8089.
"Novoste Strontium-90 Intravascular brachytherapy (IVB) source (remote afterloader) was discovered missing on January 5, 2004. Source was last seen but not used on December 17, 2003. Reported by phone by RSO. Source is a small handlheld device - Manufacturer: Novoste, Model: BethCath, Serial No. 92607; Source train Serial No. ZB-520; Original Activity 55.62 millicuries; current activity (date of discovery) 54.64 millicuries; Calibration date: 04/11/2003; Last leak test 10/29/2003. Received at the hospital on November 4, 2003. Last used in a patient on December 5, 2003 (first and last use). Last seen on during a functional test on December 17, 2003 in the Fondren Building, Room F1099 (near cath lab) at the Licensee's main site 6565 Fannin Street, Houston, Texas. The source was not used that day. Two other sources of different activity and length remain in storage. The room and cath lab have been search 4 times by the Licensee's staff. Trash has been surveyed. Hospital staff has been notified of the missing equipment.."
Texas Incident No.: I-8089.
Other Nuclear Material
Event Number: 40529
Rep Org: US ARMY TACOM
Licensee: US ARMY TACOM
Region: 3
City: ROCK ISLAND State: IL
County:
License #: 12-00722-06
Agreement: Y
Docket:
NRC Notified By: THOMAS GIZICKI
HQ OPS Officer: ARLON COSTA
Licensee: US ARMY TACOM
Region: 3
City: ROCK ISLAND State: IL
County:
License #: 12-00722-06
Agreement: Y
Docket:
NRC Notified By: THOMAS GIZICKI
HQ OPS Officer: ARLON COSTA
Notification Date: 02/18/2004
Notification Time: 12:47 [ET]
Event Date: 01/05/2004
Event Time: 00:00 [CST]
Last Update Date: 02/18/2004
Notification Time: 12:47 [ET]
Event Date: 01/05/2004
Event Time: 00:00 [CST]
Last Update Date: 02/18/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2201(a)(1)(i) - LOST/STOLEN LNM>1000X
10 CFR Section:
20.2201(a)(1)(i) - LOST/STOLEN LNM>1000X
Person (Organization):
RONALD GARDNER (R3)
SCOTT W. MOORE (NMSS)
RONALD GARDNER (R3)
SCOTT W. MOORE (NMSS)
LOST TELESCOPE COMPONENT TRITIUM SEALED SOURCE
On December 16, 2003, the US Army shipped a telescope firing component containing a 2.65 curie tritium source via DHL air from Vicenza, Italy to St. Louis MO destined to Siler Instruments, a US Army contractor. The source was discovered missing on January 5, 2004. It was determined that the package did not arrive in Cincinnati, OH, the point of entrance through US Customs. The US Army received a final notice from DHL on January 26, 2004 that the box containing the missing source cannot be located. The Army Health Physicist has contacted NRC Region 3 and is in the process of finalizing the 30-day written report.
On December 16, 2003, the US Army shipped a telescope firing component containing a 2.65 curie tritium source via DHL air from Vicenza, Italy to St. Louis MO destined to Siler Instruments, a US Army contractor. The source was discovered missing on January 5, 2004. It was determined that the package did not arrive in Cincinnati, OH, the point of entrance through US Customs. The US Army received a final notice from DHL on January 26, 2004 that the box containing the missing source cannot be located. The Army Health Physicist has contacted NRC Region 3 and is in the process of finalizing the 30-day written report.