Event Notification Report for January 02, 2004
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/01/2004 - 01/02/2004
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 40422
Facility: COLUMBIA GENERATING STATION
Region: 4 State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: ROBERT YULE
HQ OPS Officer: MIKE RIPLEY
Region: 4 State: WA
Unit: [2] [] []
RX Type: [2] GE-5
NRC Notified By: ROBERT YULE
HQ OPS Officer: MIKE RIPLEY
Notification Date: 01/02/2004
Notification Time: 06:50 [ET]
Event Date: 01/02/2004
Event Time: 02:58 [PST]
Last Update Date: 02/03/2004
Notification Time: 06:50 [ET]
Event Date: 01/02/2004
Event Time: 02:58 [PST]
Last Update Date: 02/03/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
TOM FARNHOLTZ (R4)
AARON DANIS (TAS)
TOM FARNHOLTZ (R4)
AARON DANIS (TAS)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
SAFEGUARD SYSTEM VULNERABILITY
Discovered vulnerability in a safeguard system that could allow access to a controlled access area for which compensatory measures have not been employed. The licensee will be notifying the NRC Resident Inspector. Contact the Headquarters Operations Officer for additional details.
* * * * RETRACTION FROM F. SCHILL TO M. RIPLEY 1812 ET 02/03/2004 * * *
"Further evaluation of the events associated with this report reveals that the reported event does not meet the criteria for reporting pursuant to 10 CFR 73.71(b)(1) and is hereby retracted." Contact the Headquarters Operations Officer for additional details. The licensee notified the NRC Resident Inspector.
Notified R4 (A. Gody) and NSIR TAS (M. Hahn)
Discovered vulnerability in a safeguard system that could allow access to a controlled access area for which compensatory measures have not been employed. The licensee will be notifying the NRC Resident Inspector. Contact the Headquarters Operations Officer for additional details.
* * * * RETRACTION FROM F. SCHILL TO M. RIPLEY 1812 ET 02/03/2004 * * *
"Further evaluation of the events associated with this report reveals that the reported event does not meet the criteria for reporting pursuant to 10 CFR 73.71(b)(1) and is hereby retracted." Contact the Headquarters Operations Officer for additional details. The licensee notified the NRC Resident Inspector.
Notified R4 (A. Gody) and NSIR TAS (M. Hahn)
Fuel Cycle Facility
Event Number: 40423
Facility: PADUCAH GASEOUS DIFFUSION PLANT
Region: 2 State: KY
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: TONY HUDSON
HQ OPS Officer: MIKE RIPLEY
Region: 2 State: KY
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: TONY HUDSON
HQ OPS Officer: MIKE RIPLEY
Notification Date: 01/02/2004
Notification Time: 10:03 [ET]
Event Date: 01/02/2004
Event Time: 02:30 [CST]
Last Update Date: 01/02/2004
Notification Time: 10:03 [ET]
Event Date: 01/02/2004
Event Time: 02:30 [CST]
Last Update Date: 01/02/2004
Emergency Class: NON EMERGENCY
10 CFR Section:
76.120(c)(2) - SAFETY EQUIPMENT FAILURE
10 CFR Section:
76.120(c)(2) - SAFETY EQUIPMENT FAILURE
Person (Organization):
DAVID AYRES (R2)
TRISH HOLAHAN (NMSS)
DAVID AYRES (R2)
TRISH HOLAHAN (NMSS)
FAILURE OF AUTOCLAVE ISOLATION SYSTEM
"At 0230 on 01-02-04 the Plant Shift Superintendent (PSS) was notified of a failure of the C-360 #3 Autoclave High Pressure Isolation System. Steam was observed leaking from the autoclave head-to-shell interface between the eleven and one o'clock position shortly after initiating a cylinder heat cycle. At the time of discovery, the autoclave was in TSR [Technical Safety Requirements] mode 5 and the High Pressure Isolation System was required to be operable while in this mode. This system is designed to provide containment of the autoclave and prevent an external release of UF6 during a system breach while heating a UF6 cylinder. The PSS declared the system inoperable and TSR LCO 2.1.3.1.C1 actions were implemented to remove the autoclave from service and place it in Mode 2, "Out of Service". The event is reportable as a 24 hour event, as required by 10 CFR 76.120(c)(2)(i); An event in which equipment is disabled or fails to function as designed when the equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident. The equipment was required by TSR to be available and operable and no redundant equipment was available to perform the required safety function.
"The Senior NRC Resident Inspector has been notified of this event."
"At 0230 on 01-02-04 the Plant Shift Superintendent (PSS) was notified of a failure of the C-360 #3 Autoclave High Pressure Isolation System. Steam was observed leaking from the autoclave head-to-shell interface between the eleven and one o'clock position shortly after initiating a cylinder heat cycle. At the time of discovery, the autoclave was in TSR [Technical Safety Requirements] mode 5 and the High Pressure Isolation System was required to be operable while in this mode. This system is designed to provide containment of the autoclave and prevent an external release of UF6 during a system breach while heating a UF6 cylinder. The PSS declared the system inoperable and TSR LCO 2.1.3.1.C1 actions were implemented to remove the autoclave from service and place it in Mode 2, "Out of Service". The event is reportable as a 24 hour event, as required by 10 CFR 76.120(c)(2)(i); An event in which equipment is disabled or fails to function as designed when the equipment is required by a TSR to prevent releases, prevent exposures to radiation and radioactive materials exceeding specified limits, mitigate the consequences of an accident, or restore this facility to a pre-established safe condition after an accident. The equipment was required by TSR to be available and operable and no redundant equipment was available to perform the required safety function.
"The Senior NRC Resident Inspector has been notified of this event."
Power Reactor
Event Number: 40424
Facility: OCONEE
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: SYLVESTER MONTGOMERY
HQ OPS Officer: STEVE SANDIN
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: SYLVESTER MONTGOMERY
HQ OPS Officer: STEVE SANDIN
Notification Date: 01/02/2004
Notification Time: 21:30 [ET]
Event Date: 01/02/2004
Event Time: 20:38 [EST]
Last Update Date: 01/03/2004
Notification Time: 21:30 [ET]
Event Date: 01/02/2004
Event Time: 20:38 [EST]
Last Update Date: 01/03/2004
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a) (1) (i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a) (1) (i) - EMERGENCY DECLARED
Person (Organization):
DAVID AYRES (R2)
PAO-TSIN KUO (NRR)
TIM MCGINTY (IRO)
CALDWELL (FEMA)
MARK LOMBARD (NRC)
DAVID AYRES (R2)
PAO-TSIN KUO (NRR)
TIM MCGINTY (IRO)
CALDWELL (FEMA)
MARK LOMBARD (NRC)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Hot Standby | 0 | Hot Standby |
UNIT 1 DECLARED AN UNUSUAL EVENT DUE TO 14 GPM UNIDENTIFIED RCS LEAKAGE
At 2038EST Unit 1 Control Room Operators observed and quantified unidentified RCS leakage of approximately 14 gpm based on containment sump pump operation and a corresponding decrease in VCT level. Unit 1 was preparing for startup and there were no ongoing maintenance activities at the time. The licensee declared an Unusual Event entering their emergency procedures to isolate and identify the source of the leakage. As a result, a pressurizer sample line was isolated which terminated the leakage. The licensee will remain in the Unusual Event until an investigation is completed confirming that this was the source. There was no measured increase in radiation levels/humidity inside containment or radioactive release to the environment.
At the time of the report, 3 of the 4 RCPs were operating for forced circulation with the 4th RCP secured earlier in the day during a test. All ECCS systems are available including the EDGs, if needed. Normal makeup is in service to maintain RCS inventory with MFW supplying the Generators for decay heat removal via the steam bypass to the Main Condenser.
The licensee informed state/local agencies and will inform the NRC Resident Inspector.
At 2158EST the NRC determined that this event did not require entry into the Monitoring Phase of Normal Mode.
* * * UPDATE ON 01/03/04 AT 0006 EST FROM SLYVESTER MONTGOMERY TO GERRY WAIG * * *
The licensee terminated the NOUE at 2353 hours EST on 01/02/04. The leak has been identified as coming from a relief valve flange on the pressurizer sample line. Maintenance activities are on-going to repair the leak and the reactor remains in mode 3. The licensee has notified state and local government of the NOUE termination and will be notifying the NRC Resident Inspector.
Notified R2DO (David Ayres), FEMA (Dan Sullivan), DIRO (Tim McGinty), NRR (Pao-Tsin Kuo), NRC (Thomas)
At 2038EST Unit 1 Control Room Operators observed and quantified unidentified RCS leakage of approximately 14 gpm based on containment sump pump operation and a corresponding decrease in VCT level. Unit 1 was preparing for startup and there were no ongoing maintenance activities at the time. The licensee declared an Unusual Event entering their emergency procedures to isolate and identify the source of the leakage. As a result, a pressurizer sample line was isolated which terminated the leakage. The licensee will remain in the Unusual Event until an investigation is completed confirming that this was the source. There was no measured increase in radiation levels/humidity inside containment or radioactive release to the environment.
At the time of the report, 3 of the 4 RCPs were operating for forced circulation with the 4th RCP secured earlier in the day during a test. All ECCS systems are available including the EDGs, if needed. Normal makeup is in service to maintain RCS inventory with MFW supplying the Generators for decay heat removal via the steam bypass to the Main Condenser.
The licensee informed state/local agencies and will inform the NRC Resident Inspector.
At 2158EST the NRC determined that this event did not require entry into the Monitoring Phase of Normal Mode.
* * * UPDATE ON 01/03/04 AT 0006 EST FROM SLYVESTER MONTGOMERY TO GERRY WAIG * * *
The licensee terminated the NOUE at 2353 hours EST on 01/02/04. The leak has been identified as coming from a relief valve flange on the pressurizer sample line. Maintenance activities are on-going to repair the leak and the reactor remains in mode 3. The licensee has notified state and local government of the NOUE termination and will be notifying the NRC Resident Inspector.
Notified R2DO (David Ayres), FEMA (Dan Sullivan), DIRO (Tim McGinty), NRR (Pao-Tsin Kuo), NRC (Thomas)