Event Notification Report for February 26, 2003

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/25/2003 - 02/26/2003

EVENT NUMBERS
39620

Power Reactor
Event Number: 39620
Facility: KEWAUNEE
Region: 3     State: WI
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: FRANSON
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 02/26/2003
Notification Time: 02:05 [ET]
Event Date: 02/26/2003
Event Time: 00:17 [CST]
Last Update Date: 02/26/2003
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a) (1) (i) - EMERGENCY DECLARED 50.72(b)(2)(i) - PLANT S/D REQD BY TS
Person (Organization):
THOMAS KOZAK (R3)
MICHAEL JOHNSON (NRR)
PATRICK HILAND (IRO)
AL AUSTIN (FEMA)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
PLANT ENTERED A NOUE DUE TO BOTH EMERGENCY DIESEL GENERATORS BEING DECLARED INOPERABLE

The licensee declared an unusual event at 0026 CST due to both Emergency Diesel Generators being inoperable resulting in the loss of on-site power capability. At 0017 the "B" Diesel Generator failed to start during an attempt to verify operability as required by TS 3.7.b.2 since the "A" Diesel Generator was out of service for maintenance. They are investigating the cause for the no start of the "B" Diesel Generator. The plant has 6 hrs to be in hot standby and the following 6 hrs to hot shutdown.

The NRC Resident Inspector will be notified. State and local agencies were notified and there may be a press release.

* * * UPDATE AT 0804 EST ON 2/26/03 FROM JERRY RISTE TO ARLON COSTA * * *

"Unusual Event Termination

"At 0624 the B emergency diesel generator was returned to service. This exited the condition in EPIP-AD-02, Emergency Class Determination," requiring declaration of an Unusual Event. At 0656 the Unusual Event was terminated."

The licensee replaced a faulty speed sensing relay at the "B" EDG relay panel and was subsequently able to re-start the diesel from the control room. The unit is currently stable, holding power at 9.3% and all systems are functioning as required. The licensee notified the NRC Resident Inspector, the State and local authorities. A media/press release was issued by the licensee.

Notified R3DO(Kozak), NRR EO (Johnson), DIRO (Hiland) and FEMA (Caldwell).