Event Notification Report for April 22, 2002
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
04/21/2002 - 04/22/2002
EVENT NUMBERS
38883388723887338870
General Information or Other
Event Number: 38883
Rep Org: LOUISIANA RADIATION PROTECTION DIV
Licensee: TULANE UNIVERSITY
Region: 4
City: NEW ORLEANS State: LA
County:
License #: LA-0004-L01
Agreement: Y
Docket:
NRC Notified By: SCOTT BLACKWELL
HQ OPS Officer: GERRY WAIG
Licensee: TULANE UNIVERSITY
Region: 4
City: NEW ORLEANS State: LA
County:
License #: LA-0004-L01
Agreement: Y
Docket:
NRC Notified By: SCOTT BLACKWELL
HQ OPS Officer: GERRY WAIG
Notification Date: 04/30/2002
Notification Time: 11:03 [ET]
Event Date: 04/22/2002
Event Time: 10:25 [CDT]
Last Update Date: 04/30/2002
Notification Time: 11:03 [ET]
Event Date: 04/22/2002
Event Time: 10:25 [CDT]
Last Update Date: 04/30/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
BLAIR SPITZBERG (R4)
DOUG BROADDUS (NMSS)
BLAIR SPITZBERG (R4)
DOUG BROADDUS (NMSS)
MEDICAL MISADMINISTRATION
The following event description is taken from a facsimile:
"On April 22, 2002, the technologist injected a patient with a syringe labeled Tc-99m MAG 3 in order to image the kidneys. The gamma camera showed uptake in the liver-kidney indicating a sulfur colloid dose. The patient was prescribed a 4.5 mCi dose of Tc-99m MAG 3, but received a 4.5 mCi dose of Tc-99m Sulfur Colloid. The patient and the pharmacy were notified of the error. The dose for a patient receiving 5 mCi of Tc-99m Sulfur Colloid is estimated as the following: Liver - 12.15 Rad, Spleen - 7.65 Rad, Bone Marrow - 0.05 Rad, Testes - 0.02 Rad, Ovaries - 0.2 Rad, and Total Body - 0.675 Rad."
The following event description is taken from a facsimile:
"On April 22, 2002, the technologist injected a patient with a syringe labeled Tc-99m MAG 3 in order to image the kidneys. The gamma camera showed uptake in the liver-kidney indicating a sulfur colloid dose. The patient was prescribed a 4.5 mCi dose of Tc-99m MAG 3, but received a 4.5 mCi dose of Tc-99m Sulfur Colloid. The patient and the pharmacy were notified of the error. The dose for a patient receiving 5 mCi of Tc-99m Sulfur Colloid is estimated as the following: Liver - 12.15 Rad, Spleen - 7.65 Rad, Bone Marrow - 0.05 Rad, Testes - 0.02 Rad, Ovaries - 0.2 Rad, and Total Body - 0.675 Rad."
Power Reactor
Event Number: 38872
Facility: COOK
Region: 3 State: MI
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DEAN BRUCK
HQ OPS Officer: JOHN MacKINNON
Region: 3 State: MI
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DEAN BRUCK
HQ OPS Officer: JOHN MacKINNON
Notification Date: 04/22/2002
Notification Time: 13:17 [ET]
Event Date: 04/22/2002
Event Time: 06:00 [EDT]
Last Update Date: 04/22/2002
Notification Time: 13:17 [ET]
Event Date: 04/22/2002
Event Time: 06:00 [EDT]
Last Update Date: 04/22/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
JOHN JACOBSON (R3)
JIM WHITNEY (NMSS)
JOHN JACOBSON (R3)
JIM WHITNEY (NMSS)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
MICHIGAN STATE POLICE AT DC COOK PLANT ENTRANCE.
The following is a courtesy call regarding an event that occurred at the DC Cook Nuclear Power Plant at 0600 on 4/22/02. The following has not been issued as a Cook Plant news release but it is believed that the news media is already aware of this via other means.
At 0600 on 4/22/02, Michigan State Police (MSP) arrived at the Cook Plant main entrance. MSP told Cook Plant Security that they were waiting for an individual known to work at Cook to show up. MSP had previous encounters with this individual and knew this person had concealed weapons permit, was known to carry a weapon in the car and had been previously advised by MSP to not carry a weapon on Cook property.
When the individual, a contractor, arrived, Cook Plant Security personnel asked him if had a weapon in his car. He stated that he did not, having stashed it offsite on the highway. At this point the MSP advised him that he would take them to the location of the weapon. About 15 minutes later MSP and the individual returned, with MSP in possession of the weapon. MSP stated that they would retain possession of the weapon pending further investigation. Having no other reasons to deny access, the individual was allowed on site.
The following is a courtesy call regarding an event that occurred at the DC Cook Nuclear Power Plant at 0600 on 4/22/02. The following has not been issued as a Cook Plant news release but it is believed that the news media is already aware of this via other means.
At 0600 on 4/22/02, Michigan State Police (MSP) arrived at the Cook Plant main entrance. MSP told Cook Plant Security that they were waiting for an individual known to work at Cook to show up. MSP had previous encounters with this individual and knew this person had concealed weapons permit, was known to carry a weapon in the car and had been previously advised by MSP to not carry a weapon on Cook property.
When the individual, a contractor, arrived, Cook Plant Security personnel asked him if had a weapon in his car. He stated that he did not, having stashed it offsite on the highway. At this point the MSP advised him that he would take them to the location of the weapon. About 15 minutes later MSP and the individual returned, with MSP in possession of the weapon. MSP stated that they would retain possession of the weapon pending further investigation. Having no other reasons to deny access, the individual was allowed on site.
Power Reactor
Event Number: 38873
Facility: CALVERT CLIFFS
Region: 1 State: MD
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: D. FRYE
HQ OPS Officer: JOHN MacKINNON
Region: 1 State: MD
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: D. FRYE
HQ OPS Officer: JOHN MacKINNON
Notification Date: 04/22/2002
Notification Time: 13:36 [ET]
Event Date: 04/22/2002
Event Time: 12:05 [EDT]
Last Update Date: 04/22/2002
Notification Time: 13:36 [ET]
Event Date: 04/22/2002
Event Time: 12:05 [EDT]
Last Update Date: 04/22/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
CLIFFORD ANDERSON (R1)
CLIFFORD ANDERSON (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
EMERGENCY SIRENS ACTUATED DURING A SILENT TEST
Inadvertent Emergency Response Siren actuation occurred in Calvert County during the weekly silent test. All 49 sirens sounded for approx. 15 seconds.
The NRC Resident Inspector was notified of this event by the licensee.
Inadvertent Emergency Response Siren actuation occurred in Calvert County during the weekly silent test. All 49 sirens sounded for approx. 15 seconds.
The NRC Resident Inspector was notified of this event by the licensee.
Power Reactor
Event Number: 38870
Facility: SUSQUEHANNA
Region: 1 State: PA
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: ART FINCH
HQ OPS Officer: MIKE NORRIS
Region: 1 State: PA
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: ART FINCH
HQ OPS Officer: MIKE NORRIS
Notification Date: 04/22/2002
Notification Time: 02:43 [ET]
Event Date: 04/22/2002
Event Time: 01:15 [EDT]
Last Update Date: 04/22/2002
Notification Time: 02:43 [ET]
Event Date: 04/22/2002
Event Time: 01:15 [EDT]
Last Update Date: 04/22/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
JOHN ROGGE (R1)
JOHN ROGGE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | M/R | Y | 16 | Power Operation | 0 | Hot Shutdown |
MANUAL RPS ACTUATION
"Susquehanna Unit 1 was at 20% power and in the process of preparing to further increase power following a Refueling and Inspection Outage. At 0016 on 4/22/02, the B Reactor Recirculation Pump tripped for an unexplained reason. During a review of the plant response to the transient, it was discovered that the unit was operating to the left of the expected Power to Flow curve. There was no indication of power flux oscillations from the nuclear instrumentation, but no guidance was available on how to respond to this condition. Reactor Engineering and Operations Management were contacted and it was decided to manually scram the unit. At 0115 the Mode Switch was taken to Shutdown and all control rods inserted. This was an unplanned RPS Actuation and in accordance with 10 CFR 50.72(b)(2)(iv)(B) requires a four-hour ENS Notification. Reactor water level dropped below level 3 which is expected during a scram, feedwater level control responded to return level to normal and all level 3 isolations went to completion. There were no ECCS initiations, no challenges to containment, and no indication of radiation releases. Operations is currently performing a controlled cooldown to mode 4, an investigation into the cause of the recirc pump trip is ongoing."
The NRC Resident Inspector has been notified.
"Susquehanna Unit 1 was at 20% power and in the process of preparing to further increase power following a Refueling and Inspection Outage. At 0016 on 4/22/02, the B Reactor Recirculation Pump tripped for an unexplained reason. During a review of the plant response to the transient, it was discovered that the unit was operating to the left of the expected Power to Flow curve. There was no indication of power flux oscillations from the nuclear instrumentation, but no guidance was available on how to respond to this condition. Reactor Engineering and Operations Management were contacted and it was decided to manually scram the unit. At 0115 the Mode Switch was taken to Shutdown and all control rods inserted. This was an unplanned RPS Actuation and in accordance with 10 CFR 50.72(b)(2)(iv)(B) requires a four-hour ENS Notification. Reactor water level dropped below level 3 which is expected during a scram, feedwater level control responded to return level to normal and all level 3 isolations went to completion. There were no ECCS initiations, no challenges to containment, and no indication of radiation releases. Operations is currently performing a controlled cooldown to mode 4, an investigation into the cause of the recirc pump trip is ongoing."