Event Notification Report for March 11, 2002
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
03/10/2002 - 03/11/2002
Power Reactor
Event Number: 38759
Facility: HATCH
Region: 2 State: GA
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: STEVE HOWARD
HQ OPS Officer: MIKE NORRIS
Region: 2 State: GA
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: STEVE HOWARD
HQ OPS Officer: MIKE NORRIS
Notification Date: 03/11/2002
Notification Time: 04:12 [ET]
Event Date: 03/11/2002
Event Time: 04:10 [EST]
Last Update Date: 03/21/2002
Notification Time: 04:12 [ET]
Event Date: 03/11/2002
Event Time: 04:10 [EST]
Last Update Date: 03/21/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSE
Person (Organization):
JAY HENSON (R2)
JAY HENSON (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
PLANNED LOSS OF SAFETY PARAMETER DISPLAY SYSTEM FOR MAINTENANCE
"This report is being conservatively made under 10CFR50.72(b)(3)(xiii) as a result of removing the Unit 2 Safety Parameter Display System (SPDS) from service for the purpose of implementing a modification to replace the system. This is a planned activity. The primary means of monitoring the critical parameters remains available to the operating crew and they will continue to be able to perform necessary actions regarding emergency assessment in the unlikely event of a situation necessitating its use."
The NRC Resident Inspector has been notified.
* * * UPDATE 3/21/02 AT 1443 EST BY AL DEES TO GERRY WAIG * * *
Unit 2 SPDS returned to service at 1300 EST.
The licensee notified the NRC Resident Inspector.
Notified the R2DO (Jay Henson)
"This report is being conservatively made under 10CFR50.72(b)(3)(xiii) as a result of removing the Unit 2 Safety Parameter Display System (SPDS) from service for the purpose of implementing a modification to replace the system. This is a planned activity. The primary means of monitoring the critical parameters remains available to the operating crew and they will continue to be able to perform necessary actions regarding emergency assessment in the unlikely event of a situation necessitating its use."
The NRC Resident Inspector has been notified.
* * * UPDATE 3/21/02 AT 1443 EST BY AL DEES TO GERRY WAIG * * *
Unit 2 SPDS returned to service at 1300 EST.
The licensee notified the NRC Resident Inspector.
Notified the R2DO (Jay Henson)
Hospital
Event Number: 38780
Rep Org: WEST VALLEY MEDICAL CENTER
Licensee: WEST VALLEY MEDICAL CENTER
Region: 4
City: CALDWELL State: ID
County:
License #: 11-27087-01
Agreement: N
Docket:
NRC Notified By: MUNK
HQ OPS Officer: CHAUNCEY GOULD
Licensee: WEST VALLEY MEDICAL CENTER
Region: 4
City: CALDWELL State: ID
County:
License #: 11-27087-01
Agreement: N
Docket:
NRC Notified By: MUNK
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 03/18/2002
Notification Time: 17:03 [ET]
Event Date: 03/11/2002
Event Time: 13:05 [MST]
Last Update Date: 03/18/2002
Notification Time: 17:03 [ET]
Event Date: 03/11/2002
Event Time: 13:05 [MST]
Last Update Date: 03/18/2002
Emergency Class: NON EMERGENCY
10 CFR Section:
35.33 - MED MISADMINISTRATION
10 CFR Section:
35.33 - MED MISADMINISTRATION
Person (Organization):
DALE POWERS (R4)
THOMAS ESSIG (NMSS)
DALE POWERS (R4)
THOMAS ESSIG (NMSS)
MEDICAL MISADMINISTRATION
The West Valley Medical Center reported that a possible medical misadministration occurred when a patient, who had an order from his physician for a bone scan, was injected with 25 millicuries of technetium-99 HDP, but after gathering more information from the patient, it turns out the physician had misordered the procedure he wanted. The patient's physician was contacted and he verified the procedure he actually wanted was a bone densitometry scan(DEXA scan) which does not require the injection of nuclear medicine as a bone scan does. The patient and physician were notified and there was no adverse affect to the patient.
This was discovered during their Radiation Safety Committee meeting.
The West Valley Medical Center reported that a possible medical misadministration occurred when a patient, who had an order from his physician for a bone scan, was injected with 25 millicuries of technetium-99 HDP, but after gathering more information from the patient, it turns out the physician had misordered the procedure he wanted. The patient's physician was contacted and he verified the procedure he actually wanted was a bone densitometry scan(DEXA scan) which does not require the injection of nuclear medicine as a bone scan does. The patient and physician were notified and there was no adverse affect to the patient.
This was discovered during their Radiation Safety Committee meeting.