Event Notification Report for September 03, 2001

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
09/02/2001 - 09/03/2001

EVENT NUMBERS
38262

Power Reactor
Event Number: 38262
Facility: LASALLE
Region: 3     State: IL
Unit: [] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: COVEYOU
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 09/03/2001
Notification Time: 22:02 [ET]
Event Date: 09/03/2001
Event Time: 17:28 [CDT]
Last Update Date: 09/03/2001
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(2)(iv)(A) - ECCS INJECTION 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
PATRICK HILAND (R3)
JACK STROSNIDER (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 100 Power Operation 0 Hot Shutdown
Event Text
REACTOR MANUALLY SCRAMMED FROM 100% DUE TO LOW VESSEL LEVEL

This report is being made per 10CFR50.72(b)(2)(iv)(B) RPS actuation (4 hour notification for U-2), 10CFR50.72(b)(2)(iv)(A) ECCS Injection/Actuation (4 hour notification for Unit 2), and 10CFR50.72(b)(3)(iv)(A) System Actuation not including RPS (8 hour notification for Unit 1 and 2).

At 1728 CST. Monday, 9-3-01,U-2 was manually scrammed. Initiating event appears to be a loss of Bus 241Y, which resulted in a loss of feedwater. The reactor was manually scrammed at approximately 20 inches before the automatic scram setpoint for low vessel water level. All rods fully inserted.

The Reactor Core Isolation Cooling (RCIC) and High-Pressure Core Spray (HPCS) systems automatically started and injected and restored Reactor Pressure Vessel (RPV) level.

A primary containment-level 2 isolation occurred and the Reactor Recirculation pumps tripped at minus 50 inches as expected. Unit 1 was affected due to standby gas treatment auto start and the reactor building vent system isolation.

The lowest Reactor water level reached was minus 55 inches (106 inches above the top of active fuel) as indicated by the Division 2 instrumentation and was recovered to normal level with RCIC and HPCS within a few minutes. Approximately 10,000 gallons of water was injected.

Bus 241Y was automatically re-energized from the (0) Common Diesel Generator.

Dry-well pressure increased due to the expected loss of primary containment cooling. The highest pressure reached was approximately (1) one psig. Primary Containment Cooling has been restored. There are no indications of a leak inside the primary containment.

RPV pressure is being controlled at 800 to 1000 psig by the use of RCIC. Main Steam Line drains, and manual operation of Safety Relief Valve (as necessary). RPV level has been restored to normal and feedwater is being used.

Subsequent in the Reactor Scram, the 2A RHR Pump failed to start when manually initiating from the Main Control Room (for suppression pool cooling).

System isolations have been restored with exception of reactor water cleanup and the Reactor Recirculation Hydraulic Power Units on U-2.

The station is taking action to investigate the cause of the initial loss of 241Y and the unrelated failure to start of the 2A RHR pump. At this time, there appears to be a blown fuse for the 241Y bus Under Voltage logic which prevented the 2A RHR pump from starting.

The plant is stable.

The NRC resident inspector has been notified.