Event Notification Report for September 02, 2001
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/01/2001 - 09/02/2001
EVENT NUMBERS
38261
Power Reactor
Event Number: 38261
Facility: DUANE ARNOLD
Region: 3 State: IA
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MIKE HAUNER
HQ OPS Officer: BOB STRANSKY
Region: 3 State: IA
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MIKE HAUNER
HQ OPS Officer: BOB STRANSKY
Notification Date: 09/02/2001
Notification Time: 17:52 [ET]
Event Date: 09/02/2001
Event Time: 13:08 [CDT]
Last Update Date: 09/02/2001
Notification Time: 17:52 [ET]
Event Date: 09/02/2001
Event Time: 13:08 [CDT]
Last Update Date: 09/02/2001
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
PATRICK HILAND (R3)
PATRICK HILAND (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
HPCI SYSTEM DECLARED INOPERABLE
"The High Pressure Coolant Injection (HPCI) steam supply line drain trap developed a steam leak that required the drain trap to be manually isolated.
"At 1308, shortly after isolating the steam trap, the HPCI steam supply drain pot high level alarm was received; the HPCI system was declared inoperable and a 14-day LCO was entered per Technical Specification 3.5.1 Condition F.
"At 1326, the HPCI turbine auto start feature was defeated to mitigate the potential damage to the turbine and other components from water in the steam supply line.
"Unplanned HPCI system inoperability is reportable under 50.72(b)(3)(v)(D) as a single train failure that could have prevented the fulfillment of a safety function of structures or systems to mitigate the consequences of an accident."
The NRC resident inspector has been informed of this notification by the licensee.
"The High Pressure Coolant Injection (HPCI) steam supply line drain trap developed a steam leak that required the drain trap to be manually isolated.
"At 1308, shortly after isolating the steam trap, the HPCI steam supply drain pot high level alarm was received; the HPCI system was declared inoperable and a 14-day LCO was entered per Technical Specification 3.5.1 Condition F.
"At 1326, the HPCI turbine auto start feature was defeated to mitigate the potential damage to the turbine and other components from water in the steam supply line.
"Unplanned HPCI system inoperability is reportable under 50.72(b)(3)(v)(D) as a single train failure that could have prevented the fulfillment of a safety function of structures or systems to mitigate the consequences of an accident."
The NRC resident inspector has been informed of this notification by the licensee.