Event Notification Report for March 28, 2001

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
03/27/2001 - 03/28/2001

EVENT NUMBERS
378673786837869

Power Reactor
Event Number: 37867
Facility: GRAND GULF
Region: 4     State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: CHARLES BOTTEMILLER
HQ OPS Officer: STEVE SANDIN
Notification Date: 03/28/2001
Notification Time: 16:22 [ET]
Event Date: 03/28/2001
Event Time: 13:35 [CST]
Last Update Date: 03/28/2001
Emergency Class: NON EMERGENCY
10 CFR Section:
26.73 - FITNESS FOR DUTY
Person (Organization):
DAVE LOVELESS (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
FITNESS FOR DUTY REPORT INVOLVING A CONTRACT EMPLOYEE

A contract employee was determined to be under the influence of an illegal drug during a random test. The employee's access to the plant has been terminated.

The licensee informed the NRC resident inspector. Contact the Headquarters Operations Officer for additional details.


Power Reactor
Event Number: 37868
Facility: HARRIS
Region: 2     State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: R. J. FIELDS (via fax)
HQ OPS Officer: STEVE SANDIN
Notification Date: 03/28/2001
Notification Time: 16:47 [ET]
Event Date: 03/28/2001
Event Time: 00:00 [EST]
Last Update Date: 03/28/2001
Emergency Class: NON EMERGENCY
10 CFR Section:
21.21 - UNSPECIFIED PARAGRAPH
Person (Organization):
EDWARD MCALPINE (R2)
VERN HODGE (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
PART 21 REPORT INVOLVING REPLACEMENT SIEMENS ELECTRICAL BREAKER COMPONENTS NOT MEETING DESIGN SPECIFICATIONS

"On March 26, 2001, Carolina Power & Light Company (CP&L) determined the following condition to be reportable in accordance with 10 CFR Part 21.

"Description of Defect or Failure to Comply:

"Siemens RLN/RLNF breaker cubicle Mechanism Operated Cells (MOC) were supplied to the Harris Nuclear Plant (HNP) as replacements which do not match design specifications. The parts procured were received with improper push bar length and configuration. The length and configuration are critical characteristics of this component. Improper length and configuration of the push bar on the MOC can result in the MOC not actuating upon breaker closure as per design. These parts were received commercial grade and dedicated onsite by CP&L for use in safety-related applications. CP&L's inspection of critical characteristics failed to identify that the component was not manufactured in accordance with the approved design specifications. Therefore, the defective MOCs were available in HNP stores for installation in safety-related applications.

"HNP has identified a potential application where, had the subject MOC been installed, safety related functions designed to help mitigate the consequences of design basis events could have been lost.

"A more detailed 30 day report will be submitted to the NRC in accordance with 10 CFR 21.21 by April 25, 2001."


Power Reactor
Event Number: 37869
Facility: HATCH
Region: 2     State: GA
Unit: [1] [] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: ALAN WOLF
HQ OPS Officer: STEVE SANDIN
Notification Date: 03/28/2001
Notification Time: 20:50 [ET]
Event Date: 03/28/2001
Event Time: 18:53 [EST]
Last Update Date: 03/28/2001
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL 50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
EDWARD MCALPINE (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Shutdown
Event Text
UNIT 1 EXPERIENCED A GENERATOR TRIP FOR REASONS UNKNOWN

At 1853EST on 3/28/01, Unit 1 experienced a main generator trip, turbine trip and reactor scram. The first out indication showed "power load unbalance." There were no maintenance or surveillance activities ongoing at the time. All control rods fully inserted. During the transient reactor vessel water level decreased to a minimum of -31 (Div I) and -37 (Div II) inches as shown on level recorders. Both HPCI and RCIC initiated but did not inject due to level increasing above the -35 inches setpoint required for the injection valves to open. The four low-low pressure setpoint (1120 psig) SRVs, i.e., "A", "C", "G" and "F", opened and reseated controlling reactor pressure. Subsequent to the investigation, it was determined that the "B" SRV also momentarily lifted based on a review of computer edits and an approximate 10 degree F increase on the temperature recorder. The highest recorded pressure was 1125 psig. Group II isolations occurred as expected including initiation of the Standby Gas Treatment System. All isolations have been reset and the affected equipment restored to standby status.

Unit 1 is currently stable in hot shutdown with reactor pressure controlled using bypass valves to the main condenser. Condensate feed is in service supplying makeup with the reactor recirculation pumps at minimum speed. An event review team is responding to the site to determine the root cause. Three 230KV breakers, i.e., two generator output and one switchyard, opened during the transient. Unit 1 will remain shutdown pending the results of the investigation and completion of other scheduled maintenance.

The licensee informed the NRC resident inspector and does not plan a press release at this time.