Event Number: 37511
Facility: CATAWBA
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: KEVIN PHILLIPS
HQ OPS Officer: BOB STRANSKY
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: KEVIN PHILLIPS
HQ OPS Officer: BOB STRANSKY
Notification Date: 11/10/2000
Notification Time: 04:54 [ET]
Event Date: 11/10/2000
Event Time: 02:17 [EST]
Last Update Date: 11/10/2000
Notification Time: 04:54 [ET]
Event Date: 11/10/2000
Event Time: 02:17 [EST]
Last Update Date: 11/10/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
KERRY LANDIS (R2)
KERRY LANDIS (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
LOSS OF POWER TO 4kV ESF BUS DURING TESTING
"A failure of a voltage regulator transformer on 1B diesel generator occurred during a planned ESF test, requiring an emergency shutdown of the diesel generator. This resulted in a loss of power to 4160V essential bus 1ETB. Systems required for the current mode of operation were unaffected as the B train components were removed from service for the test. Power has been restored to the bus from offsite power at this time."
The NRC resident inspector has been informed of this event by the licensee.
"A failure of a voltage regulator transformer on 1B diesel generator occurred during a planned ESF test, requiring an emergency shutdown of the diesel generator. This resulted in a loss of power to 4160V essential bus 1ETB. Systems required for the current mode of operation were unaffected as the B train components were removed from service for the test. Power has been restored to the bus from offsite power at this time."
The NRC resident inspector has been informed of this event by the licensee.
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 37512
Facility: LASALLE
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: D. COVEYOU
HQ OPS Officer: BOB STRANSKY
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: D. COVEYOU
HQ OPS Officer: BOB STRANSKY
Notification Date: 11/10/2000
Notification Time: 09:52 [ET]
Event Date: 11/10/2000
Event Time: 06:10 [CST]
Last Update Date: 11/13/2000
Notification Time: 09:52 [ET]
Event Date: 11/10/2000
Event Time: 06:10 [CST]
Last Update Date: 11/13/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(C) - POT UNCNTRL RAD REL
10 CFR Section:
50.72(b)(2)(iii)(C) - POT UNCNTRL RAD REL
Person (Organization):
GEOFFREY WRIGHT (R3)
GEOFFREY WRIGHT (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | N | 0 | Hot Shutdown | 0 | Hot Shutdown |
OFFGAS ISOLATION VALVE FAILED TO CLOSE UPON DEMAND
"At 0610 on November 10, 2000, the offgas isolation valve to the station ventilation stack (2N62-F057) failed to close when the main control room control switch for the valve was placed in the 'close' position. The valve subsequently closed approximately 20 minutes later without other action taken. The valve is air operated and is designed to close upon receipt of a high offgas release rate or via the control switch. There were no abnormal radiological releases occurring at the time of the failure. The unit was in the process of being shut down for a planned refueling outage. No other problems occurred during the event. All systems operated as designed except as described. A prompt investigation has been initiated to determine the cause of the valve failure. Corrective actions will be taken to address the cause."
The NRC resident inspector has been informed of this event by the licensee.
* * * RETRACTED AT 1526 EST ON 11/13/00 BY DAN COVEYOU TO FANGIE JONES * * *
This event has been retracted. "Further investigation has determined that this valve serves no safety function. The investigation has determined that while the design of this valve is to close upon a high radiation condition, this is not an accident mitigation function. The equipment is not safety related nor single failure proof; there are no safety design bases for this valve."
The licensee has notified the NRC Resident Inspector. The R3DO (Bruce Jorgensen) has been notified.
"At 0610 on November 10, 2000, the offgas isolation valve to the station ventilation stack (2N62-F057) failed to close when the main control room control switch for the valve was placed in the 'close' position. The valve subsequently closed approximately 20 minutes later without other action taken. The valve is air operated and is designed to close upon receipt of a high offgas release rate or via the control switch. There were no abnormal radiological releases occurring at the time of the failure. The unit was in the process of being shut down for a planned refueling outage. No other problems occurred during the event. All systems operated as designed except as described. A prompt investigation has been initiated to determine the cause of the valve failure. Corrective actions will be taken to address the cause."
The NRC resident inspector has been informed of this event by the licensee.
* * * RETRACTED AT 1526 EST ON 11/13/00 BY DAN COVEYOU TO FANGIE JONES * * *
This event has been retracted. "Further investigation has determined that this valve serves no safety function. The investigation has determined that while the design of this valve is to close upon a high radiation condition, this is not an accident mitigation function. The equipment is not safety related nor single failure proof; there are no safety design bases for this valve."
The licensee has notified the NRC Resident Inspector. The R3DO (Bruce Jorgensen) has been notified.
Power Reactor
Event Number: 37513
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: BOB COOLIDGE
HQ OPS Officer: BOB STRANSKY
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: BOB COOLIDGE
HQ OPS Officer: BOB STRANSKY
Notification Date: 11/10/2000
Notification Time: 11:29 [ET]
Event Date: 11/10/2000
Event Time: 10:55 [EST]
Last Update Date: 11/10/2000
Notification Time: 11:29 [ET]
Event Date: 11/10/2000
Event Time: 10:55 [EST]
Last Update Date: 11/10/2000
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
MICHELE EVANS (R1)
TAD MARSH (NRR)
DAVID BARDEN (FEMA)
MICHELE EVANS (R1)
TAD MARSH (NRR)
DAVID BARDEN (FEMA)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNUSUAL EVENT DECLARED DUE TO FIRE ONSITE
The licensee declared an Unusual Event due to a small fire in the radwaste truck lock. Grinding was being performed as part of maintenance activities, igniting some material beneath the floor. The site fire brigade responded to the fire, but did not extinguish the fire within 10 minutes. The licensee believes that the fire has been extinguished, but there is still some smoke in the area. The licensee reported that the local fire department also responded to the site. No radiological release has occurred as a result of the fire.
The NRC resident inspector will be informed of this event by the licensee.
* * * UPDATE AT 1220 ON 11/10/00 BY COOLIDGE, RECEIVED BY WEAVER ***
The licensee terminated the Unusual event at 1217. The fire is out, there was no extension and all air samples measured showed no airborne contamination. The resident inspector has been informed.
The operations center notified the RDO (Evans); EO (Marsh) and Fema (Eches).
The licensee declared an Unusual Event due to a small fire in the radwaste truck lock. Grinding was being performed as part of maintenance activities, igniting some material beneath the floor. The site fire brigade responded to the fire, but did not extinguish the fire within 10 minutes. The licensee believes that the fire has been extinguished, but there is still some smoke in the area. The licensee reported that the local fire department also responded to the site. No radiological release has occurred as a result of the fire.
The NRC resident inspector will be informed of this event by the licensee.
* * * UPDATE AT 1220 ON 11/10/00 BY COOLIDGE, RECEIVED BY WEAVER ***
The licensee terminated the Unusual event at 1217. The fire is out, there was no extension and all air samples measured showed no airborne contamination. The resident inspector has been informed.
The operations center notified the RDO (Evans); EO (Marsh) and Fema (Eches).
Power Reactor
Event Number: 37514
Facility: POINT BEACH
Region: 3 State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: RANDY HASTINGS
HQ OPS Officer: DOUG WEAVER
Region: 3 State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: RANDY HASTINGS
HQ OPS Officer: DOUG WEAVER
Notification Date: 11/10/2000
Notification Time: 13:33 [ET]
Event Date: 11/10/2000
Event Time: 10:29 [CST]
Last Update Date: 11/10/2000
Notification Time: 13:33 [ET]
Event Date: 11/10/2000
Event Time: 10:29 [CST]
Last Update Date: 11/10/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
GEOFFREY WRIGHT (R3)
GEOFFREY WRIGHT (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | N | 0 | Refueling | 0 | Refueling |
ESF ACTUATION - EMERGENCY DIESEL GENERATOR STARTS
During the performance of the procedure for protective relay calibration and testing on Unit 2 Safeguards Bus 2A06, an undervoltage signal was generated on bus 2A06. The undervoltage signal was generated when the technicians checked the continuity between two test points on bus 2A06 as specified in the procedure. On the undervoltage signal, the main feed breaker to bus 2A06 opened, bus 2A06 de-energized G-03 Emergency Diesel Generator (EDG) started, G-04 EDG started, and the G-04 EDG output breaker closed to re-energize bus 2A06. These actuations are as designed for an undervoltage condition on bus 2A06.
Unit 2 is currently defueled in a refueling outage. Spent fuel pool cooling was not interrupted. Unit 1 is at 100% power.
The appropriate Abnormal Operating Procedure was entered and completed. G-03 EDG, which was running unloaded, has been shutdown. After determining the cause of the undervoltage and verifying bus 2A06 condition was acceptable, we have re-established normal offsite power to bus 2A06. G-04 EDG has been shutdown.
The licensee is investigating the cause of this event. The NRC resident inspector has been notified.
During the performance of the procedure for protective relay calibration and testing on Unit 2 Safeguards Bus 2A06, an undervoltage signal was generated on bus 2A06. The undervoltage signal was generated when the technicians checked the continuity between two test points on bus 2A06 as specified in the procedure. On the undervoltage signal, the main feed breaker to bus 2A06 opened, bus 2A06 de-energized G-03 Emergency Diesel Generator (EDG) started, G-04 EDG started, and the G-04 EDG output breaker closed to re-energize bus 2A06. These actuations are as designed for an undervoltage condition on bus 2A06.
Unit 2 is currently defueled in a refueling outage. Spent fuel pool cooling was not interrupted. Unit 1 is at 100% power.
The appropriate Abnormal Operating Procedure was entered and completed. G-03 EDG, which was running unloaded, has been shutdown. After determining the cause of the undervoltage and verifying bus 2A06 condition was acceptable, we have re-established normal offsite power to bus 2A06. G-04 EDG has been shutdown.
The licensee is investigating the cause of this event. The NRC resident inspector has been notified.
Power Reactor
Event Number: 37515
Facility: CATAWBA
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: PAUL MCINTYRE
HQ OPS Officer: DOUG WEAVER
Region: 2 State: SC
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: PAUL MCINTYRE
HQ OPS Officer: DOUG WEAVER
Notification Date: 11/10/2000
Notification Time: 14:31 [ET]
Event Date: 11/10/2000
Event Time: 11:07 [EST]
Last Update Date: 11/10/2000
Notification Time: 14:31 [ET]
Event Date: 11/10/2000
Event Time: 11:07 [EST]
Last Update Date: 11/10/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
KERRY LANDIS (R2)
KERRY LANDIS (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
ESF ACTUATION
ESF actuation due to a invalid Train B Safety Injection signal. No ECCS system discharge to the Reactor Coolant System occurred. The event cause appears to be a procedure deficiency during scheduled calibration / testing of a Pressurizer Pressure instrument channel. The calibration procedure did not require adequate verification of other channel parameters prior to removing this channel from service, and did not veify blocks normally in place for this plant condition. One channel of Pressurizer Pressure was already in a tripped condition when this channel was removed from service. This satisfied the two out of four logic to initiate the Safety Injection signal. Only the Train B equipment was actuated.
The licensee notified the NRC resident inspector.
ESF actuation due to a invalid Train B Safety Injection signal. No ECCS system discharge to the Reactor Coolant System occurred. The event cause appears to be a procedure deficiency during scheduled calibration / testing of a Pressurizer Pressure instrument channel. The calibration procedure did not require adequate verification of other channel parameters prior to removing this channel from service, and did not veify blocks normally in place for this plant condition. One channel of Pressurizer Pressure was already in a tripped condition when this channel was removed from service. This satisfied the two out of four logic to initiate the Safety Injection signal. Only the Train B equipment was actuated.
The licensee notified the NRC resident inspector.