Event Notification Report for October 21, 2000
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/20/2000 - 10/21/2000
Power Reactor
Event Number: 37445
Facility: TURKEY POINT
Region: 2 State: FL
Unit: [] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: BOB STEWART
HQ OPS Officer: FANGIE JONES
Region: 2 State: FL
Unit: [] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: BOB STEWART
HQ OPS Officer: FANGIE JONES
Notification Date: 10/21/2000
Notification Time: 05:23 [ET]
Event Date: 10/21/2000
Event Time: 04:25 [EDT]
Last Update Date: 10/21/2000
Notification Time: 05:23 [ET]
Event Date: 10/21/2000
Event Time: 04:25 [EDT]
Last Update Date: 10/21/2000
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED 50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED 50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
CAUDLE JULIAN (R2)
BRUCE BOGER (NRR)
FRANK CONGEL (IRO)
GENE CANUPP (FEMA)
CAUDLE JULIAN (R2)
BRUCE BOGER (NRR)
FRANK CONGEL (IRO)
GENE CANUPP (FEMA)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 4 | N | N | 0 | Hot Standby | 0 | Hot Standby |
UNUSUAL EVENT DECLARED DUE TO LOSS OF OFFSITE POWER TO THE VITAL BUSSES
An unusual event was declared at 0435 EDT on 10/21/00 due to the loss of offsite power to the 4 kv vital busses. The startup transformer was tripped due to a lockout for an unknown reason. Both emergency diesel generators started and energized their respective busses. The licensee is investigating the cause of the lockout. The unusual event will be exited when offsite power is restored to the vital busses.
The licensee has notified the state and local authorities and intends to notify the NRC Resident Inspector.
* * * UPDATE AT 0620 EDT ON 10/21/00 BY BOB STEWART TO FANGIE JONES * * *
During attempts to restore offsite power a safety injection occurred at 0553 EDT due to differential pressure on the steam lines. The main steam isolation valves were closed with main steam line pressure indication nulled at 585 psig and steam generator pressure dropped to 485 psig during the cooldown giving the 100 psid for the safety injection. The licensee was slowed by natural circulation in the process of reducing reactor coolant system pressure to clear the override setpoint for the safety injection, but didn't make it. When the safety injection occurred all equipment operated as required.
Offsite power was restored at 0616 EDT and the emergency diesel generators were being shutdown. The licensee is waiting to ensure the startup transformer is stable prior to exiting the unusual event.
The licensee notified the NRC Resident Inspector. The R2DO (Caudle Julian), NRR EO (Bruce Boger) and the IRO (Frank Congel) have been informed.
* * * UPDATE AT 0701 EDT ON 10/21/00 BY BOB STEWART TO FANGIE JONES * * *
The licensee exited the unusual event at 0645 EDT. The safety injection has been terminated and the plant is stable in mode 3 with one reactor coolant pump running. The cause of the loss of the startup transformer was due to a short in a backup relay for breaker protection.
The licensee has notified the NRC Resident Inspector and the state and local authorities. The R2DO (Caudle Julian), NRR EO (Bruce Boger) and the IRO (Frank Congel) have been informed.
An unusual event was declared at 0435 EDT on 10/21/00 due to the loss of offsite power to the 4 kv vital busses. The startup transformer was tripped due to a lockout for an unknown reason. Both emergency diesel generators started and energized their respective busses. The licensee is investigating the cause of the lockout. The unusual event will be exited when offsite power is restored to the vital busses.
The licensee has notified the state and local authorities and intends to notify the NRC Resident Inspector.
* * * UPDATE AT 0620 EDT ON 10/21/00 BY BOB STEWART TO FANGIE JONES * * *
During attempts to restore offsite power a safety injection occurred at 0553 EDT due to differential pressure on the steam lines. The main steam isolation valves were closed with main steam line pressure indication nulled at 585 psig and steam generator pressure dropped to 485 psig during the cooldown giving the 100 psid for the safety injection. The licensee was slowed by natural circulation in the process of reducing reactor coolant system pressure to clear the override setpoint for the safety injection, but didn't make it. When the safety injection occurred all equipment operated as required.
Offsite power was restored at 0616 EDT and the emergency diesel generators were being shutdown. The licensee is waiting to ensure the startup transformer is stable prior to exiting the unusual event.
The licensee notified the NRC Resident Inspector. The R2DO (Caudle Julian), NRR EO (Bruce Boger) and the IRO (Frank Congel) have been informed.
* * * UPDATE AT 0701 EDT ON 10/21/00 BY BOB STEWART TO FANGIE JONES * * *
The licensee exited the unusual event at 0645 EDT. The safety injection has been terminated and the plant is stable in mode 3 with one reactor coolant pump running. The cause of the loss of the startup transformer was due to a short in a backup relay for breaker protection.
The licensee has notified the NRC Resident Inspector and the state and local authorities. The R2DO (Caudle Julian), NRR EO (Bruce Boger) and the IRO (Frank Congel) have been informed.
Power Reactor
Event Number: 37446
Facility: GINNA
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: SCOTT REED
HQ OPS Officer: BOB STRANSKY
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: SCOTT REED
HQ OPS Officer: BOB STRANSKY
Notification Date: 10/21/2000
Notification Time: 17:58 [ET]
Event Date: 10/21/2000
Event Time: 14:18 [EDT]
Last Update Date: 10/21/2000
Notification Time: 17:58 [ET]
Event Date: 10/21/2000
Event Time: 14:18 [EDT]
Last Update Date: 10/21/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
WILLIAM COOK (R1)
WILLIAM COOK (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 70 | Power Operation | 0 | Hot Standby |
MANUAL REACTOR TRIP DUE TO LOSS OF CIRCULATING WATER PUMP
Operators manually tripped the unit from 70% power, in accordance with plant procedures, after the 'B' circulating water pump tripped. Following the trip, all systems functioned as expected, with the following exceptions: the main feedwater pumps tripped due to seal differential pressure problems, and intermediate range neutron monitoring channel N-36 failed downscale. The licensee is investigating these problems, as well as the cause of the circulating water pump trip.
The NRC resident inspector has been informed of this event by the licensee.
Operators manually tripped the unit from 70% power, in accordance with plant procedures, after the 'B' circulating water pump tripped. Following the trip, all systems functioned as expected, with the following exceptions: the main feedwater pumps tripped due to seal differential pressure problems, and intermediate range neutron monitoring channel N-36 failed downscale. The licensee is investigating these problems, as well as the cause of the circulating water pump trip.
The NRC resident inspector has been informed of this event by the licensee.
Power Reactor
Event Number: 37447
Facility: DIABLO CANYON
Region: 4 State: CA
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DAVID PIERCE
HQ OPS Officer: FANGIE JONES
Region: 4 State: CA
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DAVID PIERCE
HQ OPS Officer: FANGIE JONES
Notification Date: 10/22/2000
Notification Time: 00:22 [ET]
Event Date: 10/21/2000
Event Time: 18:00 [PDT]
Last Update Date: 10/22/2000
Notification Time: 00:22 [ET]
Event Date: 10/21/2000
Event Time: 18:00 [PDT]
Last Update Date: 10/22/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
JOHN PELLET (R4)
JOHN PELLET (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
ESF LOAD SHED SIGNAL GENERATED WHILE RESTORING RELAYS
"While restoring vital 4160 Bus G Auto-Transfer Relays to service, a shed load signal was initiated to the Bus G components, apparently due to Bus G First Level Undervoltage Relays not resetting after they were energized. When the Feature Cutout Switch was subsequently cut-in to the Load Shed Relay (27XHGT) the load shed was then actuated. The only load available to be shed was Auxiliary Salt Water Pp 1-2 which shut down. Auxiliary Saltwater was aligned from Unit 2 at 1805 (PDT) and remained in that configuration until 1940 (PDT), when Auxiliary Saltwater Pp 1-1 was placed in service. DCPP Unit One is currently in its 10th Refueling Outage, with the core off-loaded to the Spent Fuel Pool. The temperature of the Spent Fuel Pool did not change. The cause of the event is under investigation."
The licensee intends to notify the NRC Resident Inspector.
"While restoring vital 4160 Bus G Auto-Transfer Relays to service, a shed load signal was initiated to the Bus G components, apparently due to Bus G First Level Undervoltage Relays not resetting after they were energized. When the Feature Cutout Switch was subsequently cut-in to the Load Shed Relay (27XHGT) the load shed was then actuated. The only load available to be shed was Auxiliary Salt Water Pp 1-2 which shut down. Auxiliary Saltwater was aligned from Unit 2 at 1805 (PDT) and remained in that configuration until 1940 (PDT), when Auxiliary Saltwater Pp 1-1 was placed in service. DCPP Unit One is currently in its 10th Refueling Outage, with the core off-loaded to the Spent Fuel Pool. The temperature of the Spent Fuel Pool did not change. The cause of the event is under investigation."
The licensee intends to notify the NRC Resident Inspector.