Event Notification Report for July 18, 2000
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
07/17/2000 - 07/18/2000
Power Reactor
Event Number: 37174
Facility: QUAD CITIES
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: NORTON
HQ OPS Officer: CHAUNCEY GOULD
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: NORTON
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/18/2000
Notification Time: 08:29 [ET]
Event Date: 07/18/2000
Event Time: 05:48 [CDT]
Last Update Date: 07/18/2000
Notification Time: 08:29 [ET]
Event Date: 07/18/2000
Event Time: 05:48 [CDT]
Last Update Date: 07/18/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
MICHAEL PARKER (R3)
MICHAEL PARKER (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | A/R | Y | 100 | Power Operation | 0 | Hot Shutdown |
REACTOR SCRAM FROM 100% POWER DUE TO A GENERATOR LOAD REJECT FOLLOWED BY TURBINE TRIP.
THE UNIT 2 REACTOR SCRAM WAS RECEIVED DUE TO A GENERATOR LOAD REJECT APPARENTLY CAUSED BY A DISTURBANCE ON THE 345 KV SYSTEM. ALL RODS FULLY INSERTED, NO INJECTION INITIATED AND NO SAFETY/RELIEF VALVES LIFTED. THEY ALSO HAD GROUP 2 AND GROUP 3 ISOLATIONS, AS EXPECTED, DUE TO A REACTOR WATER LEVEL LOW SIGNAL FOLLOWING THE REACTOR SCRAM. THE UNIT 2 AND SHARED EMERGENCY DIESEL GENERATORS AUTOSTARTED AND RAN UNLOADED AS THE RESULT OF THE AUTOMATIC BUS TRANSFERS.
UNIT 1 REMAINS AT 100% POWER WITH ITS RESERVE AUXILIARY TRANSFORMER DE-ENERGIZED AND UNIT 2 IS IN MODE 3 WITH ITS NORMAL WATER LEVEL BAND. THE CAUSE OF THIS EVENT, WHICH PROBABLY OCCURRED OUTSIDE THE YARD, IS STILL BEING INVESTIGATED.
THE SECTIONS OF THE RING BUS THAT THEY LOST LEFT UNIT 1 WITHOUT ITS RESERVE AUXILIARY TRANSFORMER, SO IT IS RUNNING OFF ITS AUXILIARY TRANSFORMER.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE.
THE UNIT 2 REACTOR SCRAM WAS RECEIVED DUE TO A GENERATOR LOAD REJECT APPARENTLY CAUSED BY A DISTURBANCE ON THE 345 KV SYSTEM. ALL RODS FULLY INSERTED, NO INJECTION INITIATED AND NO SAFETY/RELIEF VALVES LIFTED. THEY ALSO HAD GROUP 2 AND GROUP 3 ISOLATIONS, AS EXPECTED, DUE TO A REACTOR WATER LEVEL LOW SIGNAL FOLLOWING THE REACTOR SCRAM. THE UNIT 2 AND SHARED EMERGENCY DIESEL GENERATORS AUTOSTARTED AND RAN UNLOADED AS THE RESULT OF THE AUTOMATIC BUS TRANSFERS.
UNIT 1 REMAINS AT 100% POWER WITH ITS RESERVE AUXILIARY TRANSFORMER DE-ENERGIZED AND UNIT 2 IS IN MODE 3 WITH ITS NORMAL WATER LEVEL BAND. THE CAUSE OF THIS EVENT, WHICH PROBABLY OCCURRED OUTSIDE THE YARD, IS STILL BEING INVESTIGATED.
THE SECTIONS OF THE RING BUS THAT THEY LOST LEFT UNIT 1 WITHOUT ITS RESERVE AUXILIARY TRANSFORMER, SO IT IS RUNNING OFF ITS AUXILIARY TRANSFORMER.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE.
Power Reactor
Event Number: 37176
Facility: DUANE ARNOLD
Region: 3 State: IA
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: BOB MURRELL
HQ OPS Officer: DICK JOLLIFFE
Region: 3 State: IA
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: BOB MURRELL
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 07/18/2000
Notification Time: 14:17 [ET]
Event Date: 07/18/2000
Event Time: 12:12 [CDT]
Last Update Date: 07/18/2000
Notification Time: 14:17 [ET]
Event Date: 07/18/2000
Event Time: 12:12 [CDT]
Last Update Date: 07/18/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
MICHAEL PARKER (R3)
MICHAEL PARKER (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
- UNEXPECTED ESF ACTUATION DURING PREPLANNED MAINTENANCE ACTIVITIES -
At 1212 CDT on 07/18/00, during preplanned maintenance activities on the 'B' standby gas treatment system logic, an unexpected, invalid ESF actuation occurred. Specifically, a planned fuse removal resulted in an unexpected isolation of a containment nitrogen makeup valve and a recirc minipurge valve. All isolations were completed, as designed. The licensee plans to restore all components to their normal positions prior to completing the maintenance activities.
The licensee notified the NRC Resident Inspector.
At 1212 CDT on 07/18/00, during preplanned maintenance activities on the 'B' standby gas treatment system logic, an unexpected, invalid ESF actuation occurred. Specifically, a planned fuse removal resulted in an unexpected isolation of a containment nitrogen makeup valve and a recirc minipurge valve. All isolations were completed, as designed. The licensee plans to restore all components to their normal positions prior to completing the maintenance activities.
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 37177
Facility: GINNA
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: DOUG GOMEZ/RON TEED
HQ OPS Officer: DICK JOLLIFFE
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] W-2-LP
NRC Notified By: DOUG GOMEZ/RON TEED
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 07/18/2000
Notification Time: 19:40 [ET]
Event Date: 07/18/2000
Event Time: 18:45 [EDT]
Last Update Date: 07/18/2000
Notification Time: 19:40 [ET]
Event Date: 07/18/2000
Event Time: 18:45 [EDT]
Last Update Date: 07/18/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
GREGORY CRANSTON (R1)
GREGORY CRANSTON (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
PHYSICAL SECURITY EVENT -
ATTEMPTED INTRODUCTION OF CONTRABAND INTO THE PLANT PROTECTED AREA. COMPENSATORY MEASURES WERE IMMEDIATELY TAKEN UPON DISCOVERY. THE LICENSEE PLANS TO NOTIFY THE NRC RESIDENT INSPECTOR. CONTACT THE NRC OPERATIONS OFFICER FOR ADDITIONAL DETAILS.
ATTEMPTED INTRODUCTION OF CONTRABAND INTO THE PLANT PROTECTED AREA. COMPENSATORY MEASURES WERE IMMEDIATELY TAKEN UPON DISCOVERY. THE LICENSEE PLANS TO NOTIFY THE NRC RESIDENT INSPECTOR. CONTACT THE NRC OPERATIONS OFFICER FOR ADDITIONAL DETAILS.