Event Number: 37141
Facility: SUSQUEHANNA
Region: 1 State: PA
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: FITCH
HQ OPS Officer: CHAUNCEY GOULD
Region: 1 State: PA
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: FITCH
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/04/2000
Notification Time: 14:13 [ET]
Event Date: 07/04/2000
Event Time: 11:54 [EDT]
Last Update Date: 07/04/2000
Notification Time: 14:13 [ET]
Event Date: 07/04/2000
Event Time: 11:54 [EDT]
Last Update Date: 07/04/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
STEVEN DENNIS (R1)
STEVEN DENNIS (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
THE PLANT HAD ESF ACTUATIONS DUE TO LOSS OF THE "B" RPS BUS.
"While operating at 100% power, Susquehanna Unit 2, experienced ESF actuations for containment isolations as a result of an unexpected loss of "B" RPS Bus caused by a trip of the RPS MG Set Output Breaker. All containment isolations associated with a loss of "B" RPS Bus actuated and went to completion. "B" RPS power was swapped to the alternate power supply and affected systems restored to normal configuration."
The actuations received were cooling water to recirc pump isolation, RWCU isolation, containment sampling isolation, reactor building secondary containment isolations and coolant sampling isolations. They also had standby gas treatment initiation. The cause of the trip of the MG set is being investigated.
The NRC Resident Inspector was notified.
"While operating at 100% power, Susquehanna Unit 2, experienced ESF actuations for containment isolations as a result of an unexpected loss of "B" RPS Bus caused by a trip of the RPS MG Set Output Breaker. All containment isolations associated with a loss of "B" RPS Bus actuated and went to completion. "B" RPS power was swapped to the alternate power supply and affected systems restored to normal configuration."
The actuations received were cooling water to recirc pump isolation, RWCU isolation, containment sampling isolation, reactor building secondary containment isolations and coolant sampling isolations. They also had standby gas treatment initiation. The cause of the trip of the MG set is being investigated.
The NRC Resident Inspector was notified.