Event Notification Report for May 24, 2000
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/23/2000 - 05/24/2000
EVENT NUMBERS
37030370253702637027
Power Reactor
Event Number: 37030
Facility: HOPE CREEK
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: SERATA
HQ OPS Officer: CHAUNCEY GOULD
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: SERATA
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/24/2000
Notification Time: 20:27 [ET]
Event Date: 05/24/2000
Event Time: 18:04 [EDT]
Last Update Date: 05/24/2000
Notification Time: 20:27 [ET]
Event Date: 05/24/2000
Event Time: 18:04 [EDT]
Last Update Date: 05/24/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
DAN HOLODY (R1)
JOSEPH GIITTER (IRO)
JACK CRLENJAK (R1)
JOHN HANNON (NRR)
JOHN ZWOLINSKI (NRR)
DAN HOLODY (R1)
JOSEPH GIITTER (IRO)
JACK CRLENJAK (R1)
JOHN HANNON (NRR)
JOHN ZWOLINSKI (NRR)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 19 | Power Operation | 19 | Power Operation |
MAIN TRANSFORMER EXPLOSION AND FIRE WITHIN FIVE FEET OF THE TURBINE BUILDING.
PRIOR TO THE EVENT, THEY HAD JUST CLOSED THE MAIN TURBINE AND GENERATOR OUTPUT BREAKERS SO THAT THE TURBINE WOULD SYNCHRONIZE TO THE GRID. AT 1804 A MAIN TURBINE TRIP AND MAIN TRANSFORMER TROUBLE ALARM WAS RECEIVED IN THE CONTROL ROOM. SUBSEQUENT TO THE TURBINE TRIP, MAIN GENERATOR TRANSFORMER FIRE ALARMS WERE RECEIVED AND VISUAL VERIFICATIONS CONFIRMED A FIRE ON THE "C" PHASE OF THE MAIN GENERATOR TRANSFORMER. THE FIRE DELUGE SYSTEM ACTIVATED, AND ALTHOUGH EXTERNAL INDICATION THE FIRE HAD CEASED, IT IS EXPECTED THAT THE FIRE CONTINUES TO BURN INTERNALLY TO THE TRANSFORMER. ALL OFFSITE POWER SOURCES ARE STILL AVAILABLE. NO OFFSITE FIRE ASSISTANCE HAS BEEN REQUESTED. THE FIRE HAS BEEN ONGOING INTERNALLY FOR APPROXIMATELY TWO HOURS. THEY ARE IN THE PROCESS OF ELECTRICALLY ISOLATING THE TRANSFORMER FROM BOTH THE GENERATOR AND THE GRID AND TAGGING IT OUT. DELUGE ACTUATION HAS BEEN SECURED AND THEY ARE SPRAYING THE TRANSFORMER WITH FIRE WATER. THEY ARE ALSO MAKING PREPARATIONS TO USE A FOAM FIRE SUPPRESSION AGENT.
FURTHER EVALUATION CONTINUES IN REGARD TO THE ENVIRONMENTAL IMPLICATIONS OF THE EVENT. SPECIFICALLY, THE ABILITY OF THE PLANT OIL WASTE SYSTEM TO PROPERLY PROCESS THE MIXTURE OF WATER AND OIL THAT WERE PRODUCTS OF THE COMPONENT FAILURE AND SUBSEQUENT FIRE FIGHTING EFFORTS.
THE LICENSEE WILL KEEP THE NRC INFORMED OF ANY ADVERSE CHANGES.
THE NRC RESIDENT INSPECTOR WILL BE INFORMED.
PRIOR TO THE EVENT, THEY HAD JUST CLOSED THE MAIN TURBINE AND GENERATOR OUTPUT BREAKERS SO THAT THE TURBINE WOULD SYNCHRONIZE TO THE GRID. AT 1804 A MAIN TURBINE TRIP AND MAIN TRANSFORMER TROUBLE ALARM WAS RECEIVED IN THE CONTROL ROOM. SUBSEQUENT TO THE TURBINE TRIP, MAIN GENERATOR TRANSFORMER FIRE ALARMS WERE RECEIVED AND VISUAL VERIFICATIONS CONFIRMED A FIRE ON THE "C" PHASE OF THE MAIN GENERATOR TRANSFORMER. THE FIRE DELUGE SYSTEM ACTIVATED, AND ALTHOUGH EXTERNAL INDICATION THE FIRE HAD CEASED, IT IS EXPECTED THAT THE FIRE CONTINUES TO BURN INTERNALLY TO THE TRANSFORMER. ALL OFFSITE POWER SOURCES ARE STILL AVAILABLE. NO OFFSITE FIRE ASSISTANCE HAS BEEN REQUESTED. THE FIRE HAS BEEN ONGOING INTERNALLY FOR APPROXIMATELY TWO HOURS. THEY ARE IN THE PROCESS OF ELECTRICALLY ISOLATING THE TRANSFORMER FROM BOTH THE GENERATOR AND THE GRID AND TAGGING IT OUT. DELUGE ACTUATION HAS BEEN SECURED AND THEY ARE SPRAYING THE TRANSFORMER WITH FIRE WATER. THEY ARE ALSO MAKING PREPARATIONS TO USE A FOAM FIRE SUPPRESSION AGENT.
FURTHER EVALUATION CONTINUES IN REGARD TO THE ENVIRONMENTAL IMPLICATIONS OF THE EVENT. SPECIFICALLY, THE ABILITY OF THE PLANT OIL WASTE SYSTEM TO PROPERLY PROCESS THE MIXTURE OF WATER AND OIL THAT WERE PRODUCTS OF THE COMPONENT FAILURE AND SUBSEQUENT FIRE FIGHTING EFFORTS.
THE LICENSEE WILL KEEP THE NRC INFORMED OF ANY ADVERSE CHANGES.
THE NRC RESIDENT INSPECTOR WILL BE INFORMED.
Power Reactor
Event Number: 37025
Facility: WATERFORD
Region: 4 State: LA
Unit: [3] [] []
RX Type: [3] CE
NRC Notified By: SCOTT
HQ OPS Officer: CHAUNCEY GOULD
Region: 4 State: LA
Unit: [3] [] []
RX Type: [3] CE
NRC Notified By: SCOTT
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/24/2000
Notification Time: 14:45 [ET]
Event Date: 05/24/2000
Event Time: 12:50 [CDT]
Last Update Date: 05/24/2000
Notification Time: 14:45 [ET]
Event Date: 05/24/2000
Event Time: 12:50 [CDT]
Last Update Date: 05/24/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
CLAUDE JOHNSON (R4)
CLAUDE JOHNSON (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
DISCOVERY OF COMPROMISE OF CLASSIFIED DOCUMENTS/SAFEGUARDS INFORMATION.
IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY.
REFER HOO LOG FOR ADDITIONAL DETAILS.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED.
IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY.
REFER HOO LOG FOR ADDITIONAL DETAILS.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED.
Power Reactor
Event Number: 37026
Facility: POINT BEACH
Region: 3 State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: ROBBINS
HQ OPS Officer: CHAUNCEY GOULD
Region: 3 State: WI
Unit: [1] [2] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: ROBBINS
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/24/2000
Notification Time: 15:48 [ET]
Event Date: 05/24/2000
Event Time: 14:08 [CDT]
Last Update Date: 05/24/2000
Notification Time: 15:48 [ET]
Event Date: 05/24/2000
Event Time: 14:08 [CDT]
Last Update Date: 05/24/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
Person (Organization):
GEOFFREY WRIGHT (R3)
GEOFFREY WRIGHT (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
LOSS OF VENTILATION TO PAB BATTERY AND INVERTER ROOMS DURING AN APPENDIX R FIRE
DURING THE FINAL REVIEW OF THE NEW APPENDIX R REBASELINE PROJECT IT WAS DISCOVERED THAT VENTILATION TO THE PAB BATTERY AND INVERTER ROOMS WOULD BE LOST FOR GREATER THAN 2 HOURS FOR AN APPENDIX R FIRE. FIRE ROUNDS IN THE AFFECTED AREAS HAVE BEEN STARTED AND PROCEDURE REVISIONS ARE IN PROGRESS TO ESTABLISH PORTABLE VENTILATION AS NEEDED.
THE NRC RESIDENT INSPECTOR WILL BE NOTIFIED.
DURING THE FINAL REVIEW OF THE NEW APPENDIX R REBASELINE PROJECT IT WAS DISCOVERED THAT VENTILATION TO THE PAB BATTERY AND INVERTER ROOMS WOULD BE LOST FOR GREATER THAN 2 HOURS FOR AN APPENDIX R FIRE. FIRE ROUNDS IN THE AFFECTED AREAS HAVE BEEN STARTED AND PROCEDURE REVISIONS ARE IN PROGRESS TO ESTABLISH PORTABLE VENTILATION AS NEEDED.
THE NRC RESIDENT INSPECTOR WILL BE NOTIFIED.
Power Reactor
Event Number: 37027
Facility: BROWNS FERRY
Region: 2 State: AL
Unit: [] [] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: GOLDEN
HQ OPS Officer: CHAUNCEY GOULD
Region: 2 State: AL
Unit: [] [] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: GOLDEN
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/24/2000
Notification Time: 15:50 [ET]
Event Date: 05/24/2000
Event Time: 13:54 [CDT]
Last Update Date: 05/24/2000
Notification Time: 15:50 [ET]
Event Date: 05/24/2000
Event Time: 13:54 [CDT]
Last Update Date: 05/24/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(iv) - ECCS INJECTION 50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(1)(iv) - ECCS INJECTION 50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
MARK LESSER (R2)
JOHN HANNON (NRR)
JOSEPH GIITTER (IRO)
MARK LESSER (R2)
JOHN HANNON (NRR)
JOSEPH GIITTER (IRO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | A/R | Y | 100 | Power Operation | 0 | Hot Standby |
THE PLANT HAD A REACTOR SCRAM FROM 100% POWER DUE TO LOW REACTOR WATER LEVEL
At 13:54 CDT, unit 3 reactor scrammed due to low reactor water level. All rods fully inserted into the core. The expected groups 2, 3, 6 and 8 isolations were received. Both recirc pumps tripped, all Standby Gas Treatment trains started and the 'A' CREV started. The expected Refuel zone and unit 3 reactor zone isolations were received. Both the HPCI system and the RCIC system automatically initiated and injected due to low level following the scram. The actual signal perturbation that caused the reactor trip on low water level is still being investigated. Currently the plant is in a stable condition in mode 3 with investigations in progress. No relief valves lifted and HPCI was secured within the first 5 minutes and RCIC secured a few minutes later.
The NRC Resident Inspector was notified.
At 13:54 CDT, unit 3 reactor scrammed due to low reactor water level. All rods fully inserted into the core. The expected groups 2, 3, 6 and 8 isolations were received. Both recirc pumps tripped, all Standby Gas Treatment trains started and the 'A' CREV started. The expected Refuel zone and unit 3 reactor zone isolations were received. Both the HPCI system and the RCIC system automatically initiated and injected due to low level following the scram. The actual signal perturbation that caused the reactor trip on low water level is still being investigated. Currently the plant is in a stable condition in mode 3 with investigations in progress. No relief valves lifted and HPCI was secured within the first 5 minutes and RCIC secured a few minutes later.
The NRC Resident Inspector was notified.