Event Notification Report for May 14, 2000
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
05/13/2000 - 05/14/2000
EVENT NUMBERS
37000
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 37000
Facility: GRAND GULF
Region: 4 State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: HANKS
HQ OPS Officer: CHAUNCEY GOULD
Region: 4 State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: HANKS
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/14/2000
Notification Time: 20:01 [ET]
Event Date: 05/14/2000
Event Time: 15:05 [CDT]
Last Update Date: 05/17/2000
Notification Time: 20:01 [ET]
Event Date: 05/14/2000
Event Time: 15:05 [CDT]
Last Update Date: 05/17/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
CHARLES CAIN (R4)
CHARLES CAIN (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
THE LICENSEE DECLARED THE DIVISION 3 EMERGENCY DIESEL GENERATOR (EDG) INOPERABLE AND THE PLANT ENTERED AN LCO ACTION STATEMENT.
THE DIVISION 3 EDG WAS DECLARED INOPERABLE DUE TO THE SOAK BACK PUMP (SUPPLIES LUBE OIL TO THE DIESEL SO THAT IT IS READY TO START) TRIP FAILURE. THE CAUSE OF THE FAILURE IS A FAULTY RELAY FOR THE PUMP. THEY WILL REPLACE THIS RELAY. THIS EDG SUPPORTS THE HIGH PRESSURE CORE SPRAY (HPCS) SYSTEM FOR SAFETY FUNCTIONS. THE HPCS SYSTEM HAS NOT BEEN DECLARED INOPERABLE AND THE DIVISION 3 EDG IS STILL FUNCTIONAL. THE PLANT HAS 12 HOURS TO BE IN CONDITION 3 AND 36 HOURS TO BE IN CONDITION 4.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED.
* * * RETRACTED AT 1155 EDT ON 5/17/00 BY CHRIS MILLER TO FANGIE JONES * * *
The licensee is retracting this event notification, after further review, it was determined that this event was not reportable as there was a 72 hour delay before action to shut down the plant became necessary. Offsite power was in service and the other EDG was available and in accordance with Tech Specs the licensee had 72 hours to restore the EDG before further action was necessary The Division 2 EDG was returned to service well within the 72 hours.
The licensee informed the NRC Resident Inspector. The R4DO (Bill Jones) was notified by the NRC Operations Officer.
THE DIVISION 3 EDG WAS DECLARED INOPERABLE DUE TO THE SOAK BACK PUMP (SUPPLIES LUBE OIL TO THE DIESEL SO THAT IT IS READY TO START) TRIP FAILURE. THE CAUSE OF THE FAILURE IS A FAULTY RELAY FOR THE PUMP. THEY WILL REPLACE THIS RELAY. THIS EDG SUPPORTS THE HIGH PRESSURE CORE SPRAY (HPCS) SYSTEM FOR SAFETY FUNCTIONS. THE HPCS SYSTEM HAS NOT BEEN DECLARED INOPERABLE AND THE DIVISION 3 EDG IS STILL FUNCTIONAL. THE PLANT HAS 12 HOURS TO BE IN CONDITION 3 AND 36 HOURS TO BE IN CONDITION 4.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED.
* * * RETRACTED AT 1155 EDT ON 5/17/00 BY CHRIS MILLER TO FANGIE JONES * * *
The licensee is retracting this event notification, after further review, it was determined that this event was not reportable as there was a 72 hour delay before action to shut down the plant became necessary. Offsite power was in service and the other EDG was available and in accordance with Tech Specs the licensee had 72 hours to restore the EDG before further action was necessary The Division 2 EDG was returned to service well within the 72 hours.
The licensee informed the NRC Resident Inspector. The R4DO (Bill Jones) was notified by the NRC Operations Officer.