Event Notification Report for March 12, 2000
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
03/11/2000 - 03/12/2000
EVENT NUMBERS
36789
Power Reactor
Event Number: 36789
Facility: SURRY
Region: 2 State: VA
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: RAWLEIGH DILLARD
HQ OPS Officer: STEVE SANDIN
Region: 2 State: VA
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: RAWLEIGH DILLARD
HQ OPS Officer: STEVE SANDIN
Notification Date: 03/12/2000
Notification Time: 05:41 [ET]
Event Date: 03/12/2000
Event Time: 04:49 [EST]
Last Update Date: 03/12/2000
Notification Time: 05:41 [ET]
Event Date: 03/12/2000
Event Time: 04:49 [EST]
Last Update Date: 03/12/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
EDWARD MCALPINE (R2)
EDWARD MCALPINE (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 96 | Power Operation | 93 | Power Operation |
UNIT 1 COMMENCED A TECH SPEC REQUIRED SHUTDOWN AFTER DECLARING THE REFUELING WATER STORAGE TANK (RWST) INOPERABLE DUE TO THE INABILITY TO CLOSE A MANUALLY OPERATED RWST VALVE.
"At 0230 hours, on 3/12/00, it was noted that a Surry Power Station Unit 1 Refueling Water Storage Tank (RWST) suction valve (1-CS-27) that was being used for purification purposes, could not be closed. The valve had been opened under administrative control, as allowed by procedure. The Unit 1 RWST was declared inoperable, and a 1 hour LCO was entered in accordance with Technical Specifications. The 1 hour LCO expired at 0330 hours on 3/12/00, and a 6 hour LCO to hot shutdown was entered in accordance with Technical Specifications.
"At 0449 hours, Surry Power Station Unit 1 initiated a plant shutdown from 96% power as required by Technical Specifications, in order to meet the 6 hour LCO. The ramp was stopped at 0459 hours at 93% power, after the valve was mechanically closed. An evaluation of the valve is currently being pursued.
"This report is being made pursuant to 10CFR50.72(b)(1)(i)(A), Power Mode Reduction Required by Technical Specifications."
The valve involved is a manual grinnel diaphragm valve which appears to have the spindle threads stripped. Maintenance personnel closed the valve by jacking it shut. This particular valve is used for sampling and purification of the RWST and does not interfere with the main suction path used for ECCS.
The licensee informed the NRC resident inspector.
* * * UPDATE 0945EST ON 3/12/00 FROM DARLENE BROCK TO S.SANDIN * * *
The licensee provided the following information as an update:
"This is an update to Event #36789. At 0551 hours, on 3/12/00, 1-CS-27 was closed using a Jacking device. In addition, 1-CS-31 and 1 -CS-28 (suction isolation valves on the recirculation pumps) were closed. At 0657 hours the Unit 1 Refueling Water Storage Tank was considered operable. The 6 hour LCO to hot shutdown was exited at 0657 hours on 3/12/00 with the Unit stable at 93% power. Surry Power Station Unit 1 was ramped down from 96% power to 93% power during the 6 hour LCO. At 0900 hours, on 3/12/00, a ramp was commenced to return power on Unit 1 to 96%."
The licensee informed the NRC resident inspector. Notified R2DO (McAlpine).
"At 0230 hours, on 3/12/00, it was noted that a Surry Power Station Unit 1 Refueling Water Storage Tank (RWST) suction valve (1-CS-27) that was being used for purification purposes, could not be closed. The valve had been opened under administrative control, as allowed by procedure. The Unit 1 RWST was declared inoperable, and a 1 hour LCO was entered in accordance with Technical Specifications. The 1 hour LCO expired at 0330 hours on 3/12/00, and a 6 hour LCO to hot shutdown was entered in accordance with Technical Specifications.
"At 0449 hours, Surry Power Station Unit 1 initiated a plant shutdown from 96% power as required by Technical Specifications, in order to meet the 6 hour LCO. The ramp was stopped at 0459 hours at 93% power, after the valve was mechanically closed. An evaluation of the valve is currently being pursued.
"This report is being made pursuant to 10CFR50.72(b)(1)(i)(A), Power Mode Reduction Required by Technical Specifications."
The valve involved is a manual grinnel diaphragm valve which appears to have the spindle threads stripped. Maintenance personnel closed the valve by jacking it shut. This particular valve is used for sampling and purification of the RWST and does not interfere with the main suction path used for ECCS.
The licensee informed the NRC resident inspector.
* * * UPDATE 0945EST ON 3/12/00 FROM DARLENE BROCK TO S.SANDIN * * *
The licensee provided the following information as an update:
"This is an update to Event #36789. At 0551 hours, on 3/12/00, 1-CS-27 was closed using a Jacking device. In addition, 1-CS-31 and 1 -CS-28 (suction isolation valves on the recirculation pumps) were closed. At 0657 hours the Unit 1 Refueling Water Storage Tank was considered operable. The 6 hour LCO to hot shutdown was exited at 0657 hours on 3/12/00 with the Unit stable at 93% power. Surry Power Station Unit 1 was ramped down from 96% power to 93% power during the 6 hour LCO. At 0900 hours, on 3/12/00, a ramp was commenced to return power on Unit 1 to 96%."
The licensee informed the NRC resident inspector. Notified R2DO (McAlpine).