Event Notification Report for March 04, 2000
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
03/03/2000 - 03/04/2000
Power Reactor
Event Number: 36756
Facility: FARLEY
Region: 2 State: AL
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: WESS CUMBEE
HQ OPS Officer: LEIGH TROCINE
Region: 2 State: AL
Unit: [1] [] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: WESS CUMBEE
HQ OPS Officer: LEIGH TROCINE
Notification Date: 03/04/2000
Notification Time: 02:37 [ET]
Event Date: 03/04/2000
Event Time: 00:18 [CST]
Last Update Date: 03/04/2000
Notification Time: 02:37 [ET]
Event Date: 03/04/2000
Event Time: 00:18 [CST]
Last Update Date: 03/04/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
LEN WERT (R2)
LEN WERT (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 0 | Startup | 0 | Hot Standby |
UNEXPECTED AUTOMATIC AUXILIARY FEEDWATER PUMP START
While passing through Mode 2 in the process of shutting down Unit 1 to enter refueling outage #16, the last running feedwater pump was secured without defeating the automatic start defeat switch on the balance of plant. This resulted in the automatic start of the 'B' motor-driven auxiliary feedwater pump. The other auxiliary feedwater pump was already running.
The licensee stated that a procedure step was missed and that an occurrence report has been initiated to determine why the procedure step was missed. The licensee also stated that all systems functioned as required and that there was nothing unusual or not understood. The unit is currently in Mode 3 (Hot Standby).
The licensee notified the NRC resident inspector who was at the site observing the unit shutdown.
While passing through Mode 2 in the process of shutting down Unit 1 to enter refueling outage #16, the last running feedwater pump was secured without defeating the automatic start defeat switch on the balance of plant. This resulted in the automatic start of the 'B' motor-driven auxiliary feedwater pump. The other auxiliary feedwater pump was already running.
The licensee stated that a procedure step was missed and that an occurrence report has been initiated to determine why the procedure step was missed. The licensee also stated that all systems functioned as required and that there was nothing unusual or not understood. The unit is currently in Mode 3 (Hot Standby).
The licensee notified the NRC resident inspector who was at the site observing the unit shutdown.
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36757
Facility: FITZPATRICK
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: TERRY BELTZ
HQ OPS Officer: LEIGH TROCINE
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: TERRY BELTZ
HQ OPS Officer: LEIGH TROCINE
Notification Date: 03/04/2000
Notification Time: 11:05 [ET]
Event Date: 03/04/2000
Event Time: 08:45 [EST]
Last Update Date: 04/12/2000
Notification Time: 11:05 [ET]
Event Date: 03/04/2000
Event Time: 08:45 [EST]
Last Update Date: 04/12/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(B) - POT RHR INOP
10 CFR Section:
50.72(b)(2)(iii)(B) - POT RHR INOP
Person (Organization):
JIM TRAPP (R1)
JIM TRAPP (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
DISCOVERY OF A REACTOR CORE ISOLATION COOLING (RCIC) FLOW CONTROL IRREGULARITY DURING THE PERFORMANCE OF SURVEILLANCE TESTING
The following text is a portion of a facsimile received from the licensee:
"A RCIC flow control irregularity was identified during quarterly RCIC surveillance testing. Upon reaching the required flow rate of 400 gpm, RCIC flow dipped to approximately 360 gpm for 1 - 2 minutes before stabilizing at 400 gpm. Engineering is evaluating this condition. In the interim, the RCIC system has been declared inoperable. The plant is in a 7-day [technical specification limiting condition for operation (LCO)]."
The licensee plans to notify the NRC resident inspector.
* * * UPDATE AT 1357 ON 4/12/00, BY ABRAMSKI RECEIVED BY WEAVER * * *
The plant's licensing department has reviewed this event and determined that it is not reportable. The RCIC system is not required by the plant accident analysis. The licensee notified the NRC resident inspector.
The operations center notified the R1DO (Reber).
The following text is a portion of a facsimile received from the licensee:
"A RCIC flow control irregularity was identified during quarterly RCIC surveillance testing. Upon reaching the required flow rate of 400 gpm, RCIC flow dipped to approximately 360 gpm for 1 - 2 minutes before stabilizing at 400 gpm. Engineering is evaluating this condition. In the interim, the RCIC system has been declared inoperable. The plant is in a 7-day [technical specification limiting condition for operation (LCO)]."
The licensee plans to notify the NRC resident inspector.
* * * UPDATE AT 1357 ON 4/12/00, BY ABRAMSKI RECEIVED BY WEAVER * * *
The plant's licensing department has reviewed this event and determined that it is not reportable. The RCIC system is not required by the plant accident analysis. The licensee notified the NRC resident inspector.
The operations center notified the R1DO (Reber).