Skip to main content

Event Notification Report for February 28, 2000

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/27/2000 - 02/28/2000

EVENT NUMBERS
36746367343673636737

Hospital
Event Number: 36746
Rep Org: RESTON HOSPITAL CENTER
Licensee: RESTON HOSPITAL CENTER
Region: 2
City: RESTON   State: VA
County:
License #:
Agreement: N
Docket:
NRC Notified By: DR. FRUMAN
HQ OPS Officer: DOUG WEAVER
Notification Date: 03/01/2000
Notification Time: 14:22 [ET]
Event Date: 02/28/2000
Event Time: 08:00 [EST]
Last Update Date: 03/01/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2201(a)(1)(ii) - LOST/STOLEN LNM>10X
Person (Organization):
LEN WERT (R2)
BRIAN SMITH (NMSS)
Event Text
LOST I-125 SEED

A 0.401 mCi I-125 seed was lost on 2/28/2000, at Reston Hospital Center in Reston, VA. The technician working with the seed believes the seed was lost in the hot lab while preparing the seeds for use. The hot lab was searched but the seed could not be found. The technician frisked herself prior to leaving the hot lab, so the licensee does not believe the seed is outside of the lab.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36734
Facility: HOPE CREEK
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: DAN BOYLE
HQ OPS Officer: BOB STRANSKY
Notification Date: 02/28/2000
Notification Time: 06:34 [ET]
Event Date: 02/28/2000
Event Time: 05:45 [EST]
Last Update Date: 03/07/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS 20.2201(a)(1)(i) - LOST/STOLEN LNM>1000X
Person (Organization):
JOHN WHITE (R1)
ROBERT SKELTON (IAT)
JOHN DAVIDSON (IAT)
WILLIAM BECKNER (NRR)
WILLIAM BRACH (NMSS)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
OVERDUE SHIPMENT OF NEW FUEL

The licensee reported that a shipment of new fuel from ABB was due to arrive onsite at 0530 2/28/00. At the time of the report, the shipment had not yet arrived. The licensee is attempting to contact the shipper. The NRC resident inspector will be informed of this event by the licensee.

* * * UPDATE 0809 2/28/00 FROM PARKER TAKEN BY STRANSKY * * *

The fuel shipment arrived onsite at 0735 2/28/00. The shipper (Roberts Express) believed that the scheduled delivery time was 0700. The licensee plans to investigate the discrepancy in the delivery schedule. The NRC resident inspector will be informed of this update by the licensee. Notified R1DO (White), NRR IAT (Skelton), NMSS IAT (Davidson), NRR EO (Beckner), and NMSS IAT (Brach).

* * * UPDATE 1012EST ON 3/7/00 FROM ERV PARKER TO S.SANDIN * * *

"On 02/28/00, at 0634, Hope Creek made a one hour notification (NRC event #36734). This notification stated 'Hope Creak Generating Station expected a new fuel receipt to arrive on site at approximately 0530 this morning. As of this time the shipment has not arrived. Station personnel are attempting to contact the shipping vendor. Our information indicates that the truck was dispatched at 1040 on Saturday and should have arrived by now.' The shipment subsequently arrived on February 28, 2000, at 0735. This information was provided to the NRC at 0805.
This notification was made in accordance with 10CFR73.71, Reporting Of Safeguards Events, as a lost fuel shipment. The shipment was reported as lost because the Control Room expected the shipment to arrive at 0530, and it did not. The cause of the shipment not arriving at 0530 has been determined to be miscommunication. Due to this miscommunication, the trucking company believed that the shipment was expected at 0800. While conducting the investigation, plant staff determined that the truck was continually being tracked via satellite and the dispatcher was aware of its location at all times. Therefore, the fuel truck was not lost and this event is not reportable in accordance with 10CFR73.71. As a result, the notification is being retracted."

The licensee will inform the NRC resident inspector. Notified R1DO(Cranston).


Power Reactor
Event Number: 36736
Facility: CLINTON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: MIKE BENSEN
HQ OPS Officer: DOUG WEAVER
Notification Date: 02/28/2000
Notification Time: 18:24 [ET]
Event Date: 02/28/2000
Event Time: 14:15 [CST]
Last Update Date: 03/02/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
MIKE JORDAN (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
HIGH PRESSURE CORE SPRAY INOPERABLE

High Pressure Core Spray was declared INOPERABLE following an overvoltage condition on the Division Three AC Power Distribution System.

During performance of CPS 9080.02 Division Three Diesel Generator Operability Surveillance, the Division Three Diesel Generator was synchronized with the AC bus. Following synchronization, bus voltage went to
approximately 4360V, which is above the limit of 4300V. The high voltage condition remained for approximately
3 1/2 minutes, until the Diesel Generator output breaker was opened and voltages returned to less than 4300V.

The Division Three AC Power Distribution System was declared INOPERABLE due to being above 4300V pending an Engineering evaluation of the overvoltage condition. CPS Improved Technical Specification 3.8.9, Action E.1 requires High Pressure Core Spray to be declared INOPERABLE with the Division Three AC Power Distribution System INOPERABLE.

The Division Three Diesel Generator was also declared INOPERABLE.

The cause of the overvoltage is not known and is being investigated at this time.

NRC Resident Inspector C. Brown was notified.


* * * UPDATE ON 3/2/00 @ 1441 BY FUNCKHOUSER TO GOULD * * *

All portions of the Division Three AC Distribution System were initially declared INOPERABLE. The Division Three AC Distribution System has had an Engineering Evaluation performed and restored to an OPERABLE status. At this time the High Pressure Core Spray (HPCS) System was restored to an OPERABLE status. The Division Three Diesel Generator is being worked to restore it to an OPERABLE status, subsequent to the abnormal conditions experienced during the Division 3 Diesel Generator run on Monday, February 28, 2000.

The plants Technical Specifications Limited Condition for Operation (LCO) section 3.8.1, AC Sources Operating, does not require the Division 3 AC electrical power sources to be OPERABLE when the HPCS System is inoperable and it allows the use of the HPCS LCO in lieu of the Division 3 Diesel Generator. Thus, the High Pressure Core Spray (HPCS) System has been declared INOPERABLE at approximately 1000 on March 2, 2000 in lieu of the Division 3 AC Source (Division 3 DG). This is allowed by the LCO 3.8.1 Bases, Applicability section. The HPCS System LCO is covered in Technical Specifications section 3.5.1.

At 1000 on 3/2/00 the plant exited LCO 3.8.1 and entered LCO 3.5.1.

The NRC Resident Inspector was informed.

The Reg 3 RDO(Jordan) was notified.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36737
Facility: MILLSTONE
Region: 1     State: CT
Unit: [] [2] []
RX Type: [1] GE-3,[2] CE,[3] W-4-LP
NRC Notified By: STEVEN BAKER
HQ OPS Officer: DOUG WEAVER
Notification Date: 02/28/2000
Notification Time: 23:29 [ET]
Event Date: 02/28/2000
Event Time: 23:09 [EST]
Last Update Date: 03/31/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
JIM TRAPP (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 97 Power Operation
Event Text
TECH SPEC REQUIRED SHUTDOWN - BACKLEAKAGE FROM THE S/G TO THE AUXILIARY FEEDWATER SYSTEM.

Check valve leakage from the # 1 Steam Generator caused a rise in temperature in the discharge piping of the "A" auxiliary feedwater pump. The maximum allowed temperature is 190 degrees F. The maximum temperature reached was 300 degrees F. The licensee entered Tech Spec 3.0.3 at 1209 and started slowly lowering power. Injection with the "A" AFW pump reduced the temperature in the line below the limit. The licensee is waiting to determine if the check valve has reseated.

The licensee notified the NRC resident inspector, the town of Waterford and the state of Connecticut.

* * * UPDATE 0026 2/29/2000 FROM JOHN CLAIR TAKEN BY BOB STRANSKY * * *

TS 3.0.3 was exited at 2338 2/28/2000. The unit is returning to rated power. The NRC resident inspector will be informed of this update by the licensee. Notified R1DO (Trapp).

* * * RETRACTION 0833 3/31/2000 FROM KENNETH TRUSDALE TAKEN BY STRANSKY * * *

"This call is to retract a call made on 2/28/2000 under 10 CFR 50.72 regarding entry into Tech Spec Action Statement 3.0.3, as the plant was in a condition prohibited by the Tech Specs. The original notification was made because the Shift Manager had indication that the auxiliary feedwater piping temperature was above normal, and he did not have enough information or guidance at that time to determine that the auxiliary feedwater system was operable. As operability was indeterminate, the Shift Manager conservatively assumed the auxiliary feedwater system was inoperable, which is a condition prohibited by the plant Technical Specifications. Subsequent research and investigation determined that the auxiliary feedwater system was operable throughout the event and the plant was not in a condition prohibited by the Technical Specifications.

"As the plant was not in a condition prohibited by the Technical Specifications, there was no requirement to enter Action Statement 3.0.3. The notification made on 2/28/2000 is withdrawn."

The NRC resident inspector has been informed of this retraction by the licensee. Notified R1DO (Evans).