Event Notification Report for October 31, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/30/1999 - 10/31/1999
Power Reactor
Event Number: 36377
Facility: LASALLE
Region: 3 State: IL
Unit: [1] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: SHANE MARIK
HQ OPS Officer: DOUG WEAVER
Region: 3 State: IL
Unit: [1] [2] []
RX Type: [1] GE-5,[2] GE-5
NRC Notified By: SHANE MARIK
HQ OPS Officer: DOUG WEAVER
Notification Date: 10/31/1999
Notification Time: 14:00 [ET]
Event Date: 10/31/1999
Event Time: 12:03 [CST]
Last Update Date: 10/31/1999
Notification Time: 14:00 [ET]
Event Date: 10/31/1999
Event Time: 12:03 [CST]
Last Update Date: 10/31/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(v) - OTHER ASMT/COMM INOP
10 CFR Section:
50.72(b)(1)(v) - OTHER ASMT/COMM INOP
Person (Organization):
MIKE JORDAN (R3)
MIKE JORDAN (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
Station Vent Stack Monitoring Inoperable.
The Station Vent Stack Wide Range Gaseous Monitor is deenergized for planned maintenance. At 1203 the Pre-planned alternate Particulate Iodine and Noble Gas (PING) was found to have its sample pump tripped. Initial attempts to restart the sample pump were unsuccessful. Instrument Maintenance Department repairs are in progress. Chemistry personnel are preparing alternate sampling capability.
The licensee will notify the NRC resident inspector.
* * * UPDATE AT 1705 ON 10/31/99 BY COVEYOU TAKEN BY WEAVER * * *
Repairs have been made to the pre-planned alternate (PING) and functional testing has been completed as of 1527 CST. The PING was declared operable at that time. Normal sampling of the Station Vent Stack has been resumed via this alternate method. The NRC resident inspector will be informed. The HOO notified the R3DO (Jordan).
The Station Vent Stack Wide Range Gaseous Monitor is deenergized for planned maintenance. At 1203 the Pre-planned alternate Particulate Iodine and Noble Gas (PING) was found to have its sample pump tripped. Initial attempts to restart the sample pump were unsuccessful. Instrument Maintenance Department repairs are in progress. Chemistry personnel are preparing alternate sampling capability.
The licensee will notify the NRC resident inspector.
* * * UPDATE AT 1705 ON 10/31/99 BY COVEYOU TAKEN BY WEAVER * * *
Repairs have been made to the pre-planned alternate (PING) and functional testing has been completed as of 1527 CST. The PING was declared operable at that time. Normal sampling of the Station Vent Stack has been resumed via this alternate method. The NRC resident inspector will be informed. The HOO notified the R3DO (Jordan).
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36378
Facility: SURRY
Region: 2 State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: BILL WEBSTER
HQ OPS Officer: DOUG WEAVER
Region: 2 State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: BILL WEBSTER
HQ OPS Officer: DOUG WEAVER
Notification Date: 10/31/1999
Notification Time: 22:14 [ET]
Event Date: 10/31/1999
Event Time: 20:24 [EST]
Last Update Date: 11/16/1999
Notification Time: 22:14 [ET]
Event Date: 10/31/1999
Event Time: 20:24 [EST]
Last Update Date: 11/16/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION 50.72(b)(2)(iii)(A) - POT UNABLE TO SAFE SD
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION 50.72(b)(2)(iii)(A) - POT UNABLE TO SAFE SD
Person (Organization):
MARK LESSER (R2)
MARK LESSER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
TWO DIESEL GENERATORS INOPERABLE DURING TESTING
During performance of the monthly testing of the #3 Emergency Diesel Generator (EDG), the voltage regulator (control power) would not adjust incoming voltage lower than 120 volts. The diesel was declared inoperable pending further troubleshooting of the voltage regulator.
As required by Surry technical specifications, the #1 and #2 EDGs were scheduled for operability testing on a daily basis. The #1 EDG was inoperable from 2024 hours to 2203 hours for required testing which rendered inoperable both EDGs for Unit 1. The #1 EDG was available at all times during testing; however, it would have required operator action to load on the bus.
This report is being made pursuant 10CFR50.72(b)(2)(iii)(A) and (D) for a condition that alone could have prevented the fulfillment of safety structures or systems needed to shut down the reactor and maintain it in a safe condition and mitigate the consequences of an accident.
The licensee plans to notify the NRC resident inspector.
********** UPDATE AT 1051 ON 11/16/99 FROM JOHN ROSENBERGER TO LEIGH TROCINE **********
The following text is a portion of a facsimile received from the licensee:
"Based on further review of this event and the guidance provided in NUREG-1022, it was determined that this event was not reportable since the redundant EDG for each unit was removed from service to fulfill surveillance testing in accordance with technical specifications and approved procedures." Therefore, the licensee is retracting this event notification.
The licensee notified the NRC resident inspector. The NRC operations officer notified the R2DO (Ogle).
During performance of the monthly testing of the #3 Emergency Diesel Generator (EDG), the voltage regulator (control power) would not adjust incoming voltage lower than 120 volts. The diesel was declared inoperable pending further troubleshooting of the voltage regulator.
As required by Surry technical specifications, the #1 and #2 EDGs were scheduled for operability testing on a daily basis. The #1 EDG was inoperable from 2024 hours to 2203 hours for required testing which rendered inoperable both EDGs for Unit 1. The #1 EDG was available at all times during testing; however, it would have required operator action to load on the bus.
This report is being made pursuant 10CFR50.72(b)(2)(iii)(A) and (D) for a condition that alone could have prevented the fulfillment of safety structures or systems needed to shut down the reactor and maintain it in a safe condition and mitigate the consequences of an accident.
The licensee plans to notify the NRC resident inspector.
********** UPDATE AT 1051 ON 11/16/99 FROM JOHN ROSENBERGER TO LEIGH TROCINE **********
The following text is a portion of a facsimile received from the licensee:
"Based on further review of this event and the guidance provided in NUREG-1022, it was determined that this event was not reportable since the redundant EDG for each unit was removed from service to fulfill surveillance testing in accordance with technical specifications and approved procedures." Therefore, the licensee is retracting this event notification.
The licensee notified the NRC resident inspector. The NRC operations officer notified the R2DO (Ogle).
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36379
Facility: COOK
Region: 3 State: MI
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: MUTZ
HQ OPS Officer: CHAUNCEY GOULD
Region: 3 State: MI
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: MUTZ
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 11/01/1999
Notification Time: 01:50 [ET]
Event Date: 10/31/1999
Event Time: 20:30 [EST]
Last Update Date: 11/08/1999
Notification Time: 01:50 [ET]
Event Date: 10/31/1999
Event Time: 20:30 [EST]
Last Update Date: 11/08/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
MIKE JORDAN (R3)
MIKE JORDAN (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
SAFEGUARDS DEGRADATION RELATED TO MONITORING A CONTROL ACCESS
COMPENSATORY MEASURES TAKEN.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED.
SEE HOO LOG FOR ADDITIONAL INFORMATION.
* * * UPDATE AT 1515 ON 11/8/99 BY DEPUYDT TAKEN BY WEAVER * * *
Further evaluation of this event concluded that the guidance of Generic Letter 91-03, Reporting of Safeguards Events , Enclosure 1, was applicable. Specifically, Enclosure 1 states that a failed compensatory measure that fails after being successfully established as an effective compensatory measure for a degraded security system is a loggable event.
Therefore, in keeping with the Guidance of GL 91-03, Event #36379 is retracted as an event that must be reported within 1 hour under 10 CFR 73.71, and will be instead recorded as a loggable event.
The licensee informed the NRC resident inspector. The Operations Center notified the R3DO (Parker).
COMPENSATORY MEASURES TAKEN.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED.
SEE HOO LOG FOR ADDITIONAL INFORMATION.
* * * UPDATE AT 1515 ON 11/8/99 BY DEPUYDT TAKEN BY WEAVER * * *
Further evaluation of this event concluded that the guidance of Generic Letter 91-03, Reporting of Safeguards Events , Enclosure 1, was applicable. Specifically, Enclosure 1 states that a failed compensatory measure that fails after being successfully established as an effective compensatory measure for a degraded security system is a loggable event.
Therefore, in keeping with the Guidance of GL 91-03, Event #36379 is retracted as an event that must be reported within 1 hour under 10 CFR 73.71, and will be instead recorded as a loggable event.
The licensee informed the NRC resident inspector. The Operations Center notified the R3DO (Parker).