Event Notification Report for October 23, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/22/1999 - 10/23/1999
Power Reactor
Event Number: 36338
Facility: FT CALHOUN
Region: 4 State: NE
Unit: [1] [] []
RX Type: [1] CE
NRC Notified By: KEVIN BOSTON
HQ OPS Officer: DICK JOLLIFFE
Region: 4 State: NE
Unit: [1] [] []
RX Type: [1] CE
NRC Notified By: KEVIN BOSTON
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 10/23/1999
Notification Time: 20:59 [ET]
Event Date: 10/23/1999
Event Time: 16:45 [CDT]
Last Update Date: 11/11/1999
Notification Time: 20:59 [ET]
Event Date: 10/23/1999
Event Time: 16:45 [CDT]
Last Update Date: 11/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - DEG/UNANALYZED COND
10 CFR Section:
50.72(b)(2)(i) - DEG/UNANALYZED COND
Person (Organization):
LINDA SMITH (R4)
LINDA SMITH (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
- Steam Generator #RC-2B is in Tech Spec Category C-3 -
In accordance with Tech Spec Section 3.17(5), Reporting Requirements, the following 4-hour non-emergency report is being made:
During eddy current testing of tubes of Steam Generator (SG) #RC-2B, greater than 1% of the tubes tested were found to be defective. The number of tested tubes during the 1999 refueling outage is 4905 in SG #RC-2B. The number of tubes considered defective and require plugging exceeded 49 tubes.
SG #RC-2B was declared in Tech Spec 3.17, Table 3-13, Category C-3, at 1645 CDT on 10/23/99. Tube testing is being conducted under procedure SE-ST-RC-0003, Inservice Testing of Steam Generator Tubes.
The licensee notified the NRC Resident Inspector.
Note: Refer to related Event #36331.
* * * RETRACTION AT 0923 ON 11/09/99 FROM MATZKE TAKEN BY STRANSKY * * *
"Both steam generators were declared in Category C-3 per Technical Specification 3.17 due to having greater than 1% of the inspected tubes being found defective. In steam generator RC-2A, 63 tubes were found defective out of 4901 inspected tubes. In steam generator RC-2B, 57 tubes were found defective out of 4905 inspected tubes.
"The technical specifications contain provisions for plugging tubes when they are found to contain defects that penetrate greater than 40% through-wall. Under this technical specification, it is expected that the plant may operate for a period of time with defects greater than 40% through-wall prior to being found and plugged. The tubes that were found to contain defects were plugged in accordance with technical specifications. The plugging criteria currently in use at Fort Calhoun Station requires that all indications of corrosion detected by eddy current are plugged on detection due to the absence of a qualified technique for sizing indications.
"Following eddy current testing of the steam generator tubes, in-situ pressure testing was performed on certain defects which exceeded the screening criteria. The criteria is based on the potential to exceed the performance criteria for leakage or structural integrity. The leakage performance criterion requires that leakage from all defects within a steam generator shall not exceed 1 gallon per minute under worst case accident differential pressure and the structural integrity performance criterion states that the tubes shall withstand pressure of up to three times normal operating differential pressure without burst. Selected indications which are representative of the worst of the population of indications found in the steam generators successfully passed in-situ pressure tests with no leakage at worst case accident differential pressure and no leakage at three times normal operating differential pressure. There was no detectable primary-to-secondary leakage during operation prior to shutdown for the current refueling outage. Therefore, the steam generators were both available to perform their required safety functions as verified through in-situ pressure testing. Based on the testing performed, the tubes are not considered to have been seriously degraded, the plant was not in an unanalyzed condition, the steam generators would have performed their design basis functions during accident conditions, and this did not constitute a condition outside the plant's operating and emergency procedures.
"The original reports were made conservatively awaiting the completion of the inspection and testing program. The reports are now being retracted based on the complete testing results. The Fort Calhoun Station Technical Specification 30-day plugging report and 6-month inspection report will be submitted as required."
The licensee notified the NRC Resident Inspector. The NRC Operations Officer notified R4DO (Linda Smith).
* * * UPDATE AT 1605 ON 11/11/99 BY MATZKE TO GOULD * * * UNRETRACT A RETRACTION
As a result of discussions with NRC personnel on 11/10/99 regarding reporting requirements, OPPD is withdrawing the retraction notification of 11/09/99, and changing the basis of the original notification to "voluntary". This is because the reporting requirements of 10CFR50.72 were determined to be not applicable, and thus it is not clear that reporting pursuant to the technical specifications is required. However, due to NRC desire for formal, prompt notification of this type of event and the absence of explicit regulatory guidance, reporting on a voluntary basis appears appropriate.
The 30 day steam generator tube plugging report to the NRC pursuant to Technical Specification 3.17(5)(i) has been sent. The six month steam generator inspection report pursuant to Technical Specification 3.17(5)(ii) will be sent as required and will include the information requested in the second sentence of Technical Specification 3.1 7(5)(iii).
The licensee notified the NRC Resident Inspector. The NRC Operations Officer notified R4DO (Linda Smith).
In accordance with Tech Spec Section 3.17(5), Reporting Requirements, the following 4-hour non-emergency report is being made:
During eddy current testing of tubes of Steam Generator (SG) #RC-2B, greater than 1% of the tubes tested were found to be defective. The number of tested tubes during the 1999 refueling outage is 4905 in SG #RC-2B. The number of tubes considered defective and require plugging exceeded 49 tubes.
SG #RC-2B was declared in Tech Spec 3.17, Table 3-13, Category C-3, at 1645 CDT on 10/23/99. Tube testing is being conducted under procedure SE-ST-RC-0003, Inservice Testing of Steam Generator Tubes.
The licensee notified the NRC Resident Inspector.
Note: Refer to related Event #36331.
* * * RETRACTION AT 0923 ON 11/09/99 FROM MATZKE TAKEN BY STRANSKY * * *
"Both steam generators were declared in Category C-3 per Technical Specification 3.17 due to having greater than 1% of the inspected tubes being found defective. In steam generator RC-2A, 63 tubes were found defective out of 4901 inspected tubes. In steam generator RC-2B, 57 tubes were found defective out of 4905 inspected tubes.
"The technical specifications contain provisions for plugging tubes when they are found to contain defects that penetrate greater than 40% through-wall. Under this technical specification, it is expected that the plant may operate for a period of time with defects greater than 40% through-wall prior to being found and plugged. The tubes that were found to contain defects were plugged in accordance with technical specifications. The plugging criteria currently in use at Fort Calhoun Station requires that all indications of corrosion detected by eddy current are plugged on detection due to the absence of a qualified technique for sizing indications.
"Following eddy current testing of the steam generator tubes, in-situ pressure testing was performed on certain defects which exceeded the screening criteria. The criteria is based on the potential to exceed the performance criteria for leakage or structural integrity. The leakage performance criterion requires that leakage from all defects within a steam generator shall not exceed 1 gallon per minute under worst case accident differential pressure and the structural integrity performance criterion states that the tubes shall withstand pressure of up to three times normal operating differential pressure without burst. Selected indications which are representative of the worst of the population of indications found in the steam generators successfully passed in-situ pressure tests with no leakage at worst case accident differential pressure and no leakage at three times normal operating differential pressure. There was no detectable primary-to-secondary leakage during operation prior to shutdown for the current refueling outage. Therefore, the steam generators were both available to perform their required safety functions as verified through in-situ pressure testing. Based on the testing performed, the tubes are not considered to have been seriously degraded, the plant was not in an unanalyzed condition, the steam generators would have performed their design basis functions during accident conditions, and this did not constitute a condition outside the plant's operating and emergency procedures.
"The original reports were made conservatively awaiting the completion of the inspection and testing program. The reports are now being retracted based on the complete testing results. The Fort Calhoun Station Technical Specification 30-day plugging report and 6-month inspection report will be submitted as required."
The licensee notified the NRC Resident Inspector. The NRC Operations Officer notified R4DO (Linda Smith).
* * * UPDATE AT 1605 ON 11/11/99 BY MATZKE TO GOULD * * * UNRETRACT A RETRACTION
As a result of discussions with NRC personnel on 11/10/99 regarding reporting requirements, OPPD is withdrawing the retraction notification of 11/09/99, and changing the basis of the original notification to "voluntary". This is because the reporting requirements of 10CFR50.72 were determined to be not applicable, and thus it is not clear that reporting pursuant to the technical specifications is required. However, due to NRC desire for formal, prompt notification of this type of event and the absence of explicit regulatory guidance, reporting on a voluntary basis appears appropriate.
The 30 day steam generator tube plugging report to the NRC pursuant to Technical Specification 3.17(5)(i) has been sent. The six month steam generator inspection report pursuant to Technical Specification 3.17(5)(ii) will be sent as required and will include the information requested in the second sentence of Technical Specification 3.1 7(5)(iii).
The licensee notified the NRC Resident Inspector. The NRC Operations Officer notified R4DO (Linda Smith).
Power Reactor
Event Number: 36341
Facility: OYSTER CREEK
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-2
NRC Notified By: MALCOLM BROWNE
HQ OPS Officer: STEVE SANDIN
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-2
NRC Notified By: MALCOLM BROWNE
HQ OPS Officer: STEVE SANDIN
Notification Date: 10/25/1999
Notification Time: 09:39 [ET]
Event Date: 10/23/1999
Event Time: 02:00 [EDT]
Last Update Date: 10/25/1999
Notification Time: 09:39 [ET]
Event Date: 10/23/1999
Event Time: 02:00 [EDT]
Last Update Date: 10/25/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
WILLIAM COOK (R1)
WILLIAM COOK (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
OFFSITE NOTIFICATION TO THE NATIONAL MARINE FISHERIES SERVICE AND THE NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION (NJ DEP).
AN IMMATURE GREEN SEA TURTLE WAS FOUND DEAD AT APPROXIMATELY 0200EDT ON 10/23/99 IN UNIT'S DILUTION WATER STRUCTURE. THE LICENSEE WILL NOTIFY THE NJ DEP AND MARINE FISHERIES SERVICE AND WILL INFORM THE NRC RESIDENT INSPECTOR.
AN IMMATURE GREEN SEA TURTLE WAS FOUND DEAD AT APPROXIMATELY 0200EDT ON 10/23/99 IN UNIT'S DILUTION WATER STRUCTURE. THE LICENSEE WILL NOTIFY THE NJ DEP AND MARINE FISHERIES SERVICE AND WILL INFORM THE NRC RESIDENT INSPECTOR.