Event Notification Report for October 16, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
10/15/1999 - 10/16/1999
EVENT NUMBERS
36298362993630036301
Power Reactor
Event Number: 36298
Facility: SAN ONOFRE
Region: 4 State: CA
Unit: [] [2] [3]
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: NEIL SCHEUERLEIN
HQ OPS Officer: FANGIE JONES
Region: 4 State: CA
Unit: [] [2] [3]
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: NEIL SCHEUERLEIN
HQ OPS Officer: FANGIE JONES
Notification Date: 10/16/1999
Notification Time: 06:08 [ET]
Event Date: 10/16/1999
Event Time: 02:53 [PDT]
Last Update Date: 10/16/1999
Notification Time: 06:08 [ET]
Event Date: 10/16/1999
Event Time: 02:53 [PDT]
Last Update Date: 10/16/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
GAIL GOOD (R4)
WILLIAM BATEMAN (NRR)
FRANK CONGEL (IRO)
CARR (FEMA)
WILLIAM BRACH (NMSS)
GAIL GOOD (R4)
WILLIAM BATEMAN (NRR)
FRANK CONGEL (IRO)
CARR (FEMA)
WILLIAM BRACH (NMSS)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNUSUAL EVENT DECLARED DUE TO EARTHQUAKE LOCATED ABOUT 100 MILES FROM SITE. (Refer to event #36299 for a related event at Palo Verde.)
An earthquake of magnitude 7.0 occurred at 0247 PDT at coordinates 34 degrees 35.73 minutes north, 116 degrees 16.09 minutes west. This location is about 32 miles north of Joshua Tree, California, and 47 miles east-southeast of Barstow, California. This information is from the U.S. Geological Survey Southern California Seismic Network.
The licensee felt the earthquake, which was followed by the seismic alarms actuating. The plants are in operation with no problems. Inspections were carried out per procedures as well as the declaration of the Unusual Event at 0253 PDT. The licensee expects to be out of the Unusual Event in less than 1 hour.
The licensee notified the NRC Resident Inspector and state/local authorities.
* * * UPDATE AT 0635 EDT ON 10/16/99 FROM NEIL SCHEUERLEIN TO FANGIE JONES * * *
The licensee exited the Unusual Event at 0330 PDT on 10/16/99.
The licensee notified the NRC Resident Inspector and state/local authorities. The NRC operations officer notified R4DO (Gail Good), NRR EO (William Bateman), IRO (Frank Congel), and FEMA (Carr).
An earthquake of magnitude 7.0 occurred at 0247 PDT at coordinates 34 degrees 35.73 minutes north, 116 degrees 16.09 minutes west. This location is about 32 miles north of Joshua Tree, California, and 47 miles east-southeast of Barstow, California. This information is from the U.S. Geological Survey Southern California Seismic Network.
The licensee felt the earthquake, which was followed by the seismic alarms actuating. The plants are in operation with no problems. Inspections were carried out per procedures as well as the declaration of the Unusual Event at 0253 PDT. The licensee expects to be out of the Unusual Event in less than 1 hour.
The licensee notified the NRC Resident Inspector and state/local authorities.
* * * UPDATE AT 0635 EDT ON 10/16/99 FROM NEIL SCHEUERLEIN TO FANGIE JONES * * *
The licensee exited the Unusual Event at 0330 PDT on 10/16/99.
The licensee notified the NRC Resident Inspector and state/local authorities. The NRC operations officer notified R4DO (Gail Good), NRR EO (William Bateman), IRO (Frank Congel), and FEMA (Carr).
Power Reactor
Event Number: 36299
Facility: PALO VERDE
Region: 4 State: AZ
Unit: [1] [2] [3]
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: JIM BLAZICK
HQ OPS Officer: FANGIE JONES
Region: 4 State: AZ
Unit: [1] [2] [3]
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: JIM BLAZICK
HQ OPS Officer: FANGIE JONES
Notification Date: 10/16/1999
Notification Time: 06:55 [ET]
Event Date: 10/16/1999
Event Time: 03:05 [MST]
Last Update Date: 10/18/1999
Notification Time: 06:55 [ET]
Event Date: 10/16/1999
Event Time: 03:05 [MST]
Last Update Date: 10/18/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED 50.72(b)(2)(vi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED 50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
GAIL GOOD (R4)
WILLIAM BATEMAN (NRR)
FRANK CONGEL (IRO)
RICHE (FEMA)
WILLIAM BRACH (NMSS)
GAIL GOOD (R4)
WILLIAM BATEMAN (NRR)
FRANK CONGEL (IRO)
RICHE (FEMA)
WILLIAM BRACH (NMSS)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNUSUAL EVENT DECLARED DUE TO EARTHQUAKE FELT ON SITE. (Refer to event #36298 for a related event at San Onofre.)
An earthquake of magnitude 7.0 occurred at 0247 MST at coordinates 34 degrees 35.73 minutes north, 116 degrees 16.09 minutes west. This location is about 32 miles north of Joshua Tree, California, and 47 miles east-southeast of Barstow, California. This information is from the U.S. Geological Survey Southern California Seismic Network.
The licensee felt the earthquake, and the strong motion accelerometer alarmed. An approximate intensity level of 0.015g's has been determined. Unit 1 is defueled, and Units 2 and 3 are in operation with no problems. Inspections were carried out per procedures as well as the declaration of the Unusual Event. Engineering walkdowns and evaluations are in progress per procedure.
The Unusual Event was entered and exited at 0305 MST.
The licensee notified the NRC Resident Inspector as well and state/local authorities.
***************** UPDATE AT 0100 EDT ON 10/18/99 FROM DANN DAILEY TO LEIGH TROCINE *****************
The following text is a portion of a facsimile received from the licensee:
"This is a followup of the ENS notification at 0353 MST on 10/16/99. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, another followup notification will be made via the ENS or under the reporting requirements of 10CFR50.73."
"On [10/16/99], at approximately 0247 MST, an earthquake, referred to as the 'Hector Earthquake,' of approximate magnitude 7.0 occurred, its epicenter located about 32 miles north of Joshua Tree, California. Joshua Tree, California is located approximately 220 miles west of the Palo Verde Nuclear Generating Station. At approximately 0248 MST, the vibratory ground motion reached and actuated the Palo Verde Seismic Monitoring Instrumentation switches. Specifically, the strong motion accelerometer trigger located in the Unit 1 containment building tendon gallery exceeded the threshold value of 0.01g. The vibratory ground motion also was felt by personnel in all three Palo Verde control rooms. Operations personnel immediately retrieved data from the actuated instrument and performed analysis to determine the magnitude of the vibratory ground motion. Initial analysis of the Seismic Monitoring Instrumentation tape recordings completed at approximately 0305 MST indicated a seismic event of about 0.015g. This is well below the magnitude of the 0.10g spectra Operating Basis Earthquake (OBE) and the 0.20g spectra Safe Shutdown Earthquake (SSE). Based on the validation of the earthquake per the Emergency Action Level 6.6 Technical Bases, the Unit 1 Shift Manager declared (and immediately exited due to the event being over) a Notification of an Unusual Event (NUE) applicable to all three units due to a seismic event."
"The NRC was notified at 0353 MST on 10/16/99 via the Emergency Notification System (ENS). The criteria for the ENS notification were 10CFR50.72(a)(1)(i) due to the declaration of an Emergency Class and 10CFR50.72(b)(1)(iii) due to the natural phenomenon that poses an actual threat to the safety of the nuclear power plant. Further analysis of the seismic data concluded the measured motions of structures and components were less than 14% of the OBE and should have no effect upon facility features important to safety. Based on the low magnitude of the vibratory ground motion and satisfactory plant walkdowns, an actual threat to safety did not exist. The ENS notification per 10CFR50.72(b)(1)(iii) is hereby retracted. The initial notification stated a press release was expected to be made; therefore, 10CFR50.72(b)(2)(vi) also applied. No media interest existed; therefore, no press release was made. The ENS notification per 10CFR50.72(a)(1)(i) remains valid."
"Following declaration of the NUE, the Maricopa County Sheriff's Office and the Arizona Department of Public Safety were notified at approximately 0313 MST via the Notification and Alert Network (NAN). The Palo Verde Emergency Coordinator recommended that no protective actions be taken. No protective actions were implemented by state or county agencies."
"Operations personnel performed an immediate walkdown of plant equipment. No abnormalities caused by the seismic event were observed. There were no structures, systems, or components that were inoperable that contributed to this event. There were no failures that rendered a train of a safety system inoperable, and no failures of components with multiple functions were involved. No engineered safety feature (ESF) actuations occurred, and none were required. The event did not result in any challenges to the fission product barrier or result in any releases of radioactive materials. The event did not adversely affect the safe operation of the plant or health and safety of the public."
The licensee notified the NRC resident inspector. The NRC operations officer notified the R4DO (Good), NRR EO (Bateman), and IRO (Congel).
An earthquake of magnitude 7.0 occurred at 0247 MST at coordinates 34 degrees 35.73 minutes north, 116 degrees 16.09 minutes west. This location is about 32 miles north of Joshua Tree, California, and 47 miles east-southeast of Barstow, California. This information is from the U.S. Geological Survey Southern California Seismic Network.
The licensee felt the earthquake, and the strong motion accelerometer alarmed. An approximate intensity level of 0.015g's has been determined. Unit 1 is defueled, and Units 2 and 3 are in operation with no problems. Inspections were carried out per procedures as well as the declaration of the Unusual Event. Engineering walkdowns and evaluations are in progress per procedure.
The Unusual Event was entered and exited at 0305 MST.
The licensee notified the NRC Resident Inspector as well and state/local authorities.
***************** UPDATE AT 0100 EDT ON 10/18/99 FROM DANN DAILEY TO LEIGH TROCINE *****************
The following text is a portion of a facsimile received from the licensee:
"This is a followup of the ENS notification at 0353 MST on 10/16/99. If through subsequent reviews of this event, additional information is identified that is pertinent to this event or alters the information being provided at this time, another followup notification will be made via the ENS or under the reporting requirements of 10CFR50.73."
"On [10/16/99], at approximately 0247 MST, an earthquake, referred to as the 'Hector Earthquake,' of approximate magnitude 7.0 occurred, its epicenter located about 32 miles north of Joshua Tree, California. Joshua Tree, California is located approximately 220 miles west of the Palo Verde Nuclear Generating Station. At approximately 0248 MST, the vibratory ground motion reached and actuated the Palo Verde Seismic Monitoring Instrumentation switches. Specifically, the strong motion accelerometer trigger located in the Unit 1 containment building tendon gallery exceeded the threshold value of 0.01g. The vibratory ground motion also was felt by personnel in all three Palo Verde control rooms. Operations personnel immediately retrieved data from the actuated instrument and performed analysis to determine the magnitude of the vibratory ground motion. Initial analysis of the Seismic Monitoring Instrumentation tape recordings completed at approximately 0305 MST indicated a seismic event of about 0.015g. This is well below the magnitude of the 0.10g spectra Operating Basis Earthquake (OBE) and the 0.20g spectra Safe Shutdown Earthquake (SSE). Based on the validation of the earthquake per the Emergency Action Level 6.6 Technical Bases, the Unit 1 Shift Manager declared (and immediately exited due to the event being over) a Notification of an Unusual Event (NUE) applicable to all three units due to a seismic event."
"The NRC was notified at 0353 MST on 10/16/99 via the Emergency Notification System (ENS). The criteria for the ENS notification were 10CFR50.72(a)(1)(i) due to the declaration of an Emergency Class and 10CFR50.72(b)(1)(iii) due to the natural phenomenon that poses an actual threat to the safety of the nuclear power plant. Further analysis of the seismic data concluded the measured motions of structures and components were less than 14% of the OBE and should have no effect upon facility features important to safety. Based on the low magnitude of the vibratory ground motion and satisfactory plant walkdowns, an actual threat to safety did not exist. The ENS notification per 10CFR50.72(b)(1)(iii) is hereby retracted. The initial notification stated a press release was expected to be made; therefore, 10CFR50.72(b)(2)(vi) also applied. No media interest existed; therefore, no press release was made. The ENS notification per 10CFR50.72(a)(1)(i) remains valid."
"Following declaration of the NUE, the Maricopa County Sheriff's Office and the Arizona Department of Public Safety were notified at approximately 0313 MST via the Notification and Alert Network (NAN). The Palo Verde Emergency Coordinator recommended that no protective actions be taken. No protective actions were implemented by state or county agencies."
"Operations personnel performed an immediate walkdown of plant equipment. No abnormalities caused by the seismic event were observed. There were no structures, systems, or components that were inoperable that contributed to this event. There were no failures that rendered a train of a safety system inoperable, and no failures of components with multiple functions were involved. No engineered safety feature (ESF) actuations occurred, and none were required. The event did not result in any challenges to the fission product barrier or result in any releases of radioactive materials. The event did not adversely affect the safe operation of the plant or health and safety of the public."
The licensee notified the NRC resident inspector. The NRC operations officer notified the R4DO (Good), NRR EO (Bateman), and IRO (Congel).
Power Reactor
Event Number: 36300
Facility: BRUNSWICK
Region: 2 State: NC
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: JOEL GORDON
HQ OPS Officer: JOHN MacKINNON
Region: 2 State: NC
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: JOEL GORDON
HQ OPS Officer: JOHN MacKINNON
Notification Date: 10/16/1999
Notification Time: 12:06 [ET]
Event Date: 10/16/1999
Event Time: 11:35 [EDT]
Last Update Date: 10/17/1999
Notification Time: 12:06 [ET]
Event Date: 10/16/1999
Event Time: 11:35 [EDT]
Last Update Date: 10/17/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
CAUDLE JULIAN (R2)
WILLIAM BATEMAN (NRR)
DEPUY (FEMA)
FRANK CONGEL (IRO)
CAUDLE JULIAN (R2)
WILLIAM BATEMAN (NRR)
DEPUY (FEMA)
FRANK CONGEL (IRO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNUSUAL EVENT DECLARED DUE TO THE NATIONAL WEATHER SERVICE ISSUING A HURRICANE WARNING FOR THEIR AREA. (Refer to event #36302 for a related event.)
THE LICENSEE ENTERED EMERGENCY PLAN IMPLEMENTING PROCEDURE 2.6.21 (ADVERSE WEATHER, ETC.) AND ABNORMAL OPERATING PROCEDURE 13 (ADVERSE WEATHER, ETC.) AFTER THE NATIONAL WEATHER SERVICE ISSUED A HURRICANE WARNING FOR THEIR AREA. HURRICANE IRENE IS AT LEAST 20 HOURS FROM THEIR LOCATION. ALL THEIR EMERGENCY CORE COOLING SYSTEMS AND EMERGENCY DIESEL GENERATORS ARE FULLY OPERABLE IF NEEDED, AND THEIR ELECTRICAL GRID IS STABLE.
CURRENTLY, WIND DIRECTION IS FROM 043 DEGREES, WIND SPEED IS 10.7 mph, THE STABILITY CLASS IS 'D,' AND THERE IS NO PRECIPITATION. BOTH UNITS HAVE TO BE IN HOT SHUTDOWN 2 HOURS PRIOR TO HURRICANE FORCE WINDS REACH THE SITE.
THE LICENSEE HAS NOTIFIED THE UNITED STATES COAST GUARD, STATE OF NORTH CAROLINA, AND LOCAL SURROUNDING COUNTIES OF THEIR EMERGENCY DECLARATION.
THE NRC RESIDENT INSPECTOR WILL BE NOTIFIED OF THIS EVENT BY THE LICENSEE.
* * * UPDATE AT 2328 EDT ON 10/17/99 BY JUDITH DANIEL TO FANGIE JONES * * *
The Unusual Event was terminated at 2313 EDT. The plant is stable and suffered no damage due to the hurricane.
The licensee notified the NRC Resident Inspector. The NRC operations center notified the R2DO (Caudle Julian), NRR EO (William Bateman), and FEMA (Bagwell).
THE LICENSEE ENTERED EMERGENCY PLAN IMPLEMENTING PROCEDURE 2.6.21 (ADVERSE WEATHER, ETC.) AND ABNORMAL OPERATING PROCEDURE 13 (ADVERSE WEATHER, ETC.) AFTER THE NATIONAL WEATHER SERVICE ISSUED A HURRICANE WARNING FOR THEIR AREA. HURRICANE IRENE IS AT LEAST 20 HOURS FROM THEIR LOCATION. ALL THEIR EMERGENCY CORE COOLING SYSTEMS AND EMERGENCY DIESEL GENERATORS ARE FULLY OPERABLE IF NEEDED, AND THEIR ELECTRICAL GRID IS STABLE.
CURRENTLY, WIND DIRECTION IS FROM 043 DEGREES, WIND SPEED IS 10.7 mph, THE STABILITY CLASS IS 'D,' AND THERE IS NO PRECIPITATION. BOTH UNITS HAVE TO BE IN HOT SHUTDOWN 2 HOURS PRIOR TO HURRICANE FORCE WINDS REACH THE SITE.
THE LICENSEE HAS NOTIFIED THE UNITED STATES COAST GUARD, STATE OF NORTH CAROLINA, AND LOCAL SURROUNDING COUNTIES OF THEIR EMERGENCY DECLARATION.
THE NRC RESIDENT INSPECTOR WILL BE NOTIFIED OF THIS EVENT BY THE LICENSEE.
* * * UPDATE AT 2328 EDT ON 10/17/99 BY JUDITH DANIEL TO FANGIE JONES * * *
The Unusual Event was terminated at 2313 EDT. The plant is stable and suffered no damage due to the hurricane.
The licensee notified the NRC Resident Inspector. The NRC operations center notified the R2DO (Caudle Julian), NRR EO (William Bateman), and FEMA (Bagwell).
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36301
Facility: COMANCHE PEAK
Region: 4 State: TX
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: B HUBBARD
HQ OPS Officer: JOHN MacKINNON
Region: 4 State: TX
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: B HUBBARD
HQ OPS Officer: JOHN MacKINNON
Notification Date: 10/16/1999
Notification Time: 18:06 [ET]
Event Date: 10/16/1999
Event Time: 14:28 [CDT]
Last Update Date: 10/22/1999
Notification Time: 18:06 [ET]
Event Date: 10/16/1999
Event Time: 14:28 [CDT]
Last Update Date: 10/22/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
GAIL GOOD (R4)
GAIL GOOD (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
DURING TESTING OF THE TRAIN "B" (1EA2) 6.9kV BUS, THE ALTERNATE POWER SUPPLY BREAKER FAILED TO CLOSE AND THE BUS WAS LOCKED OUT.
The loss of voltage due to the lockout of the 1EA2 6.9kV bus caused a loss of power to the containment particulate iodine gaseous (PIG) monitor which actuated a CVI (containment ventilation isolation). The containment ventilation was already isolated, so no valves repositioned. The blackout sequencer also received an undervoltage actuation. This caused several operator lockouts including a turbine-driven auxiliary feedwater start signal, which was out of service, and a trip of one of the two operating spent fuel pool cooling pumps. The second spent fuel pool cooling pump was returned to service about 40 minutes after it had initially lost power. Spent fuel pool temperature increased from approximately 104 degrees F to about 106 degrees F during the time period that the second spent fuel pool cooling pump was de-energized. About 0.25% of the fuel has been reloaded back into Comanche Peak Unit 1's core.
The sequencer was de-energized to prevent any unnecessary actuations. The train "B," 1EA2, 6.9kV bus was re-energized from the normal offsite source, and the spent fuel pool cooling pump was restarted. The residual heat removal system was energized from the train "A," 1EA1, 6.9kV bus, and its operation was not interrupted by the loss of train the "B," 1EA2, 6.9kV bus. The train "B," 1EA2, 6.9kV bus emergency diesel generator is tagged out of service for maintenance.
The cause of the bus lockout is under investigation.
The NRC Resident Inspector was notified of this event by the licensee.
* * * UPDATE AT 1205 ON 10/22/99 BY DAVE HUBBARD TO JOLLIFFE * * *
On 10/16/99. Unit 1 was in Mode 6 with fuel movement in progress. While performing the surveillance test for the 6.9 kV bus #1EA2, breaker #1EA2-2 failed to close or tripped when operated from the control room. Breaker #1EA2-1 opened as designed during the transfer and does not have an automatic re-closure feature. Since the EDG was tagged OOS the bus remained de-energized. SFP cooling pump #X-02 and the RMUW pump were stripped by the blackout sequencer operator lockout. The ESF actuation was reported as event #36301.
Further review of the event by engineering and regulatory affairs, using NUREG 1022, concluded that this was a single component actuation of the undervoltage relay. However, to complete an ESF function, other components need to be actuated such as the EDG, AFW pumps, CCW pumps, etc. The SFP cooling pump and the RMUW pumps are not ESF components. The actuation of the relay did not result in the start of any ESF components and, therefore is not a valid ESF actuation. In addition, the sequencer is not required to be operable in Mode 6. The CVI actuation, by itself, would not be reportable as a valid ESF actuation
Based on the above the licensee is retracting this ESF notification.
The licensee plans to notify the NRC Resident Inspector.
The NRC Operations Officer notified the R4DO Linda Smith.
The loss of voltage due to the lockout of the 1EA2 6.9kV bus caused a loss of power to the containment particulate iodine gaseous (PIG) monitor which actuated a CVI (containment ventilation isolation). The containment ventilation was already isolated, so no valves repositioned. The blackout sequencer also received an undervoltage actuation. This caused several operator lockouts including a turbine-driven auxiliary feedwater start signal, which was out of service, and a trip of one of the two operating spent fuel pool cooling pumps. The second spent fuel pool cooling pump was returned to service about 40 minutes after it had initially lost power. Spent fuel pool temperature increased from approximately 104 degrees F to about 106 degrees F during the time period that the second spent fuel pool cooling pump was de-energized. About 0.25% of the fuel has been reloaded back into Comanche Peak Unit 1's core.
The sequencer was de-energized to prevent any unnecessary actuations. The train "B," 1EA2, 6.9kV bus was re-energized from the normal offsite source, and the spent fuel pool cooling pump was restarted. The residual heat removal system was energized from the train "A," 1EA1, 6.9kV bus, and its operation was not interrupted by the loss of train the "B," 1EA2, 6.9kV bus. The train "B," 1EA2, 6.9kV bus emergency diesel generator is tagged out of service for maintenance.
The cause of the bus lockout is under investigation.
The NRC Resident Inspector was notified of this event by the licensee.
* * * UPDATE AT 1205 ON 10/22/99 BY DAVE HUBBARD TO JOLLIFFE * * *
On 10/16/99. Unit 1 was in Mode 6 with fuel movement in progress. While performing the surveillance test for the 6.9 kV bus #1EA2, breaker #1EA2-2 failed to close or tripped when operated from the control room. Breaker #1EA2-1 opened as designed during the transfer and does not have an automatic re-closure feature. Since the EDG was tagged OOS the bus remained de-energized. SFP cooling pump #X-02 and the RMUW pump were stripped by the blackout sequencer operator lockout. The ESF actuation was reported as event #36301.
Further review of the event by engineering and regulatory affairs, using NUREG 1022, concluded that this was a single component actuation of the undervoltage relay. However, to complete an ESF function, other components need to be actuated such as the EDG, AFW pumps, CCW pumps, etc. The SFP cooling pump and the RMUW pumps are not ESF components. The actuation of the relay did not result in the start of any ESF components and, therefore is not a valid ESF actuation. In addition, the sequencer is not required to be operable in Mode 6. The CVI actuation, by itself, would not be reportable as a valid ESF actuation
Based on the above the licensee is retracting this ESF notification.
The licensee plans to notify the NRC Resident Inspector.
The NRC Operations Officer notified the R4DO Linda Smith.