Event Number: 36196
Facility: PILGRIM
Region: 1     State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: HAISLET
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 09/18/1999
Notification Time: 10:53 [ET]
Event Date: 09/18/1999
Event Time: 08:45 [EDT]
Last Update Date: 09/18/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
NIEL DELLA GRECA (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 1 Startup 1 Startup
Event Text
THE PLANT HAD A PRIMARY CONTAINMENT SYSTEM ISOLATION (PCIS) ACTUATION.

WHILE LINING UP THE REACTOR CORE ISOLATION COOLING STEAM SYSTEM FOR STANDBY, THEY RECEIVED A GROUP 5 PCIS ISOLATION. THE ISOLATION WENT TO COMPLETION SUCCESSFULLY. THE CAUSE OF THE ISOLATION IS BEING INVESTIGATED. THE ISOLATION SIGNAL WAS RESET BY 0848 EDT, AND THE STEAM VALVES WERE RESTORED BACK TO NORMAL.

THE NRC RESIDENT INSPECTOR WAS NOTIFIED BY THE LICENSEE.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36197
Facility: POINT BEACH
Region: 3     State: WI
Unit: [1] [] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: JOHN SELL
HQ OPS Officer: LEIGH TROCINE
Notification Date: 09/18/1999
Notification Time: 13:29 [ET]
Event Date: 09/18/1999
Event Time: 01:00 [CDT]
Last Update Date: 09/20/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
GARY SHEAR (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
RESPONSE TO NRC BULLETIN 80-24 REGARDING LEAKAGE OF SERVICE WATER INTO REACTOR CONTAINMENTS (24-HOUR REPORT)

The following text is a portion of a facsimile received from the licensee:

"At 0100 [CDT] on 09/18/99, a pin hole leak was identified on the 'A' Unit 1 containment fan cooler. The unit had been in a 72-hour [limiting condition for operation (LCO)] for partial blockage of this cooler by zebra mussels. The leak was discovered during treatment for the zebra mussels. The LCO expires at 1035 [CDT] on 09/19/99. The plan is presently to isolate the leaking tube section and restore the cooler as operable but degraded."

There was nothing unusual or not understood and all systems functioned as required. The licensee stated that there are four containment fan coolers per unit. The licensee also stated the NRC Bulletin 80-24 has been superceded but that they are still committed to the provisions of this bulletin.

The licensee notified the NRC resident inspector.

* * * UPDATE AT 1345 ON 09/20/99 FROM JOHN SELL TAKEN BY JOLLIFFE * * *

Upon further review of this event, the licensee determined that only leakage greater than 1 GPM should be reportable to the NRC and that reporting this event to the NRC was a conservative action. The 1 GPM value is consistent with Point Beach Tech Spec requirements for evaluation of RCS leakage. The pinhole leak did not meet this criteria. Thus, the licensee desires to retract this event. The 72 hour LCO for the 'A' Unit 1 containment fan cooler was exited at 2140 CDT on 09/18/99. The fan cooler remains operable but degraded.

The licensee informed the NRC Resident Inspector. The NRC Operations Officer notified the R3DO Roger Lanksbury.


Power Reactor
Event Number: 36237
Facility: PILGRIM
Region: 1     State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: GORDON FIEDLER
HQ OPS Officer: LEIGH TROCINE
Notification Date: 09/28/1999
Notification Time: 17:43 [ET]
Event Date: 09/18/1999
Event Time: 08:48 [EDT]
Last Update Date: 09/28/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
DAVID SILK (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 0 Startup 100 Power Operation
Event Text
FAILURE TO PERFORM RCIC AND HPCI RESET PRIOR TO EXCEEDING 150 PSI DURING UNIT STARTUP

On 09/18/99 while the unit was in startup, reactor core isolation cooling (RCIC) and high pressure coolant injection (HPCI) reset was not performed prior to exceeding 150 psi. The reset was performed at 167 psi at 0848, and 150 psi was exceeded at 0830. Therefore, both RCIC and HPCI were inoperable for 18 minutes.

The licensee stated that this issue was determined to be reportable at about 1730 on 09/28/99 during performance of a reportability evaluation in accordance with 10 CFR 50.73. The unit is currently operating at 100% power (steady state).

The licensee plans to notify the NRC resident inspector and the state (Massachusetts Civil Defense).