Skip to main content

Event Notification Report for September 15, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
09/14/1999 - 09/15/1999

EVENT NUMBERS
361643616536166361673616836175

Power Reactor
Event Number: 36164
Facility: BRUNSWICK
Region: 2     State: NC
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: DAVID JENKINS
HQ OPS Officer: WILLIAM POERTNER
Notification Date: 09/15/1999
Notification Time: 11:31 [ET]
Event Date: 09/15/1999
Event Time: 09:35 [EDT]
Last Update Date: 09/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
CHRIS CHRISTENSEN (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 60 Power Operation 60 Power Operation
2 N Y 60 Power Operation 60 Power Operation
Event Text
OFFSITE NOTIFICATION DUE TO OPENING STORM DRAIN BYPASS VALVES

On September 15, 1999, at 0935 EDT, the bypass valves from the site's storm drain basin directly to the circulating water discharge canal were opened to prevent site flooding (which could cause significant damage to plant equipment and/or possibly endanger personnel safety) due to the impending arrival of hurricane Floyd. Past experience has shown that the installed pump capacity will not keep up with the rain expected during a hurricane. The valves were opened prior to hurricane force winds reaching the site to avoid exposing personnel to the hurricane. Opening these valves is a reportable event (to the state of North Carolina) in accordance with the site National Pollutant Discharge Elimination System permit.

The NRC resident has been notified.


Hospital
Event Number: 36165
Rep Org: WILLIAM BEAUMONT HOSPITAL
Licensee: WILLIAM BEAUMONT HOSPITAL
Region: 3
City: ROYAL OAK   State: MI
County:
License #: 21-01333-01
Agreement: N
Docket:
NRC Notified By: CHERYL SCHULTZ
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/15/1999
Notification Time: 14:59 [ET]
Event Date: 09/15/1999
Event Time: 11:00 [EDT]
Last Update Date: 09/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
35.33 - MED MISADMINISTRATION
Person (Organization):
GARY SHEAR (R3)
JOSIE PICCONE (NMSS)
Event Text
PATIENT RECEIVED A PLACEBO INSTEAD OF 20 GRAY OF P-32.

A patient signed a consent form to participate in a coronary brachytherapy trial to evaluate the Guidant Coronary Afterloader. The patient was randomized to receive 20 Gray to the proximal left anterior descending coronary artery with P-32, but the Radiation Oncology physicist programmed the afterloader to use the placebo source wire instead. Therefore, the patient did not receive the prescribed dose of 20 Gray. The root cause for the error was that the Radiation Oncologist did not adequately confirm the written directive prior to treatment. There was no documentation on the randomization order to guide the physicist in selecting the proper treatment, so he relied on his memory, which failed.


Power Reactor
Event Number: 36166
Facility: INDIAN POINT
Region: 1     State: NY
Unit: [2] [] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: PHIL SANTINI
HQ OPS Officer: BOB STRANSKY
Notification Date: 09/15/1999
Notification Time: 16:06 [ET]
Event Date: 09/15/1999
Event Time: 15:36 [EDT]
Last Update Date: 09/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(iii) - EXTERNAL THREAT
Person (Organization):
NIEL DELLA GRECA (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Hot Shutdown 0 Hot Shutdown
Event Text
HURRICANE WINDS PREDICTED TO COME WITHIN 500 NM OF SITE

At 1536, the licensee was notified that the National Weather Service had issued hurricane warnings for North Carolina and Virginia, with hurricane force winds extending 140 miles outward from the center of Hurricane Floyd. The licensee considers that the arrival of hurricane force winds within 500 nautical miles (NM) of Indian Point, concurrent with hurricane warnings is imminent. This notification is being made in accordance with Technical Specification 3.14.a and Abnormal Operating Instruction 28.07. The NRC resident inspector will be informed of this notification by the licensee.


Power Reactor
Event Number: 36167
Facility: SURRY
Region: 2     State: VA
Unit: [1] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: DON KARNS
HQ OPS Officer: BOB STRANSKY
Notification Date: 09/15/1999
Notification Time: 22:17 [ET]
Event Date: 09/15/1999
Event Time: 22:00 [EDT]
Last Update Date: 09/16/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
CHRIS CHRISTENSEN (R2)
ANN BOLAND (R2)
WILLIAM BECKNER (NRR)
FRANK CONGEL (IRO)
BELCHER (FEMA)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 83 Power Operation
2 N Y 100 Power Operation 47 Power Operation
Event Text
UNUSUAL EVENT DECLARED DUE TO APPROACHING HURRICANE

An Unusual Event was declared at 2200 EDT on 09/15/99 due to the expected onset of hurricane force winds within the following 12 hours. The licensee currently expects that hurricane force winds will occur onsite at 1000 EDT. Both units are currently being shut down in anticipation of the hurricane arrival. Shutdown of Unit 2 commenced at 1906 EDT, and Unit 1 began shutting down at 2040 EDT.

The NRC resident inspector has been informed of this notification.

* * * UPDATE 0210 EDT ON 09/16/99 FROM DALE JONES TO S. SANDIN * * *

The licensee is holding power at 46% on Unit 1 and 35% on Unit 2 pending an assessment of the path of Hurricane Floyd. Current projections for maximum sustained wind on site indicate less than 60 mph due to the more easterly course change.

The NRC operations officer notified the R2DO (Christensen) and R2 IRC (Boland).

*** UPDATE 1234 EDT ON 09/16/99 FROM STANLEY TO POERTNER ***

Hurricane Floyd past to the east. Maximum sustained winds onsite were 35 mph. Both units are holding at 45% power pending an assessment of Hurricane Floyd's status. Power was lost to the primary and backup met towers; however, data is available from the corporate offices.

The NRC resident inspector has been notified. The NRC operation officer notified the R2 IRC (Reyes), R2DO (Christensen), NRR EO (Beckner), and IRO (Congel).

*** UPDATE 1423 EDT ON 09/16/99 FROM STANLEY TO TROCINE ***

The licensee terminated the Unusual Event at 1420 EDT on 09/16/99. Both units are operating at approximately 45% power, and the licensee stated that all equipment is operating normally (with following exceptions). The 469 line was lost and remains out of service. This line feeds the independent spent fuel storage installation (ISFSI); however, the ISFSI diesel is currently running. The primary and secondary meteorological panels/towers were also lost. Wind speeds are currently 10 to 15 mph.

The licensee is in the process of notifying state and local officials and plans to notify the NRC resident inspector. The NRC operations officer notified the R2DO (Christensen), R2 IRC (Skinner), IRO (Congel), NRR EO (Beckner), and FEMA (Rische).


Power Reactor
Event Number: 36168
Facility: BROWNS FERRY
Region: 2     State: AL
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: JOSEPH BENNETT
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/15/1999
Notification Time: 22:55 [ET]
Event Date: 09/15/1999
Event Time: 18:25 [CDT]
Last Update Date: 09/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION 50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
CHRIS CHRISTENSEN (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 52 Power Operation 0 Hot Shutdown
Event Text
REACTOR MANUALLY SCRAMMED FROM 52% REACTOR POWER DUE TO AN UNCONTROLLABLE LOSS OF ELECTROHYDRAULIC CONTROL (EHC) FLUID.


At approximately 1750 on 09/15/99, failure of an EHC system pressure sensing line resulted in an uncontrollable loss of EHC fluid. Attempts to maintain EHC reservoir level failed, and a 1825 hours, the reactor was manually scrammed from 52% reactor power in preparation for removing the EHC system from service. Reactor power was initially at 100% and it was reduced to 52% before the reactor was manually scrammed. The scram resulted in a low reactor vessel water level, causing an automatic isolation of Primary Containment Isolation System (PCIS) groups 2 (Drywell isolations), 3 (Reactor Water Cleanup trip/isolation), &8 (transversing incore probe system isolation). EOI-1 was entered due to low reactor vessel water level {decreased to negative 28.5", Top of Active Fuel (TAF) is negative 162"} and to control reactor pressure with the loss of the EHC system. No Main Steam Safety Relief Valves (MSRVs) were actuated during this event. All control rods fully inserted into the core.

The licensee started that restart is projected for 1600 hours on 09/16/99.

NRC Region 2 Section Chief (Paul Fredrickson) was notified of this event by the licensee.


Hospital
Event Number: 36175
Rep Org: HOLY REDEEMER HOSPITAL
Licensee: HOLY REDEEMER HOSPITAL
Region: 1
City: MEADOWBROOK   State: PA
County: MONTGOMERY
License #: 37-05089-01
Agreement: N
Docket:
NRC Notified By: PAT MAYNES
HQ OPS Officer: LEIGH TROCINE
Notification Date: 09/16/1999
Notification Time: 14:15 [ET]
Event Date: 09/15/1999
Event Time: 15:00 [EDT]
Last Update Date: 09/16/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
35.33 - MED MISADMINISTRATION
Person (Organization):
NIEL DELLA GRECA (R1)
JOSIE PICCONE (NMSS)
Event Text
MEDICAL MISADMINISTRATION INVOLVING THE WRONG PHARMACEUTICAL AND THE WRONG DOSE AT HOLY REDEEMER HOSPITAL IN MEADOWBROOK, PENNSYLVANIA

The Scheduling Department works independent from the Nuclear Medicine Department, and the individual who took the appointment scheduled the patient to have a I-131 total neck and body scan. This procedure involves the standard use of 5 mCi of I-131. The patient came in the next day and had no note. The patient was sent over to the referring physician, and the note was written in a very ambiguous manner. All it said was, "see patient to evaluate for I-131 treatment." The technologist who performed the procedure thought that an ablation was going to be ordered because it was a total neck and body scan, and the technologist administered the 5-mCi capsule on 09/14/99.

When the patient returned for a study on the afternoon of 09/15/99 (the following day), the patient brought along a referral. The referral said, "evaluate the patient for I-131 treatment for hyperthyroidism" which indicated that the patient should have had an I-123 uptake and scan involving about 300 µCi of I-123. This problem was identified at approximately 1500 on 09/15/99. The licensee stated that the paperwork was very ambiguous, the procedure was ordered incorrectly, and the technologist failed to fill out a quality management form.

The licensee has the ability to scan the patient and give the doctor the patient's uptake on the I-131. Even though the wrong pharmaceutical and the wrong dose were administered, it is currently believed that the patient may need to receive additional I-131 therapy to slow the thyroid.

The licensee notified the NRC Region 1 office (Shanbaky). The licensee also plans to notify the referring physician and the patient.

(Call the NRC operations officer for a licensee contact telephone number.)