Power Reactor
Event Number: 36151
Facility: SAINT LUCIE
Region: 2     State: FL
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: CALVIN WARD
HQ OPS Officer: FANGIE JONES
Notification Date: 09/13/1999
Notification Time: 11:26 [ET]
Event Date: 09/13/1999
Event Time: 08:30 [EDT]
Last Update Date: 09/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
ROBERT HAAG (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Hot Standby 0 Hot Standby
2 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION DUE TO PUMPING SETTLING PONDS IN PREPARATION FOR HURRICANE

The licensee pumped the settling ponds to the plant discharge canal in preparation for hurricane Floyd. No discharge limits were exceeded, but the Florida Department of Environmental Protection was notified as required by Saint Lucie's National Pollution Discharge Elimination System Permit.

The licensee notified the NRC Resident Inspector as well as the state agency.


Hospital
Event Number: 36152
Rep Org: OAKLAND GENERAL HOSPITAL
Licensee: OAKLAND GENERAL HOSPITAL
Region: 3
City: Madison Heights   State: MI
County:
License #: 21-11494-01
Agreement: N
Docket:
NRC Notified By: TOM MARSH
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 14:10 [ET]
Event Date: 09/13/1999
Event Time: 12:00 [EDT]
Last Update Date: 09/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
MONTY PHILLIPS (R3)
DON COOL (NMSS)
Event Text
SURFACE CONTAMINATION OF DELIVERED PACKAGE EXCEEDED LIMITS.


Syncor delivered a package containing one 15 mCi iodine-131 capsule to Oakland General Hospital, Madison Heights, MI, at approximately 1200 ET. Radiation surveys of the package were within limits, but a wipe of the package reading was 3000 dpm (limit is 2200 dpm). The licensee used a well counter and determined that the surface contamination was from technetium-99m The licensee contacted Syncor and informed them of the hot package. The licensee said that the package will be left in the hot lab and they will either decontaminate the package or will let the Tc-99m surface contamination decay to acceptable limits by itself. The licensee said that nobody at their hospital were contaminated by the package and that they will survey the area where the Syncor delivery man passed through.

NRC Region 3 (Bob Gattone) was notified of this event by the licensee.


Power Reactor
Event Number: 36153
Facility: FERMI
Region: 3     State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: STEVE MAREK
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 14:50 [ET]
Event Date: 09/13/1999
Event Time: 12:00 [EDT]
Last Update Date: 09/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
GARY SHEAR (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 85 Power Operation 85 Power Operation
Event Text
HPCI DECLARED INOPERABLE DURING SURVEILLANCE TESTING.

During performance of a calibration/functional surveillance test of the HPCI equipment room temperature instrumentation, the trip unit being tested failed upscale. A step in the surveillance procedure places a keylock switch in the TEST position, preventing a HPCI system Channel A isolation and HPCI Turbine Trip. The Trip unit was declared inoperable.

The licensee's Technical Specification require that the inoperable instrument channel be restored to Operable status in 6 hours or the Action to close the affected system isolation valves within 1 hour and declare the affected system inoperable.

On September 13, 1999 at 1411 EDT hours, the affected HPCI isolation valves were isolated and the HPCI system was declared inoperable. All Emergency Core Cooling Systems, Emergency Diesel Generators, and RCIC are fully operable if needed.

Efforts to replace the failed trip unit are in progress.

The NRC Resident Inspector was notified of this event by the Licensee.


Power Reactor
Event Number: 36155
Facility: TURKEY POINT
Region: 2     State: FL
Unit: [3] [4] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: MATUSZEWSKI
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 17:08 [ET]
Event Date: 09/13/1999
Event Time: 16:50 [EDT]
Last Update Date: 09/14/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
ROBERT HAAG (R2)
JOSEPH GIITTER (IRO)
KEN CIBOCH (FEMA)
FRANK CONGEL (IRO)
ELINOR ADENSAM (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 N Y 100 Power Operation 100 Power Operation
4 N Y 100 Power Operation 100 Power Operation
Event Text
UNUSUAL EVENT DECLARED DUE TO ENTERING EAL 12A (NATURAL PHENOMENON - HURRICANE WARNING CONFIRMED).

The licensee entered an Unusual Event per Emergency Action Level 12A. All emergency diesel generators are fully operable and the electrical grid is stable. All emergency core cooling systems are fully operable except for CCW heat exchanger "3B". Heat Exchanger "3B" will be restored to service soon. The state of Florida and surrounding counties have been informed of the Unusual Event classification.

The NRC Resident Inspector will be informed by the licensee.

* * * UPDATE 0930 9/14/1999 BY STRANSKY * * *

The NRC entered the Monitoring Phase of Normal Mode at 0930 on 9/14/1999 in preparation of potential landfall by Hurricane Floyd.

* * * COMMISSIONER'S ASSISTANTS BRIEF, 1000 EDT ON 9/14/99 * * *

Luis Reyes the R2RA conducted the brief, IRO (Frank Congel), NRR (Tad Marsh), NMSS (Josie Piccone), PA (William Beecher), SP (Fred Combs), R2 IRC (Pierce Skinner), CA (Betsy Keeling), EDO Staff (Leonard Wert), IP (Karen Henderson), SECY (Andrew Bates), Chairman Dicus Off (Thomas Hiltz), Comm. McGaffigan Off (James Beall), Comm. Diaz Off (Anthony Hsia), Comm. Merrifield Off (Lynne Stauss)


***UPDATE 1744 9/14/99 BY D. MORRIS TAKEN BY MACKINNON***

Unusual Event was terminated and EAL 12A was exited at 1710 ET when the hurricane warning was downgraded to a tropical storm warning by the National Hurricane Center. The Licensee notified the state and surrounding counties of exiting the unusual event. R2DO (Chris Christensen), NRR EO (Bill Beckner) and FEMA (Ken Ciboch) notified.

The NRC Resident Inspector was notified of this event update by the licensee.


Power Reactor
Event Number: 36156
Facility: SAINT LUCIE
Region: 2     State: FL
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: STEVE MERRILL
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 17:30 [ET]
Event Date: 09/13/1999
Event Time: 17:13 [EDT]
Last Update Date: 09/15/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
ROBERT HAAG (R2)
JOSEPH GIITTER (IRO)
DAN SULLIVAN (FEMA)
FRANK CONGEL (IRO)
ELINOR ADENSAM (NRR)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Hot Shutdown 0 Hot Shutdown
2 N Y 100 Power Operation 100 Power Operation
Event Text
UNUSUAL EVENT DECLARED DUE TO ENTERING EAL 5B ITEM 1 (CONFIRMED HURRICANE WARNING IN EFFECT)

The licensee entered an Unusual Event per Emergency Action Level 5B item 1. All emergency diesel generators are fully operable and the electrical grid is stable. All emergency core cooling systems are fully operable. The state was notified of the Unusual Event classification. Local counties will be notified of the Unusual Event classification by the state of Florida.

The NRC Resident Inspector will be notified of this event by the licensee.

* * * UPDATE 0930 9/14/1999 BY STRANSKY * * *

The NRC entered the Monitoring Phase of Normal Mode at 0930 on 9/14/1999 in preparation of potential landfall by Hurricane Floyd.

* * * COMMISSIONER'S ASSISTANTS BRIEF, 1000 EDT ON 9/14/99 * * *

Luis Reyes the R2RA conducted the brief, IRO (Frank Congel), NRR (Tad Marsh), NMSS (Josie Piccone), PA (William Beecher), SP (Fred Combs), R2 IRC (Pierce Skinner), CA (Betsy Keeling), EDO Staff (Leonard Wert), IP (Karen Henderson), SECY (Andrew Bates), Chairman Dicus Off (Thomas Hiltz), Comm. McGaffigan Off (James Beall), Comm. Diaz Off (Anthony Hsia), Comm. Merrifield Off (Lynne Stauss)

*** COMMISSIONER'S ASSISTANCE BRIEF, 2000 EDT ON 9/14/99 ***

Luis Reyes the R2RA conducted the brief, EDO (Jim Dyer), IRO ( Joe Giitter), NRR EO (Bill Beckner), NMSS (Josie Piccone), CA (Betsy Keeling), Chairman Dicus Off (Tom Hiltz), Comm McGaffigan (James Beall), Comm Merrifield (Lynne Stauss & John Thoma), NRC R2 (Bruce Mallett & Anne Boland) .

* * * UPDATE AT 0059 EDT ON 9/15/99 BY JACK BREEN TO FANGIE JONES * * *

Unusual Event was terminated at 0040 EDT when the hurricane warning was lifted by the National Hurricane Center. The licensee notified the NRC Resident Inspector and intends notifying the state and surrounding counties of exiting the Unusual Event. R2DO (Chris Christensen), NRR EO (William Beckner), and FEMA (Wayne Storer) notified.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36157
Facility: HATCH
Region: 2     State: GA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: BARNES
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 18:20 [ET]
Event Date: 09/13/1999
Event Time: 16:30 [EDT]
Last Update Date: 09/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
ROBERT HAAG (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 98 Power Operation 98 Power Operation
Event Text
OFFSITE NOTIFICATION MADE TO THE STATE OF GEORGIA ENVIRONMENTAL PROTECTION DIVISION

At approximately 1630 hours a notification was made to the State of Georgia Environmental Protection Division regarding the exceedance of the instantaneous and two hour release rate for residual chlorine from the site during plant service water chlorination. An investigation is in progress to determine the cause.

The NRC Resident Inspector was notified of this event by the licensee.


***Retraction on 09/14/99 at 1535 EDT by Barnes taken by MacKinnon***

On review of NUREG-1022 section 3.7 the licensee is retracting this event because the amount of chlorine released was small. R2DO (Chris Christensen) notified.

The NRC Resident Inspector will be notified of this retraction.


Power Reactor
Event Number: 36158
Facility: INDIAN POINT
Region: 1     State: NY
Unit: [2] [] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: MIKE VASELY
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 18:59 [ET]
Event Date: 09/13/1999
Event Time: 18:05 [EDT]
Last Update Date: 09/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
NIEL DELLA GRECA (R1)
ELINOR ADENSAM (NRR)
JOSEPH GIITTER (IRO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Hot Shutdown 0 Hot Shutdown
Event Text
UNUSUAL EVENT CLASSIFICATION SHOULD HAVE BEEN DECLARED FOR INDIAN POINT T UNIT 2 REACTOR TRIP WITH A LOSS OF OFFSITE POWER EVENT # 36104 WHICH OCCURRED ON 08/31/99.

The following is a 1 hour notification pursuit to 10 CFR 50.72 (a).

During post event review for the 08/31/99 reactor trip and subsequent loss of offsite power, it has been determined that the plant met the conditions of the notification of an unusual event at approximately 1446 hours, because the existing undervoltage conditions on bus 6A would have prevented the licensee from restoring offsite power within 15 minutes. Although offsite power was available, the licensee did not have the ability to energize the 480V Buses from this source within the emergency action level action time. All buses except 6A were energized by emergency diesel generators. This report implements the guidance provided for a missed report as described in NUREG 1022 Rev. 1.

Emergency Planning Department personnel are notifying State and Local Authorities.

The NRC Resident Inspector was notified of this event.

See Indian Point Unit 2 event # 36104 for event description.


Power Reactor
Event Number: 36159
Facility: PILGRIM
Region: 1     State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: BRIAN SULLIVAN
HQ OPS Officer: JOHN MacKINNON
Notification Date: 09/13/1999
Notification Time: 20:11 [ET]
Event Date: 09/13/1999
Event Time: 18:24 [EDT]
Last Update Date: 09/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - RPS ACTUATION
Person (Organization):
NIEL DELLA GRECA (R1)
ELINOR ADENSAM (NRR)
JOSEPH GIITTER (IRO)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 50 Power Operation 0 Hot Shutdown
Event Text
MANUAL REACTOR SCRAM ON A LOSS OF CONDENSER VACUUM FROM 34% REACTOR POWER.

The licensee was initially holding reactor power at 50% for preparation of performing backwash of the main condensers. A work order had been opened up earlier to perform work on the augmented offgas system. While holding reactor power at 50%, the licensee began to lose condenser vacuum. Condenser vacuum was initially at 28". The licensee entered Abnormal Operating Procedure 2.4.36 (Loss of Condenser Vacuum). Reactor power was manually decreased to reduce the heat load on the main condenser in order to decrease the rate at which main condenser vacuum was decreasing. At 24" of condenser vacuum, the reactor was manually scrammed (at 22" of vacuum, an automatic turbine trip/reactor scram would have occurred). All control rods inserted; however, the licensee lost rod position indication for eight control rods following the scram. This loss of control rod position indication has occurred before.

Due to the loss of rod position indication, the licensee entered Emergency Operating Procedure 2 (Failure to Scram). The licensee remained in EOP-2 for about 3 minutes before control rod position indication was regained for the eight affected control rods. The licensee reported that the rod position indication system will sometimes lose position indication if the control rods are inserted beyond the 00 position. The licensee was aware that the unit was subcritical because neutron monitoring average power range monitor (APRM) downscale alarms were received. After confirming that all control rods were fully inserted into the core (one rod was at position 02) the licensee exited EOP-2 and entered EOP -1 (Reactor Scram). When reactor vessel water level was restored to its normal band, EOP-1 was exited.

Following the scram, reactor vessel water level decreased to just below +12 inches, which initiated a Group 2 (containment isolation), Group 6 (reactor water cleanup isolation) and a reactor building isolation signal. Reactor vessel water level is being maintained between +20 and +40 inches (top of active fuel is -125 inches) using a reactor feedwater pump. Offsite power fast transferred as expected and is supplying electrical power to the plant house loads. No safety relief valves opened and the emergency core cooling systems and emergency diesel generators are fully operable if needed.

The licensee suspects that work on the augmented offgas system could have caused the loss of condenser vacuum.

The NRC Resident Inspector was notified of this event by the licensee.