Event Notification Report for September 11, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
09/10/1999 - 09/11/1999
EVENT NUMBERS
36147
Power Reactor
Event Number: 36147
Facility: ARKANSAS NUCLEAR
Region: 4 State: AR
Unit: [1] [] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: FRED VANBUSKERK
HQ OPS Officer: FANGIE JONES
Region: 4 State: AR
Unit: [1] [] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: FRED VANBUSKERK
HQ OPS Officer: FANGIE JONES
Notification Date: 09/11/1999
Notification Time: 06:00 [ET]
Event Date: 09/11/1999
Event Time: 03:01 [CDT]
Last Update Date: 09/11/1999
Notification Time: 06:00 [ET]
Event Date: 09/11/1999
Event Time: 03:01 [CDT]
Last Update Date: 09/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
GARY SANBORN (R4)
GARY SANBORN (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Hot Shutdown | 0 | Hot Shutdown |
EMERGENCY FEEDWATER AUTO STARTED ON TRIPPING OF ALL REACTOR COOLANT PUMPS
"During a planned shutdown for refueling, while securing 2 of 4 Reactor Coolant Pumps (RCP), 'D' Reactor Coolant Pump experienced reverse rotation when it was secured. In this condition, the Abnormal Operating Procedure directs operators to stop all RCPs. In response to the loss of all 4 RCPs, the Emergency Feedwater (EFW) System auto-actuated, as expected, and Natural Circulation Cooling initiated.
"Natural Circulation Cooling is in progress. All systems responded normally to this event.
"The current plan is to install a restraining device to prevent 'D' RCP rotation and then reestablish forced-flow cooling with two operable RCPs (one per loop)."
The licensee notified the NRC Resident Inspector.
"During a planned shutdown for refueling, while securing 2 of 4 Reactor Coolant Pumps (RCP), 'D' Reactor Coolant Pump experienced reverse rotation when it was secured. In this condition, the Abnormal Operating Procedure directs operators to stop all RCPs. In response to the loss of all 4 RCPs, the Emergency Feedwater (EFW) System auto-actuated, as expected, and Natural Circulation Cooling initiated.
"Natural Circulation Cooling is in progress. All systems responded normally to this event.
"The current plan is to install a restraining device to prevent 'D' RCP rotation and then reestablish forced-flow cooling with two operable RCPs (one per loop)."
The licensee notified the NRC Resident Inspector.