Skip to main content

Event Notification Report for August 17, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
08/16/1999 - 08/17/1999

EVENT NUMBERS
360373603836039

Power Reactor
Event Number: 36037
Facility: PERRY
Region: 3     State: OH
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: BOB KIDDER
HQ OPS Officer: BOB STRANSKY
Notification Date: 08/18/1999
Notification Time: 09:00 [ET]
Event Date: 08/17/1999
Event Time: 09:10 [EDT]
Last Update Date: 09/09/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
BRENT CLAYTON (R3)
FEMA, DOE, USDA, HHS (FAX)
EPA, DOT (VIA NRC) (FAX)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
RELEASE OF CHLORINATED WATER TO STORM DRAIN AND OFFSITE NOTIFICATION (Refer to event #36240 for additional information.)

The licensee discovered that, due to valve leakage, a small amount of chlorine was released to a storm drain. The following information was submitted to the NRC Operations Center by facsimile:

"The service water backwash valve on strainer 'd' was experiencing severe leakage past the valve. The system engineer estimated approximately 200 gpm leakage occurred. During this time, the system chlorination evolution occurred for 40 minutes. The forebay water was treated to a concentration of 1 ppm. The result is that an estimated 0.067 lbs of chlorine was discharged to the storm drain. The reportable quantity for chlorine is 10 lbs. There is no reportability requirement for CERCLA; however, an NPDES noncompliance did occur. Reportability is being investigated. The strainer valve has been isolated to prevent it from operating until repairs are complete."

This event is reportable to the NRC within 24 hours in accordance with Section 4.1 of the site Environmental Protection Plan. In addition, the licensee is notifying the US EPA of this release. The NRC resident inspector has been informed of this notification.

* * * UPDATE 0942 9/9/1999 FROM SANFORD TAKEN BY STRANSKY * * *

"On 8/17/99, the Perry Nuclear Power Plant (PNPP) discharged an estimated 0.067 pounds of chlorine to a storm drain from the Service Water System. The storm drain is not an acceptable discharge path for treated Service Water per the National Pollution Discharge Elimination System (NPDES) permit. On 8/18/99, the Ohio Environmental Protection Agency (EPA) was notified of the chlorine discharge to the storm drain. Subsequently, an NRC notification was made in accordance with 10CFR50.72(b)(2)(vi) for notification of other government agencies (i.e., Ohio EPA). This notification also included a 24 hour report in accordance with the EPP for an event that could result in significant environmental Impact. The EPP report was conservatively made since the environmental impact had not been fully evaluated.

"The EPP requires, in part, that any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to plant operations shall be recorded and reported to the NRC within 24 hours with a written report submitted within 30 days. The site environmentalist's evaluation determined that the chlorine content in the service water was extremely low (1 ppm using the most conservative estimate) and there was no significant effect or impact on the environment. Therefore, the EPP reporting was not required and a written report will not be submitted. The NRC notification per 10CFR50.72 is not affected by this update."

The NRC resident inspector has been informed of this update. Notified R3DO (Phillips).


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Hospital
Event Number: 36038
Rep Org: ST. LUKE'S MEDICAL CENTER
Licensee: ST. LUKE'S MEDICAL CENTER
Region: 3
City: MILWAUKEE   State: WI
County:
License #: 48-01338-01
Agreement: N
Docket:
NRC Notified By: DOUGLAS SIMPKIN
HQ OPS Officer: BOB STRANSKY
Notification Date: 08/18/1999
Notification Time: 09:09 [ET]
Event Date: 08/17/1999
Event Time: 14:00 [CDT]
Last Update Date: 08/18/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
35.33 - MED MISADMINISTRATION
Person (Organization):
BRENT CLAYTON (R3)
SCOTT MOORE (NMSS)
Event Text
MEDICAL MISADMINISTRATION

A patient receiving an interstitial iridium-192 brachytherapy treatment was implanted with eight ribbons containing Ir-192 seeds. At 1400 CDT on 8/17/99, hospital personnel discovered that the patient had removed three of the ribbons. The hospital is conducting an investigation to determine the time when the ribbons were removed in order to determine the dosage received. The licensee plans to contact the patient's attending physician.

****************** UPDATE AT 1528 EDT ON 08/18/99 FROM DOUGLAS SIMPKIN TO TROCINE *****************

After reviewing this event and having discussions with NRC Region 3 (Daryl Wiedeman), it was determined that this event was not a misadministration in accordance with 10 CFR 35.33. The patient removed three of the ribbons, and the analyzed dose does not meet the 20% threshold for misadministrations. Therefore, the licensee is retracting this event notification.

The patient's attending physician and radiation oncologist were both contacted to discuss any medical ramifications, and it was determined that there none.

(Call the NRC Operations Center for a contact telephone number.)

The NRC operations officer notified the R3DO (Clayton) and NMSS EO (Piccone).


Power Reactor
Event Number: 36039
Facility: HOPE CREEK
Region: 1     State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: CHRIS SERATA
HQ OPS Officer: LEIGH TROCINE
Notification Date: 08/18/1999
Notification Time: 12:09 [ET]
Event Date: 08/17/1999
Event Time: 12:53 [EDT]
Last Update Date: 08/18/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
PETER ESELGROTH (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
DISCOVERY OF AN OPEN FLOOR DRAIN VALVE WHICH MAY NOT HAVE PREVENTED CO2 FIRE SUPPRESSION AGENT DISSIPATION IN THE EVENT OF A FIRE IN THE CABLE SPREADING ROOM

Hope Creek Operating License Condition 2.c(7) requires PSE&G to implement and maintain in effect all provisions of the approved Fire Protection Program as described in the Updated Final Safety Analysis Report (UFSAR) for the facility through Amendment 15. One of those provisions (UFSAR Section 9.5.1.1.9) requires the control equipment mezzanine floor drain isolation valve to remain closed to prevent CO2 fire suppression agent dissipation. Contrary to this requirement, the control equipment mezzanine floor drain isolation valve was found open at 1253 on 08/17/99. This notification is being made in accordance with License Condition 2.f because no provision had been implemented to maintain the control equipment mezzanine floor drain valve in the closed position.

The control equipment mezzanine contains electrical and control power cabling to and from the control room and remote control panels and equipment. Had a fire occurred in this room with the control equipment mezzanine floor drain valve open, the CO2 system may not have maintained the minimum level of CO2 concentration necessary to extinguish the fire. However, a manual water deluge system was also available to provide backup to the CO2 system. Preliminary analysis indicates that the combination of the remaining CO2 and water deluge would have precluded a fire postulated in the control equipment mezzanine from impacting redundant safety-related equipment. The remote shutdown panel remained available to achieve and maintain the reactor in the shutdown condition remotely from the control room.

The control equipment mezzanine floor drain valve was closed at 1259 on 08/17/99. The floor drain valves in the emergency diesel generator (EDG) area and diesel fuel oil storage tank areas (which are identified in the same UFSAR section) have been verified closed as required. The control equipment mezzanine floor drain valve has been added to the tagging system to ensure that it is controlled and maintained closed. Additional investigation into the extent of the condition is ongoing.

The 'D' EDG is currently inoperable with activities ongoing to clean one of its two fuel oil storage tanks. The 'D' EDG remains available to start in an emergency condition, and it has adequate fuel oil for 3 days of operation. All other EDGs and safety-related equipment are operable at this time.

The licensee stated that it appears that the control equipment mezzanine floor drain isolation valve had been open for an extended period of time (possibly for the life of the plant). The licensee also stated that this issue was identified by the NRC resident inspector during performance of an assessment of the licensee's Fire Protection Program.

NOTE: The valve is located in a 4" drain line. The control equipment mezzanine floor drains are equipped with
drain traps.

The licensee plans to notify the NRC resident inspector and the NRC Region 1 office.