Event Notification Report for August 15, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
08/14/1999 - 08/15/1999
EVENT NUMBERS
36032
Fuel Cycle Facility
Event Number: 36032
Facility: PORTSMOUTH GASEOUS DIFFUSION PLANT
Region: 3 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: JEFF CASTLE
HQ OPS Officer: STEVE SANDIN
Region: 3 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: JEFF CASTLE
HQ OPS Officer: STEVE SANDIN
Notification Date: 08/15/1999
Notification Time: 09:13 [ET]
Event Date: 08/15/1999
Event Time: 05:30 [EDT]
Last Update Date: 08/15/1999
Notification Time: 09:13 [ET]
Event Date: 08/15/1999
Event Time: 05:30 [EDT]
Last Update Date: 08/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
BRUCE BURGESS (R3)
JOHN HICKEY (NMSS)
BRUCE BURGESS (R3)
JOHN HICKEY (NMSS)
24-HOUR NON-CFR REPORT INVOLVING A VALID ACTUATION OF A "Q" SAFETY SYSTEM
"At 0530 hours on 08/15/99, Operations personnel responded to CADP Outleakage Detection System Smokehead SXE2783 alarm at the X-333 Low Assay Withdrawal (LAW) compressor area. Operators responded per Alarm Response Procedures, checked for outleakage and observed smoke in the vicinity of the LAW A/B compressor. Operations immediately evacuated the area, called 911, and initiated a building recall. The CADP smokehead alarmed during compressor startup activities. Initial investigation revealed that the smoke was from the LAW A/B compressor seal. CADP smokehead SXE2783 reset and the outleakage was stopped when the LAW station was vented down below atmospheric pressure.
"The Emergency Response Organization (ERO) responded and monitored air quality for Hydrogen Fluoride, airborne radioactivity and surveyed for surface contamination. All sample results were less than minimum detectable activity.
"This is reportable to the NRC as a valid actuation of a 'Q' Safety System (CADP Smokehead) in accordance with Safety Analysis Report, Section 6.9 (24-Hour Report). PTS-1999- 067/PR-PTS-99-04619."
Operations notified the NRC Resident Inspector and DOE Site Representative.
"At 0530 hours on 08/15/99, Operations personnel responded to CADP Outleakage Detection System Smokehead SXE2783 alarm at the X-333 Low Assay Withdrawal (LAW) compressor area. Operators responded per Alarm Response Procedures, checked for outleakage and observed smoke in the vicinity of the LAW A/B compressor. Operations immediately evacuated the area, called 911, and initiated a building recall. The CADP smokehead alarmed during compressor startup activities. Initial investigation revealed that the smoke was from the LAW A/B compressor seal. CADP smokehead SXE2783 reset and the outleakage was stopped when the LAW station was vented down below atmospheric pressure.
"The Emergency Response Organization (ERO) responded and monitored air quality for Hydrogen Fluoride, airborne radioactivity and surveyed for surface contamination. All sample results were less than minimum detectable activity.
"This is reportable to the NRC as a valid actuation of a 'Q' Safety System (CADP Smokehead) in accordance with Safety Analysis Report, Section 6.9 (24-Hour Report). PTS-1999- 067/PR-PTS-99-04619."
Operations notified the NRC Resident Inspector and DOE Site Representative.