Event Notification Report for July 24, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
07/23/1999 - 07/24/1999
Power Reactor
Event Number: 35956
Facility: DRESDEN
Region: 3 State: IL
Unit: [] [2] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: GADBOIS
HQ OPS Officer: CHAUNCEY GOULD
Region: 3 State: IL
Unit: [] [2] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: GADBOIS
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/24/1999
Notification Time: 13:34 [ET]
Event Date: 07/24/1999
Event Time: 09:20 [CDT]
Last Update Date: 07/24/1999
Notification Time: 13:34 [ET]
Event Date: 07/24/1999
Event Time: 09:20 [CDT]
Last Update Date: 07/24/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
PATRICK HILAND (R3)
PATRICK HILAND (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 57 | Power Operation | 57 | Power Operation |
| 3 | N | Y | 68 | Power Operation | 68 | Power Operation |
OFFSITE NOTIFICATION TO ILLINOIS EPA
THE LICENSEE NOTIFIED THE ILLINOIS EPA AS REQUIRED BY NPDES PERMIT STANDARD CONDITION NO. 12(e)(1) OF AN UNANTICIPATED BYPASS OF THE DRESDEN STATION COOLING POND. THIS OCCURRED DUE TO A LIGHTNING STRIKE THAT CAUSED THE LOSS OF THE COOLING POND LIFT STATION. THE COOLING POND WAS PLACED ON BYPASS AT 2241 CDT ON 07/23/99. LIFT STATION OPERATION WAS RESTORED AND THE COOLING POND PLACED BACK ON INDIRECT OPEN CYCLE AT 0626 CDT ON 07/24/99. BOTH UNITS WERE PREVIOUSLY DERATED DUE TO THERMAL DISCHARGE LIMITATIONS.
THE RESIDENT INSPECTOR WILL BE NOTIFIED.
THE LICENSEE NOTIFIED THE ILLINOIS EPA AS REQUIRED BY NPDES PERMIT STANDARD CONDITION NO. 12(e)(1) OF AN UNANTICIPATED BYPASS OF THE DRESDEN STATION COOLING POND. THIS OCCURRED DUE TO A LIGHTNING STRIKE THAT CAUSED THE LOSS OF THE COOLING POND LIFT STATION. THE COOLING POND WAS PLACED ON BYPASS AT 2241 CDT ON 07/23/99. LIFT STATION OPERATION WAS RESTORED AND THE COOLING POND PLACED BACK ON INDIRECT OPEN CYCLE AT 0626 CDT ON 07/24/99. BOTH UNITS WERE PREVIOUSLY DERATED DUE TO THERMAL DISCHARGE LIMITATIONS.
THE RESIDENT INSPECTOR WILL BE NOTIFIED.
Power Reactor
Event Number: 35957
Facility: CALVERT CLIFFS
Region: 1 State: MD
Unit: [1] [] []
RX Type: [1] CE,[2] CE
NRC Notified By: PACE
HQ OPS Officer: CHAUNCEY GOULD
Region: 1 State: MD
Unit: [1] [] []
RX Type: [1] CE,[2] CE
NRC Notified By: PACE
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/24/1999
Notification Time: 15:16 [ET]
Event Date: 07/24/1999
Event Time: 14:38 [EDT]
Last Update Date: 07/24/1999
Notification Time: 15:16 [ET]
Event Date: 07/24/1999
Event Time: 14:38 [EDT]
Last Update Date: 07/24/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - RPS ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - RPS ACTUATION
Person (Organization):
JAMES NOGGLE (R1)
JAMES NOGGLE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Standby |
AUTO REACTOR TRIP FROM 100% POWER FOLLOWING A TURBINE TRIP.
AN AUTO REACTOR TRIP OCCURRED FROM 100% POWER FOLLOWING A TURBINE TRIP WHICH OCCURRED FOLLOWING LOSS OF UNIT TRANSFORMER U25,000-12. IT APPEARS THAT THE TRANSFORMER FAULT PROTECTION ACTUATED DUE TO A POSSIBLE LIGHTNING STRIKE TO THE TRANSFORMER. THE FIRE DELUGE SYSTEM FOR THE TRANSFORMER ACTUATED, BUT THERE WAS NO EVIDENCE OF ANY FIRE, WITH THE EXCEPTION OF A SCORCHED PHASE BUSHING WHICH MAY HAVE BEEN THE RESULT OF A LIGHTNING STRIKE. THERE IS NO ESTIMATE OF THE EXTENT OF DAMAGE TO THE TRANSFORMER. ALL CONTROL RODS FULLY INSERTED, NO ECCS INJECTION OCCURRED AND NO SAFETY/RELIEF VALVES APPEARED TO HAVE LIFTED. THE CURRENT HEAT SINK IS THE MAIN CONDENSER.
THE RESIDENT INSPECTOR WAS NOTIFIED.
AN AUTO REACTOR TRIP OCCURRED FROM 100% POWER FOLLOWING A TURBINE TRIP WHICH OCCURRED FOLLOWING LOSS OF UNIT TRANSFORMER U25,000-12. IT APPEARS THAT THE TRANSFORMER FAULT PROTECTION ACTUATED DUE TO A POSSIBLE LIGHTNING STRIKE TO THE TRANSFORMER. THE FIRE DELUGE SYSTEM FOR THE TRANSFORMER ACTUATED, BUT THERE WAS NO EVIDENCE OF ANY FIRE, WITH THE EXCEPTION OF A SCORCHED PHASE BUSHING WHICH MAY HAVE BEEN THE RESULT OF A LIGHTNING STRIKE. THERE IS NO ESTIMATE OF THE EXTENT OF DAMAGE TO THE TRANSFORMER. ALL CONTROL RODS FULLY INSERTED, NO ECCS INJECTION OCCURRED AND NO SAFETY/RELIEF VALVES APPEARED TO HAVE LIFTED. THE CURRENT HEAT SINK IS THE MAIN CONDENSER.
THE RESIDENT INSPECTOR WAS NOTIFIED.