Event Notification Report for July 22, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
07/21/1999 - 07/22/1999
EVENT NUMBERS
3595135945359463594735948
General Information or Other
Event Number: 35951
Rep Org: NEW YORK CITY DEPT OF HEALTH
Licensee: NEW YORK PRESBYTERIAN HOSPITAL
Region: 1
City: NEW YORK State: NY
County:
License #: 52-2960-11
Agreement: Y
Docket:
NRC Notified By: BORRI
HQ OPS Officer: CHAUNCEY GOULD
Licensee: NEW YORK PRESBYTERIAN HOSPITAL
Region: 1
City: NEW YORK State: NY
County:
License #: 52-2960-11
Agreement: Y
Docket:
NRC Notified By: BORRI
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/23/1999
Notification Time: 13:20 [ET]
Event Date: 07/22/1999
Event Time: 13:20 [EDT]
Last Update Date: 07/23/1999
Notification Time: 13:20 [ET]
Event Date: 07/22/1999
Event Time: 13:20 [EDT]
Last Update Date: 07/23/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
JAMES NOGGLE (R1)
SCOTT MOORE (NMSS)
JAMES NOGGLE (R1)
SCOTT MOORE (NMSS)
MISSING SHIPMENT OF 10 MILLICURIES OF IODINE-131
NEW YORK PRESBYTERIAN HOSPITAL, NEW YORK CITY, RECEIVED A SHIPMENT OF 10 MILLICURIES OF IODINE -131 ON 07/20/99 FROM MDS NORDIAN, CANADA. THE SOURCE APPEARS TO BE MISSING AS OF 07/22/99. HOSPITAL PERSONNEL ARE SEARCHING FOR THE SHIPMENT AT THE HOSPITAL.
NEW YORK PRESBYTERIAN HOSPITAL, NEW YORK CITY, RECEIVED A SHIPMENT OF 10 MILLICURIES OF IODINE -131 ON 07/20/99 FROM MDS NORDIAN, CANADA. THE SOURCE APPEARS TO BE MISSING AS OF 07/22/99. HOSPITAL PERSONNEL ARE SEARCHING FOR THE SHIPMENT AT THE HOSPITAL.
General Information or Other
Event Number: 35945
Rep Org: TX DEPT OF HEALTH BUR OF RAD CONTRL
Licensee: GENERAL INSPECTION SERVICES, INC
Region: 4
City: AUSTIN State: TX
County:
License #: 02319
Agreement: Y
Docket:
NRC Notified By: JIM OGDEN (FAX)
HQ OPS Officer: CHAUNCEY GOULD
Licensee: GENERAL INSPECTION SERVICES, INC
Region: 4
City: AUSTIN State: TX
County:
License #: 02319
Agreement: Y
Docket:
NRC Notified By: JIM OGDEN (FAX)
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/22/1999
Notification Time: 14:20 [ET]
Event Date: 07/22/1999
Event Time: 10:00 [CDT]
Last Update Date: 07/22/1999
Notification Time: 14:20 [ET]
Event Date: 07/22/1999
Event Time: 10:00 [CDT]
Last Update Date: 07/22/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2202(b)(1) - PERS OVEREXPOSURE/TEDE >= 5 REM
10 CFR Section:
20.2202(b)(1) - PERS OVEREXPOSURE/TEDE >= 5 REM
Person (Organization):
ELMO COLLINS (R4)
LARRY CAMPER (NMSS)
ELMO COLLINS (R4)
LARRY CAMPER (NMSS)
RADIATION EXPOSURE TO AN INDUSTRIAL RADIOGRAPHER
A WHOLE BODY DOSE OF 6.965 REM WAS RECEIVED BY A GENERAL INSPECTION SERVICES, INC INDUSTRIAL RADIOGRAPHER ACCORDING TO HIS APRIL BADGE READING. HE HAS BEEN REMOVED FROM WORK EXPOSING HIM TO IONIZING RADIATION UNTIL 01/01/00. THIS IS TX INCIDENT #7481.
A WHOLE BODY DOSE OF 6.965 REM WAS RECEIVED BY A GENERAL INSPECTION SERVICES, INC INDUSTRIAL RADIOGRAPHER ACCORDING TO HIS APRIL BADGE READING. HE HAS BEEN REMOVED FROM WORK EXPOSING HIM TO IONIZING RADIATION UNTIL 01/01/00. THIS IS TX INCIDENT #7481.
Power Reactor
Event Number: 35946
Facility: INDIAN POINT
Region: 1 State: NY
Unit: [] [3] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: CHARLES KOCSIS
HQ OPS Officer: CHAUNCEY GOULD
Region: 1 State: NY
Unit: [] [3] []
RX Type: [2] W-4-LP,[3] W-4-LP
NRC Notified By: CHARLES KOCSIS
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/22/1999
Notification Time: 15:24 [ET]
Event Date: 07/22/1999
Event Time: 14:30 [EDT]
Last Update Date: 07/22/1999
Notification Time: 15:24 [ET]
Event Date: 07/22/1999
Event Time: 14:30 [EDT]
Last Update Date: 07/22/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
Person (Organization):
JAMES NOGGLE (R1)
JAMES NOGGLE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
OUTSIDE DESIGN BASIS ISSUE
In a conversation with Westinghouse on 07/22/99, the Licensee was advised of the preliminary results of a reanalysis of main steam line break (MSLB) at 70% and 102% power to address a non-conservative assumption made with regard to feedwater addition. The original assumption was 800 cubic feet of unisolable volume which has been determined to be 3,783 cubic feet. This represents the volume from the main boiler feed pump discharge isolation valves to the steam generator (the feedwater isolation valve on the faulted generator is assumed to fail). Westinghouse advised that the preliminary calculation showed that the containment design pressure would be exceeded unless there were changes to the design input assumptions that are part of the Indian Point Unit 3 licensing basis. Based upon this, the Licensee considers Unit 3 to be outside the design basis.
The Licensee evaluated plant operability based upon the telecon with Westinghouse. Westinghouse advised that the MSLB peak pressure would not exceed the current calculated pressure of 42.4 psig for the MSLB assuming a 2.6% shutdown margin with credit for 2300 ppm boron in the emergency core cooling injection line. This analysis changes assumptions in UFSAR Section 14.2.5 of 1.3% shutdown margin (this is the required margin per Technical Specification 3.10.1.1) and unborated water in ECCS lines from the refueling water storage tank. Unit 3 currently meets the changed assumptions. The Licensee considers Unit 3 to be operable based on the Westinghouse preliminary calculation and additional conservatism in this calculation (e.g. feedwater addition for 120 seconds when the valve shuts in about 70 seconds, no credit for restriction of feedwater as the valve shuts).
Administrative controls will have to be put into place to maintain the plant shutdown margin and the boron concentration. The Westinghouse reanalysis was initiated by the Licensee following industry information (Ginna, in LER 50/244/99-01, identified the non-conservative assumption of 800 cubic feet in WCAP-8822).
The Licensee plans to notify the NRC Resident Inspector.
In a conversation with Westinghouse on 07/22/99, the Licensee was advised of the preliminary results of a reanalysis of main steam line break (MSLB) at 70% and 102% power to address a non-conservative assumption made with regard to feedwater addition. The original assumption was 800 cubic feet of unisolable volume which has been determined to be 3,783 cubic feet. This represents the volume from the main boiler feed pump discharge isolation valves to the steam generator (the feedwater isolation valve on the faulted generator is assumed to fail). Westinghouse advised that the preliminary calculation showed that the containment design pressure would be exceeded unless there were changes to the design input assumptions that are part of the Indian Point Unit 3 licensing basis. Based upon this, the Licensee considers Unit 3 to be outside the design basis.
The Licensee evaluated plant operability based upon the telecon with Westinghouse. Westinghouse advised that the MSLB peak pressure would not exceed the current calculated pressure of 42.4 psig for the MSLB assuming a 2.6% shutdown margin with credit for 2300 ppm boron in the emergency core cooling injection line. This analysis changes assumptions in UFSAR Section 14.2.5 of 1.3% shutdown margin (this is the required margin per Technical Specification 3.10.1.1) and unborated water in ECCS lines from the refueling water storage tank. Unit 3 currently meets the changed assumptions. The Licensee considers Unit 3 to be operable based on the Westinghouse preliminary calculation and additional conservatism in this calculation (e.g. feedwater addition for 120 seconds when the valve shuts in about 70 seconds, no credit for restriction of feedwater as the valve shuts).
Administrative controls will have to be put into place to maintain the plant shutdown margin and the boron concentration. The Westinghouse reanalysis was initiated by the Licensee following industry information (Ginna, in LER 50/244/99-01, identified the non-conservative assumption of 800 cubic feet in WCAP-8822).
The Licensee plans to notify the NRC Resident Inspector.
Power Reactor
Event Number: 35947
Facility: TURKEY POINT
Region: 2 State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: B. STAMP
HQ OPS Officer: CHAUNCEY GOULD
Region: 2 State: FL
Unit: [3] [] []
RX Type: [3] W-3-LP,[4] W-3-LP
NRC Notified By: B. STAMP
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/22/1999
Notification Time: 15:05 [ET]
Event Date: 07/22/1999
Event Time: 09:25 [EDT]
Last Update Date: 07/22/1999
Notification Time: 15:05 [ET]
Event Date: 07/22/1999
Event Time: 09:25 [EDT]
Last Update Date: 07/22/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
26.73 - FITNESS FOR DUTY
10 CFR Section:
26.73 - FITNESS FOR DUTY
Person (Organization):
EDWARD MCALPINE (R2)
TAD MARSH (NRR)
EDWARD MCALPINE (R2)
TAD MARSH (NRR)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
UNSATISFACTORY RESULTS FROM A DRUG TESTING LABORATORY
ON 07/21/99, THE LICENSEE SUBMITTED A BLIND SPECIMEN WHICH HAD BEEN SPIKED WITH 1839 NG/ML OF AMPHETAMINE AND 1860 NG/ML OF METHAMPHETAMINE TO A DRUG TESTING LABORATORY IN LEESBURG, FL TO BE ANALYZED. THE RESULTS WERE RECEIVED BY THE LICENSEE AT 0925 ON 07/22/99 AND THEY WERE REPORTED AS NEGATIVE. THE LICENSEE IS CONDUCTING AN INVESTIGATION.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
ON 07/21/99, THE LICENSEE SUBMITTED A BLIND SPECIMEN WHICH HAD BEEN SPIKED WITH 1839 NG/ML OF AMPHETAMINE AND 1860 NG/ML OF METHAMPHETAMINE TO A DRUG TESTING LABORATORY IN LEESBURG, FL TO BE ANALYZED. THE RESULTS WERE RECEIVED BY THE LICENSEE AT 0925 ON 07/22/99 AND THEY WERE REPORTED AS NEGATIVE. THE LICENSEE IS CONDUCTING AN INVESTIGATION.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
General Information or Other
Event Number: 35948
Rep Org: OR DEPT OF HEALTH RAD PROTECTION
Licensee: EUGENE SAND AND GRAVEL COMPANY
Region: 4
City: EUGENE State: OR
County:
License #: ORE-90643
Agreement: Y
Docket:
NRC Notified By: WRIGHT
HQ OPS Officer: CHAUNCEY GOULD
Licensee: EUGENE SAND AND GRAVEL COMPANY
Region: 4
City: EUGENE State: OR
County:
License #: ORE-90643
Agreement: Y
Docket:
NRC Notified By: WRIGHT
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 07/23/1999
Notification Time: 12:06 [ET]
Event Date: 07/22/1999
Event Time: 16:26 [PDT]
Last Update Date: 07/23/1999
Notification Time: 12:06 [ET]
Event Date: 07/22/1999
Event Time: 16:26 [PDT]
Last Update Date: 07/23/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
ELMO COLLINS (R4)
DON COOL (NMSS)
ELMO COLLINS (R4)
DON COOL (NMSS)
TROXLER MOISTURE DENSITY GAUGE DAMAGED AT A FLORENCE, OR. JOBSITE
A TROXLER MOISTURE DENSITY GAUGE SERIES 3400 CONTAINING 9 MILLICURIES OF CESIUM-137 AND 44 MILLICURIES OF AMERICIUM-241-BERYLLIUM WAS RUN OVER BY A PICKUP TRUCK. THE SOURCE ROD WAS IN THE STORAGE POSITION WHEN THE DEVICE WAS RUN OVER. THE ONLY DAMAGE APPEARS TO BE TO THE ELECTRONICS PORTION OF THE DEVICE. A PRELIMINARY SWIPE WAS TAKEN AND NO CONTAMINATION WAS DETERMINED. THE DEVICE IS BEING STORED AT THE LICENSEE'S FACILITY IN EUGENE, OREGON AWAITING TO BE SENT BACK TO THE MANUFACTURER.
A TROXLER MOISTURE DENSITY GAUGE SERIES 3400 CONTAINING 9 MILLICURIES OF CESIUM-137 AND 44 MILLICURIES OF AMERICIUM-241-BERYLLIUM WAS RUN OVER BY A PICKUP TRUCK. THE SOURCE ROD WAS IN THE STORAGE POSITION WHEN THE DEVICE WAS RUN OVER. THE ONLY DAMAGE APPEARS TO BE TO THE ELECTRONICS PORTION OF THE DEVICE. A PRELIMINARY SWIPE WAS TAKEN AND NO CONTAMINATION WAS DETERMINED. THE DEVICE IS BEING STORED AT THE LICENSEE'S FACILITY IN EUGENE, OREGON AWAITING TO BE SENT BACK TO THE MANUFACTURER.