Event Notification Report for July 16, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
07/15/1999 - 07/16/1999
Fuel Cycle Facility
Event Number: 35926
Facility: PORTSMOUTH GASEOUS DIFFUSION PLANT
Region: 3 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: RON CRABTREE
HQ OPS Officer: STEVE SANDIN
Region: 3 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: RON CRABTREE
HQ OPS Officer: STEVE SANDIN
Notification Date: 07/16/1999
Notification Time: 17:46 [ET]
Event Date: 07/16/1999
Event Time: 16:00 [EDT]
Last Update Date: 07/16/1999
Notification Time: 17:46 [ET]
Event Date: 07/16/1999
Event Time: 16:00 [EDT]
Last Update Date: 07/16/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
RONALD GARDNER (R3)
JOHN GREEVES (NMSS)
RONALD GARDNER (R3)
JOHN GREEVES (NMSS)
4-HOUR REPORT INVOLVING COURTESY NOTIFICATION TO OSHA FOLLOWING AN EMPLOYEE WORK INJURY.
"On 7/16/99 at 1028 hours, it was reported to Emergency Responders that an employee had been injured by an electrical flash while performing Preventative Maintenance on a 480volt system. Emergency Medical Technicians/Paramedics responded to the scene and treated/stabilized employee and transported the employee to an area hospital for further treatment. At approximately 1600 hours, The PORTS ES&H Manager made a courtesy notification to OSHA regarding this injury/accident. This notification to another government agency is reportable to NRC as a four-hour notification report."
The NRC Resident Inspector and DOE Site Representative were informed.
"On 7/16/99 at 1028 hours, it was reported to Emergency Responders that an employee had been injured by an electrical flash while performing Preventative Maintenance on a 480volt system. Emergency Medical Technicians/Paramedics responded to the scene and treated/stabilized employee and transported the employee to an area hospital for further treatment. At approximately 1600 hours, The PORTS ES&H Manager made a courtesy notification to OSHA regarding this injury/accident. This notification to another government agency is reportable to NRC as a four-hour notification report."
The NRC Resident Inspector and DOE Site Representative were informed.
Power Reactor
Event Number: 35927
Facility: BEAVER VALLEY
Region: 1 State: PA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: CHARLES TRIPLETT
HQ OPS Officer: STEVE SANDIN
Region: 1 State: PA
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: CHARLES TRIPLETT
HQ OPS Officer: STEVE SANDIN
Notification Date: 07/16/1999
Notification Time: 19:25 [ET]
Event Date: 07/16/1999
Event Time: 19:12 [EDT]
Last Update Date: 07/16/1999
Notification Time: 19:25 [ET]
Event Date: 07/16/1999
Event Time: 19:12 [EDT]
Last Update Date: 07/16/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS 50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS 50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
JOHN WHITE (R1)
JOHN WHITE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 94 | Power Operation | 94 | Power Operation |
UNIT 2 COMMENCED A TECH SPEC REQUIRED SHUTDOWN DUE TO THE LOSS OF BOTH A BATTERY CHARGER AND ITS ASSOCIATED RECTIFIER.
"WHILE TESTING #2 EMERGENCY DIESEL GENERATOR, THE SUPPLY BREAKER FROM THE NORMAL 4KV BUS TRIPPED OPEN ON AN OVERCURRENT SIGNAL. THE #2 EMERGENCY DIESEL GENERATOR WAS TRIPPED DUE TO INDICATED LOW EXCITATION VOLTAGE. THIS LED TO A LOSS OF POWER TO THE DF EMERGENCY BUS. NUMBER 2 AND 4 BATTERY CHARGERS BECAME INOPERABLE AND ENTRY INTO TECH SPEC 3.0.3 ACTION STATEMENT OCCURRED. TECH SPEC REQUIRED SHUTDOWN WAS INITIATED AT 1912[EDT]. INVESTIGATION IS CONTINUING TO DETERMINE CAUSE OF BREAKER TRIP."
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE 2108EDT ON 7/16/99 FROM CHARLES TRIPLETT TO S. SANDIN * * *
THE LICENSEE IS UPDATING THIS REPORT TO INCLUDE AN ESF ACTUATION OF THE #2 EMERGENCY DIESEL GENERATOR.
"AFTER BEING MANUALLY TRIPPED AT 1729[EDT] DUE TO INDICATED LOW EXCITATION VOLTAGE, THE #2 EMERGENCY DIESEL GENERATOR SUBSEQUENTLY RESTARTED AUTOMATICALLY AT 1812[EDT] WHEN DIESEL GENERATOR AUTO/LOCAL CONTROL SWITCH WAS TAKEN TO THE LOCAL POSITION. THE DIESEL OUTPUT BREAKER CONTROL SWITCH WAS IN PULL-TO-LOCK AND DID NOT RECLOSE. INVESTIGATION INTO THE CAUSE OF THE AUTO START IS CONTINUING.
"UPDATING [THIS REPORT], THE DE-ENERGIZED DF EMERGENCY BUS HAS BEEN RE-ENERGIZED AND BOTH BATTERY CHARGERS ARE CHARGING [THEIR] RESPECTIVE BATTERIES. THE BATTERIES ARE INOPERABLE DUE TO LOW PILOT CELL VOLTAGE AND [THE] PLANT SHUTDOWN CONTINUES."
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. NOTIFIED R1DO(WHITE).
"WHILE TESTING #2 EMERGENCY DIESEL GENERATOR, THE SUPPLY BREAKER FROM THE NORMAL 4KV BUS TRIPPED OPEN ON AN OVERCURRENT SIGNAL. THE #2 EMERGENCY DIESEL GENERATOR WAS TRIPPED DUE TO INDICATED LOW EXCITATION VOLTAGE. THIS LED TO A LOSS OF POWER TO THE DF EMERGENCY BUS. NUMBER 2 AND 4 BATTERY CHARGERS BECAME INOPERABLE AND ENTRY INTO TECH SPEC 3.0.3 ACTION STATEMENT OCCURRED. TECH SPEC REQUIRED SHUTDOWN WAS INITIATED AT 1912[EDT]. INVESTIGATION IS CONTINUING TO DETERMINE CAUSE OF BREAKER TRIP."
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE 2108EDT ON 7/16/99 FROM CHARLES TRIPLETT TO S. SANDIN * * *
THE LICENSEE IS UPDATING THIS REPORT TO INCLUDE AN ESF ACTUATION OF THE #2 EMERGENCY DIESEL GENERATOR.
"AFTER BEING MANUALLY TRIPPED AT 1729[EDT] DUE TO INDICATED LOW EXCITATION VOLTAGE, THE #2 EMERGENCY DIESEL GENERATOR SUBSEQUENTLY RESTARTED AUTOMATICALLY AT 1812[EDT] WHEN DIESEL GENERATOR AUTO/LOCAL CONTROL SWITCH WAS TAKEN TO THE LOCAL POSITION. THE DIESEL OUTPUT BREAKER CONTROL SWITCH WAS IN PULL-TO-LOCK AND DID NOT RECLOSE. INVESTIGATION INTO THE CAUSE OF THE AUTO START IS CONTINUING.
"UPDATING [THIS REPORT], THE DE-ENERGIZED DF EMERGENCY BUS HAS BEEN RE-ENERGIZED AND BOTH BATTERY CHARGERS ARE CHARGING [THEIR] RESPECTIVE BATTERIES. THE BATTERIES ARE INOPERABLE DUE TO LOW PILOT CELL VOLTAGE AND [THE] PLANT SHUTDOWN CONTINUES."
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. NOTIFIED R1DO(WHITE).
Power Reactor
Event Number: 35924
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: VINCENT FALLACARA
HQ OPS Officer: STEVE SANDIN
Region: 1 State: MA
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: VINCENT FALLACARA
HQ OPS Officer: STEVE SANDIN
Notification Date: 07/16/1999
Notification Time: 13:24 [ET]
Event Date: 07/16/1999
Event Time: 12:45 [EDT]
Last Update Date: 07/16/1999
Notification Time: 13:24 [ET]
Event Date: 07/16/1999
Event Time: 12:45 [EDT]
Last Update Date: 07/16/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
Person (Organization):
JOHN WHITE (R1)
JOHN WHITE (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
LICENSEE IDENTIFIED DURING OPERATOR REQUALIFICATION A CONDITION WHICH PLACES THE UNIT OUTSIDE THE DESIGN BASES.
"PDC99.05 (EDG breaker logic modification) could prevent B6 [swing bus] from automatically re-energizing during a LOCA coincident with degraded voltage.
"A LOCA with degraded voltage will delay the de-energization of the 480V load centers BI and B2. The EDG's will start immediately on the LOCA signal and the new design will have the EDG 10 second timer working in parallel with the degraded voltage 10 second timer. Once the degraded voltage relay times out the 4KV buses A5 and A6 will be isolated and the EDGs will load within a couple of seconds. This time will not allow the B6 transfer breaker time to precharge and thus leave bus B6 de-energized.
"The problem was identified during review of [Problem Report] PR99.9417.
"[The cause of the problem was that ] the design did not consider the pre-charging time of the B6 feeder breakers.
"[Corrective actions taken included a determination that ] the EDG, emergency distribution system and ECCS systems are operable. The basis for operability identified in Engineering Evaluation EE98-54 (operability evaluation OP98-34) still apply."
The corrective action includes verifying grid stability and, if a degraded voltage condition exists, starting the stations EDGs and realigning the power supplies for the safeguards buses. The licensee informed the NRC Resident Inspector.
"PDC99.05 (EDG breaker logic modification) could prevent B6 [swing bus] from automatically re-energizing during a LOCA coincident with degraded voltage.
"A LOCA with degraded voltage will delay the de-energization of the 480V load centers BI and B2. The EDG's will start immediately on the LOCA signal and the new design will have the EDG 10 second timer working in parallel with the degraded voltage 10 second timer. Once the degraded voltage relay times out the 4KV buses A5 and A6 will be isolated and the EDGs will load within a couple of seconds. This time will not allow the B6 transfer breaker time to precharge and thus leave bus B6 de-energized.
"The problem was identified during review of [Problem Report] PR99.9417.
"[The cause of the problem was that ] the design did not consider the pre-charging time of the B6 feeder breakers.
"[Corrective actions taken included a determination that ] the EDG, emergency distribution system and ECCS systems are operable. The basis for operability identified in Engineering Evaluation EE98-54 (operability evaluation OP98-34) still apply."
The corrective action includes verifying grid stability and, if a degraded voltage condition exists, starting the stations EDGs and realigning the power supplies for the safeguards buses. The licensee informed the NRC Resident Inspector.