Event Notification Report for July 10, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
07/09/1999 - 07/10/1999
EVENT NUMBERS
35911
Power Reactor
Event Number: 35911
Facility: DRESDEN
Region: 3 State: IL
Unit: [] [] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: SALGADO
HQ OPS Officer: DOUG WEAVER
Region: 3 State: IL
Unit: [] [] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: SALGADO
HQ OPS Officer: DOUG WEAVER
Notification Date: 07/10/1999
Notification Time: 19:15 [ET]
Event Date: 07/10/1999
Event Time: 16:55 [CDT]
Last Update Date: 07/10/1999
Notification Time: 19:15 [ET]
Event Date: 07/10/1999
Event Time: 16:55 [CDT]
Last Update Date: 07/10/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
THOMAS KOZAK (R3)
THOMAS KOZAK (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
ISOLATION CONDENSER INOPERABLE
During quarterly valve time testing, the isolation condenser reactor return valve failed to open. The valve is required to be open for the isolation condenser to perform its function. The cause of the failure has not been determined and is under investigation. The plant entered a 14 day LCO based on having the isolation condenser inoperable. No other ECCS equipment is inoperable.
The licensee will notify the resident inspector.
During quarterly valve time testing, the isolation condenser reactor return valve failed to open. The valve is required to be open for the isolation condenser to perform its function. The cause of the failure has not been determined and is under investigation. The plant entered a 14 day LCO based on having the isolation condenser inoperable. No other ECCS equipment is inoperable.
The licensee will notify the resident inspector.