Event Notification Report for June 12, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
06/11/1999 - 06/12/1999

EVENT NUMBERS
3581735818

Power Reactor
Event Number: 35817
Facility: CATAWBA
Region: 2     State: SC
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: RUDD
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 06/12/1999
Notification Time: 16:58 [ET]
Event Date: 06/12/1999
Event Time: 14:12 [EDT]
Last Update Date: 06/12/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
BRIAN BONSER (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N N 0 Hot Shutdown 0 Hot Shutdown
Event Text
PLANT HAD A STEAM GENERATOR HI-HI (P14) LEVEL SIGNAL.

UPON OPENING THE "2A" STEAM GENERATOR MSIV PER PROCEDURE, A SUBSEQUENT STEAM GENERATOR LEVEL SWELL OCCURRED RESULTING IN A P14 (STEAM GENERATOR HI-HI LEVEL) SIGNAL. NO COMPONENTS CHANGED STATE SINCE THEY WERE ALREADY POSITIONED(i.e. CLOSED OR TRIPPED) BASED ON PLANT CONDITION OF MODE 4. THE CAUSE APPEARS TO BE A PROCEDURAL DEFICIENCY, WHICH WILL BE CORRECTED WITH A PROCEDURE CHANGE.

THE RESIDENT INSPECTOR WILL BE NOTIFIED.


Power Reactor
Event Number: 35818
Facility: FARLEY
Region: 2     State: AL
Unit: [] [2] []
RX Type: [1] W-3-LP,[2] W-3-LP
NRC Notified By: HAWKINS
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 06/12/1999
Notification Time: 23:44 [ET]
Event Date: 06/12/1999
Event Time: 21:47 [CDT]
Last Update Date: 06/12/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
BRIAN BONSER (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 100 Power Operation 0 Hot Standby
Event Text
THE PLANT HAD A MANUAL REACTOR TRIP FROM 100% POWER.

A MANUAL REACTOR TRIP WAS INITIATED BECAUSE OF A LOSS OF CONDENSER VACUUM (CAUSE UNKNOWN AND BEING INVESTIGATED). ALL RODS FULLY INSERTED, NO ECCS INJECTION INITIATED AND NO SAFETY OR RELIEF VALVES LIFTED. AUXILIARY FEEDWATER STARTED AS EXPECTED FOLLOWING THE REACTOR TRIP AND THEY ARE USING THE STEAM GENERATORS VIA THE STEAM DUMPS AS A HEAT SINK. ALL SYSTEMS OPERATED SATISFACTORILY FOLLOWING THE TRIP WITH THE EXCEPTION OF THE M-35 INTERMEDIATE RANGE CHANNEL, WHICH FAILED LOW. THE CAUSE OF THIS FAILURE IS ALSO BEING INVESTIGATED.

THE RESIDENT INSPECTOR WAS NOTIFIED.