Skip to main content

Event Notification Report for May 30, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/29/1999 - 05/30/1999

EVENT NUMBERS
3577935780

Power Reactor
Event Number: 35779
Facility: BROWNS FERRY
Region: 2     State: AL
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: JOE BENNETT
HQ OPS Officer: STEVE SANDIN
Notification Date: 05/30/1999
Notification Time: 08:00 [ET]
Event Date: 05/30/1999
Event Time: 05:22 [CDT]
Last Update Date: 05/30/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
THOMAS DECKER (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
UNIT 2 EXPERIENCED VARIOUS ESF ACTUATIONS IN RESPONSE TO THE UNEXPECTED TRIP OF THE "2B" RPS MOTOR GENERATOR SET.

"AT 0522CDT ON 5/30/99, THE '2B' REACTOR PROTECTION SYSTEM (RPS) MOTOR GENERATOR (MG) SET TRIPPED. THE CAUSE OF THE RPS MG SET TRIP HAS NOT BEEN DETERMINED. THE LOSS OF POWER RESULTED IN AN ISOLATION OF PRIMARY CONTAINMENT ISOLATION SYSTEM (PCIS) GROUPS 6 (VENTILATION) AND 8 (TIPS), AND PARTIAL ISOLATIONS OF GROUPS 3 (RWCU) AND 2 (DRYWELL SUMP ISOLATION VALVES). ADDITIONALLY, THE STANDBY GAS TREATMENT AND CREV SYSTEMS AUTOMATICALLY INITIATED. AT 0538CDT, ALTERNATE POWER WAS RESTORED AND THE SYSTEMS WERE RETURNED TO NORMAL.

"THIS [EVENT] ALSO REQUIRES A 30 DAY WRITTEN REPORT PER 10 CFR 50.73(a)(2)(iv)."

THERE WAS NO ONGOING ELECTRICAL MAINTENANCE AT THE TIME. THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.


Power Reactor
Event Number: 35780
Facility: DIABLO CANYON
Region: 4     State: CA
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DAVID PIERCE
HQ OPS Officer: LEIGH TROCINE
Notification Date: 05/30/1999
Notification Time: 17:04 [ET]
Event Date: 05/30/1999
Event Time: 12:10 [PDT]
Last Update Date: 05/30/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
GAIL GOOD (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
OFFSITE NOTIFICATION OF THE CAPTURE AND SUBSEQUENT RELEASE OF A GREEN SEA TURTLE

The following text is a portion of a facsimile received from the licensee:

"On 05/30/99 at approximately 1210 PDT, a male green sea turtle was removed from the Diablo Canyon Power Plant intake structure. The sea turtle had entered the intake structure by swimming under the apron wall and surfacing outside of the bar racks. The sea turtle was transported by boat to a release point approximately 0.5 miles due west of the intake structure. It was observed to swim strongly away from the release point. The turtle's shell length was measured at 69 cm, and its weight was estimated to be 50-75 lbs. The turtle appeared to be in good health with no visible injuries with the exception of some scrapes on the rear of its shell."

"The Diablo Canyon Power Plant Environmental Services Department has notified the National Marine Fisheries Service and the California Department of Fish and Game of the capture and subsequent release of the sea turtle, which is protected under the Endangered Species Act."

The licensee plans to notify the NRC resident inspector.