Event Notification Report for May 21, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/20/1999 - 05/21/1999

EVENT NUMBERS
35750357513575235753357543576035761

Power Reactor
Event Number: 35750
Facility: ARKANSAS NUCLEAR
Region: 4     State: AR
Unit: [] [2] []
RX Type: [1] B&W-L-LP,[2] CE
NRC Notified By: WAYNE AHO
HQ OPS Officer: JOHN MacKINNON
Notification Date: 05/21/1999
Notification Time: 13:38 [ET]
Event Date: 05/21/1999
Event Time: 09:39 [CDT]
Last Update Date: 05/21/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
GARY SANBORN (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
Event Text
CONTROL ROOM ISOLATION & EMERGENCY VENTILATION/FILTRATION SYSTEM (CREVS) ACTUATION

A Health Physics Technician was transporting a spent fuel pool purification filter in the vicinity of the radiation detectors for the CREVS system. The filter had a contact reading of 131 mrem/hour, and 45.4 mrem/hour at 30 cm. The actuated radiation detector, #2RITS-8750-1B, has a setpoint of 140 counts per minute., This filter was placed near the detector, causing the actuation.

This is not the normal transport path for contaminated filters. The filter was triple-bagged, but developed a leak during transport. The Health Physics Technician decided to place the filter in a barrel that is normally used for torn protective clothing, to prevent the spread of contamination. This barrel is in the vicinity of the control room ventilation radiation detectors.

At 1035 CDT, the control room ventilation system was returned to normal.

Unit 1 was unaffected by this event.

The NRC Resident Inspector was notified of this event by the licensee.


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 35751
Facility: HARRIS
Region: 2     State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: MARK ELLINGTON
HQ OPS Officer: JOHN MacKINNON
Notification Date: 05/21/1999
Notification Time: 13:53 [ET]
Event Date: 05/21/1999
Event Time: 10:16 [EDT]
Last Update Date: 05/25/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
ANN BOLAND (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
INADVERTENT START OF THE 'B' CONTAINMENT SPRAY PUMP DUE TO AN INVALID START SIGNAL

While performing the test of the Sequencer Block Circuit and Containment Fan Cooler, Train 'B' (#OST- 1095) with the plant at 100% power, a maintenance technician placed multimeter leads on the wrong terminal points. These terminal points were adjacent to the desired points. This caused an inadvertent start of the 'B' Containment Spray Pump. This invalid actuation was the result of an invalid signal generated by the maintenance technician. Investigation indicates that no other components actuated.

The pump was aligned in standby and no flow was admitted to containment. The pump operated for approximately two minutes with adequate recirculation flow before it was secured. No equipment damage occurred and the 'B' Containment Spray system is currently operable. The licensee has conservatively determined that the pump start constitutes an ESF actuation.

The NRC Resident Inspector was notified of this event by the licensee.

* * * UPDATE AT 1817 ON 5/25/99 BY ELLINGTON, TAKEN BY WEAVER * * *

On May 21, 1999, Harris Nuclear Plant performed a four hour non-emergency notification for an ESF actuation on the inadvertent starting of the B Containment Spray Pump. Harris Nuclear Plant has subsequently determined that no other components actuated nor would have actuated as a result of this event. The B Containment Spray Pump cannot by itself mitigate the consequences of an accident. In order for the Containment Spray System to mitigate the consequences of an accident, a downstream header isolation valve would have been required to open. This header isolation valve remained shut during this event. Harris Nuclear Plant has determined that this event was a single component actuation with no other components actuated and this single Component actuation could not have alone mitigated the consequences of an accident. Therefore, Harris Nuclear Plant retracts the May 21, 1999 four hour non-emergency notification per guidance provided in NRC NUREG-1022, Revision 1 page 53.

The licensee will inform the NRC resident inspector. The HOO notified the R2DO (Decker).


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 35752
Facility: FERMI
Region: 3     State: MI
Unit: [2] [] []
RX Type: [2] GE-4
NRC Notified By: STEVE MAREK
HQ OPS Officer: JOHN MacKINNON
Notification Date: 05/21/1999
Notification Time: 15:02 [ET]
Event Date: 05/21/1999
Event Time: 10:14 [EDT]
Last Update Date: 06/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
BRENT CLAYTON (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 15 Power Operation 15 Power Operation
Event Text
24 hour License Condition 2.C.(9) report concerning non-compliance with the approved fire protection program.

During a design calculation review, plant engineering department personnel discovered that cable routing for safety/relief valve (SRV) 'G' is not in compliance with Appendix R design assumptions for cable separation. The SRV is used in the dedicated shutdown procedure to control reactor pressure and to depressurize the plant so that a cold shutdown condition can be achieved within 10 hours after plant shutdown (UFSAR commitment). An hourly fire watch has been established in the affected zone, pending an evaluation by engineering department personnel.

The NRC Resident Inspector has been notified of this event notification by the licensee.

* * * RETRACTED AT 1454 EDT ON 6/15/99 BY PATRICK FALLON TO WILLIAM POERTNER * * *

"Further review determined that the previously reported cable routing of associated circuits for SRV 'G' being different than the Appendix R design assumptions, would not have affected the ability of SRV 'G' to function as assumed in the Dedicated Shutdown Procedure. Although the associated circuits were routed through fire zones where use of the Dedicated Shutdown Procedure was required, the fuses for the associated circuits were appropriately coordinated such that fire induced multiple high impedance faults would not have prevented operation of SRV 'G' as assumed in the procedure. Therefore, the existing configuration is in compliance with the approved Fermi 2 fire protection program as required by License Condition 2.C.(9). Accordingly, the previous notification made in accordance with License Condition 2.F is withdrawn."

The licensee notified the NRC resident inspector. HOO notified R3DO (JOHN MADERA).


Power Reactor
Event Number: 35753
Facility: QUAD CITIES
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: RON RUSTICK
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 05/21/1999
Notification Time: 22:40 [ET]
Event Date: 05/21/1999
Event Time: 20:46 [CDT]
Last Update Date: 05/22/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
BRENT CLAYTON (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Shutdown
Event Text
- UNIT 1 SCRAMMED FROM 100% POWER DUE TO A SCRAM DISCHARGE VOLUME HIGH LEVEL SIGNAL -

AT 2046 CDT ON 05/21/99, UNIT 1 RECEIVED A 'B' HALF SCRAM SIGNAL DUE TO A SCRAM DISCHARGE VOLUME HIGH LEVEL SIGNAL. APPROXIMATELY 45 SECONDS LATER, UNIT 1 RECEIVED A FULL SCRAM SIGNAL DUE TO A SCRAM DISCHARGE VOLUME HIGH LEVEL SIGNAL. THE REACTOR SCRAMMED FROM 100% POWER DUE TO A VALID SCRAM DISCHARGE VOLUME HIGH LEVEL SIGNAL POSSIBLY DUE TO A LEAKING VALVE ON A SCRAM DISCHARGE VOLUME HYDRAULIC CONTROL UNIT.

ALL CONTROL RODS INSERTED COMPLETELY. NO SAFETY/RELIEF VALVES LIFTED. DECAY HEAT IS BEING DISSIPATED VIA THE STEAM JET AIR EJECTORS AND AUXILIARY LOADS. UNIT 1 PRIMARY CONTAINMENT ISOLATION SYSTEM GROUP 2 (STANDBY GAS TREATMENT SYSTEM) AND GROUP 3 (REACTOR WATER CLEANUP SYSTEM) ACTUATED. UNIT 1 IS STABLE IN OPERATIONAL CONDITION 3 (HOT SHUTDOWN). THE LICENSEE IS INVESTIGATING THE CAUSE OF THE SCRAM DISCHARGE VOLUME HIGH LEVEL SIGNALS.

THIS EVENT HAD NO EFFECT ON UNIT 2 WHICH IS OPERATING AT 100% POWER.

THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.

* * * UPDATE AT 0800 EDT ON 5/22/99 BY RON RUSTICK TO FANGIE JONES * * *

In review of the event it was noted that the Unit 1 diesel generator auto-started on the transfer of auxiliary power, an ESF actuation.

It is also believed that a reactor water cleanup system relief valve lifted, pressurizing the reactor building drain tank and forcing backflow to fill up the scram discharge volume causing the reactor scram.

The licensee informed the NRC Resident Inspector. The Headquarters Operations Officer informed the R3DO (Brent Clayton).


Power Reactor
Event Number: 35754
Facility: PEACH BOTTOM
Region: 1     State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: JIM KOVALCHICK
HQ OPS Officer: FANGIE JONES
Notification Date: 05/22/1999
Notification Time: 01:56 [ET]
Event Date: 05/21/1999
Event Time: 22:20 [EDT]
Last Update Date: 05/22/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
PETER ESELGROTH (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
PRIMARY CONTAINMENT ISOLATION SYSTEM ACTUATION DUE TO UNEXPECTED POWER LOSS

"At 2220 [EDT] on 5/21/99 two of four 4 kVolt emergency electrical buses on Unit 2 and Unit 3 fast transferred to the alternate offsite feed when the normal offsite feed unexpectedly deenergized during switching operations. The momentary power loss that occurred during the fast transfer unexpectedly deenergized control logics that resulted in the following invalid Primary Containment Isolation System Isolation actuations:

Unit 2
a) Outboard isolation of Drywell Instrument Nitrogen System
b) Outboard isolation of Reactor Water Cleanup System
c) Outboard isolation of Drywell Sump System

Unit 3
a) Inboard isolation of Drywell Instrument Nitrogen System
b) Inboard isolation of Drywell Sump System
c) Full Reactor Water Cleanup System isolation
d) Inboard isolation Containment Atmosphere Sampling System

"The cause of the loss of feed is under investigation. Both units remain at 100 % power." Power has been restored to the normal offsite feed, but the busses are not being transferred back until the cause of the loss of power is determined.

The licensee notified the NRC Resident Inspector.


General Information or Other
Event Number: 35760
Rep Org: TEXAS DEPARTMENT OF HEALTH
Licensee: MAXIM TECHNOLOGIES INC.
Region: 4
City: DALLAS   State: TX
County:
License #:
Agreement: Y
Docket:
NRC Notified By:
HQ OPS Officer: FANGIE JONES
Notification Date: 05/24/1999
Notification Time: 11:29 [ET]
Event Date: 05/21/1999
Event Time: 00:00 [CDT]
Last Update Date: 05/24/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2201(a)(1)(i) - LOST/STOLEN LNM>1000X
Person (Organization):
THOMAS ANDREWS (R4)
CHARLEY HAUGHNEY (NMSS)
Event Text
AGREEMENT STATE REPORT RECEIVED VIA FACSIMILE

The following text is a portion of a facsimile received from the Texas Department of Health:

"10 CFR Part 20.2201(a)(1)(I) - Report of theft/loss of greater than or equal to 1000 X App C value."

"Incident report 7463: On Friday, 5/21/99, Maxim Technologies Inc. of Dallas, TX notified the Agency of a lost moisture density gauge. Followup with the Licensee determined the gauge contained ~40 mCi AmBe-241 and 8 mCi of Cs-137 and has not been found. The Licensee notified local authorities and NRC. The gauge was lost in the Plano area"

There was no additional information available on the facsimile.

(Call the NRC Operations Center for a contact telephone number and address.)


Other Nuclear Material
Event Number: 35761
Rep Org: MATERIALS TESTING & INSPECTION INC.
Licensee: MATERIALS TESTING & INSPECTION, INC.
Region: 4
City: ARCO   State: ID
County:
License #: 11-27504-01
Agreement: N
Docket:
NRC Notified By: GEORGE DUPONT
HQ OPS Officer: DOUG WEAVER
Notification Date: 05/24/1999
Notification Time: 18:19 [ET]
Event Date: 05/21/1999
Event Time: 18:00 [MDT]
Last Update Date: 05/24/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
THOMAS ANDREWS (R4)
CHARLEY HAUGHNEY (NMSS)
Event Text
MOISTURE DENSITY GAUGE DAMAGED DURING TRAFFIC ACCIDENT

A Campbell Pacific moisture density gauge was damaged when the pickup in which it was secured was involved in a traffic accident. The gauge broke loose during the accident and was ejected from the truck. A company representative went to the site and surveyed the gauge, which was locked with the case intact. Surveys performed at the crash site indicated no contamination resulted from this incident.

The gauge contains approximately 10 mCi of Cs-137 and 50 mCi of Am-241.