Event Notification Report for May 13, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/12/1999 - 05/13/1999

EVENT NUMBERS
35741357103571235713

General Information or Other
Event Number: 35741
Rep Org: NC BUREAU OF RAD PROTECTION
Licensee: STERIGENICS INTERNATIONAL CORP
Region: 2
City: CHARLOTTE   State: NC
County:
License #: NC 060-0974-1
Agreement: Y
Docket:
NRC Notified By: J. MARION EADDY III
HQ OPS Officer: STEVE SANDIN
Notification Date: 05/19/1999
Notification Time: 15:53 [ET]
Event Date: 05/13/1999
Event Time: 21:30 [EDT]
Last Update Date: 05/19/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
ANN BOLAND (R2)
LARRY CAMPER (NMSS)
Event Text
AGREEMENT STATE REPORT INVOLVING PANORAMIC IRRADIATOR SOURCE RACK FAILURE TO RETRACT TO THE FULLY SHIELDED POSITION.

The following information was provided by the NC Bureau of Radiation Protection via fax:

LICENSEE:

SteriGenics International Corporation
10811 Withers Cove Park
Charlotte, NC 28278
N.C. Radioactive Materials License No. 060-0974-1

DESCRIPTION OF THE EVENT:

The N. C. Division of Radiation Protection (DRP) was notified by telephone on 14 May 1999 at 15:50 that a power failure had occurred at the above referenced facility on 13 May 1999 at approximately 21:30. The licensee has two (2) irradiator pools at the facility. One of the racks (the 'smaller' activity rack) did not return to its fully shielded position as required by 10 CFR 36.37 and had to be manually lowered into the pool. The Radiation Safety Officer at the facility stated that no cell entry occurred and that all interlocks were operational during the event.

SteriGenics is in the process of conducting tests of the uninterruptable power supply(ies) on site, as well as other systems. Their engineering staff is currently analyzing the root cause of the failure. SteriGenics has been notified by DRP of the 30 day reporting requirement in 10 CFR 36.83.

North Carolina has assigned Log No. 99-08 to this incident.


Power Reactor
Event Number: 35710
Facility: BYRON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DAVE FLOWERS
HQ OPS Officer: LEIGH TROCINE
Notification Date: 05/13/1999
Notification Time: 09:47 [ET]
Event Date: 05/13/1999
Event Time: 08:10 [CDT]
Last Update Date: 05/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
ROGER LANKSBURY (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 A/R Y 100 Power Operation 0 Hot Standby
Event Text
AUTOMATIC REACTOR TRIP DUE TO AN INADVERTENT POWER RANGE HIGH FLUX SIGNAL DURING THE PERFORMANCE OF SURVEILLANCE TESTING

At 0810 CDT, Unit 1 experienced an automatic reactor trip from 100% power due to an inadvertent power range high flux trip signal during the performance of instrumentation and control surveillance testing. All rods fully inserted. Following the trip, feedwater isolated as expected, and the auxiliary feedwater pumps automatically started on low 2 steam generator level (18% narrow range) as designed. (Steam generator level decreased to 0% narrow range, and normal steam generator level is 63%.) In addition, the 'K' steam dump failed to reclose, and this caused reactor coolant system temperature to decrease slightly below the P-12 setpoint of 550°F for a short period of time. (Normal temperature is 557°F.) When temperature reached 550°F, the steam dumps automatically isolated. The 'K' steam dump was manually isolated. The steam dumps were re-opened when temperature went above 550°F. All other post-trip actuations occurred as expected. None of the primary safety valves or power-operated relief valves lifted. However, some of the secondary feedwater heater relief valves lifted. The licensee stated that it is not unusual for these valves to lift following a reactor trip, and the licensee plans to isolate them. The licensee also stated that these valves are not large enough to cause a problem with cooldown. There were no emergency core cooling system actuations, and none were required. An investigation to determine the exact cause of the reactor trip is in progress.

The unit is currently stable in Mode 3. The reactor coolant pumps, normal charging and letdown, and pressurizer heaters and sprays are being utilized for primary system transport, level, and pressure control. All containment parameters are normal. Secondary steam is being dumped to the condenser, and water is being supplied to the steam generators via the auxiliary feedwater pumps and startup feedwater pump. The licensee plans to secure auxiliary feedwater. Offsite power is available, and the emergency diesel generators are operable and available if needed. The licensee is in the process of re-closing the ring bus located in the switchyard to increase offsite power reliability.

The licensee notified the NRC resident inspector.


Power Reactor
Event Number: 35712
Facility: CLINTON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: RICH CHEAR
HQ OPS Officer: LEIGH TROCINE
Notification Date: 05/14/1999
Notification Time: 00:30 [ET]
Event Date: 05/13/1999
Event Time: 23:00 [CDT]
Last Update Date: 05/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
Person (Organization):
ROGER LANKSBURY (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 4 Startup 4 Startup
Event Text
DISCOVERY THAT THE LEAK RATE OF A MAIN STEAM ISOLATION VALVE IS GREATER THAN THE INBOARD LEAKAGE CONTROL SYSTEM PROVEN TREATMENT FLOW RATE

The following text is a portion of a facsimile received from the licensee:

"Clinton Power Station has identified that the Inboard Main Steam Isolation Valve (MSIV) Leakage Control System (LCS) is not calibrated to process the design MSIV leakage of 28 standard cubic feet per hour (scfh) per one main steam line. One MSIV has been identified as having a leakage rate of 22.5 scfh which is greater than the Inboard LCS proven treatment flow rate of 21.3 scfh. Currently, the engineering team is still investigating."

The licensee stated that the unit was in a 30-day technical specification limiting condition for operation as a result of this issue.

The licensee notified the NRC resident inspector.


Power Reactor
Event Number: 35713
Facility: SAN ONOFRE
Region: 4     State: CA
Unit: [] [] [3]
RX Type: [1] W-3-LP,[2] CE,[3] CE
NRC Notified By: MATT THURBURN
HQ OPS Officer: LEIGH TROCINE
Notification Date: 05/14/1999
Notification Time: 01:54 [ET]
Event Date: 05/13/1999
Event Time: 21:44 [PDT]
Last Update Date: 05/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
CHARLES CAIN (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 M/R Y 97 Power Operation 0 Hot Standby
Event Text
MANUAL REACTOR TRIP AND MANUAL INITIATION OF EMERGENCY FEEDWATER DUE TO THE LOSS OF BOTH MAIN FEEDWATER PUMPS DURING THE PERFORMANCE OF MAINTENANCE ON THE FEEDWATER CONTROL SYSTEM (Refer to event #35721 for a similar event that occurred on 05/15/99.)

At 2144 PDT on 05/13/99, both main feedwater pumps tripped for unknown reasons. Reactor operators recognized this loss, manually tripped the reactor from 97% power, and manually initiated emergency feedwater. All rods fully inserted, and all systems functioned as required. There were no engineered safety feature actuations other than the manual initiation of emergency feedwater. The main steam isolation valves remained open, none of the relief valves opened, and there was no loss of offsite power.

The reactor is currently stable in Mode 3 (Hot Standby). The reactor coolant pumps, normal charging and letdown, and pressurizer heaters and sprays are being utilized for primary system transport, level, and pressure control. All containment parameters are normal. Emergency feedwater is supplying water to the steam generators, and secondary steam is being dumped to the main condenser. Offsite power is available. The 'A' emergency diesel generator is currently out of service for planned maintenance. However, the 'B' emergency diesel generator and the crossties from the other unit are available if needed.

The cause of the loss of both feedwater pumps is under investigation. The licensee stated that maintenance personnel were performing voltage checks in the feedwater control system at the time of the event.

The licensee notified the NRC resident inspector and plans to issue a media/press release.

********** HOO NOTE: Based on plant status calls that occurred on 05/15/99 and 05/16/99, the cause of this event was determined to be a failed relay in the feedwater control system which resulted in closure of feedwater regulation valve #3FV1121 for the #2 steam generator (E088). This in turn resulted in high discharge pressure on both main feedwater pumps.