Skip to main content

Event Notification Report for May 10, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
05/09/1999 - 05/10/1999

EVENT NUMBERS
35702356973569835699

General Information or Other
Event Number: 35702
Rep Org: NC DEPT OF ENV & NAT RESOURCES
Licensee: NELLO L. TEER COMPANY
Region: 2
City:   State: NC
County: MARTIN
License #: 032-0789-1
Agreement: Y
Docket:
NRC Notified By: COX (NCDENR)
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/11/1999
Notification Time: 16:30 [ET]
Event Date: 05/10/1999
Event Time: 16:22 [EDT]
Last Update Date: 05/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
RUDOLPH BERNHARD (R2)
JOE HOLONICH (NMSS)
FRANK CONGEL (IRO)
Event Text
DAMAGED TROXLER GAUGE IN MARTIN COUNTY, NORTH CAROLINA - INCIDENT #99-07

THE NORTH CAROLINA DIVISION OF RADIATION PROTECTION (NCDRP) WAS NOTIFIED BY A NORTH CAROLINA REGISTERED CONSULTANT THAT A STATE LICENSED COMPANY (NELLO L. TEER COMPANY) HAD ONE OF THEIR TROXLER GAUGES RUN OVER BY A COMPANY TRUCK IN MARTIN COUNTY, NORTH CAROLINA. THE INITIAL INFORMATION ON THE DAMAGE WAS THAT ONLY THE GAUGE HANDLE WAS BROKEN OFF. IT WAS DETERMINED, AT THAT TIME, THAT THE INCIDENT DID NOT MEET QUALIFICATIONS FOR A 24-HOUR NOTIFICATION. SINCE THE OPERATOR HAD STORED THE GAUGE BACK IN ITS TRANSPORT CASE, THE CONSULTANT AND LICENSEE AUTHORIZED THE RETURN OF THE TRUCK AND GAUGE TO THE LICENSEE'S DURHAM, NORTH CAROLINA, FACILITY.

ON 05/10/99. A SURVEY OF THE GAUGE WITH AN IONIZATION METER WAS MADE, AND READINGS AS HIGH AS 123 mR/HR WERE MEASURED AT THE FRONT OF THE CASE. UPON OPENING THE CASE, IT WAS DISCOVERED THAT THE GAUGE HAD CONSIDERABLE DAMAGE WITH THE SOURCE ROD SEPARATED FROM THE GAUGE AND THE GAUGE IN SEVERAL PIECES. IT WAS FURTHER DETERMINED THAT THE SOURCE WAS FREE OF ANY CONTAMINATION.

THE EXPOSURE RECORD OF THE OPERATOR'S FILM BADGE SHOWED THAT HE HAD RECEIVED 60 mR (SHALLOW AND DEEP) FOR THE PERIOD STARTING 04/01/99.

THE INCIDENT IS STILL BEING INVESTIGATED BY BOTH THE LICENSEE AND THE NCDRP.

(CALL THE NRC OPERATIONS OFFICER FOR A CONTACT TELEPHONE NUMBER.)


!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 35697
Facility: NINE MILE POINT
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: BELDEN
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/10/1999
Notification Time: 15:18 [ET]
Event Date: 05/10/1999
Event Time: 13:00 [EDT]
Last Update Date: 05/26/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - DEG/UNANALYZED COND
Person (Organization):
CURTIS COWGILL (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
UNIT 1 VALVES FAILED THEIR LOCAL LEAK RATE TEST.

UNDER THE APPENDIX J PROGRAM PLAN (#NMP1-APPJ-001) SECTION III/1.8 OUTAGE TESTING REQUIREMENTS INCLUDE MAINTAINING A COMBINED TOTAL TYPE 'B' AND 'C' AS-FOUND MINIMUM PATHWAY LEAKAGE. IN ACCORDANCE WITH TECH SPEC 6.16.4, THE COMBINED LOCAL LEAK RATE TEST (TYPE 'B' & 'C' TESTS INCLUDING AIRLOCKS) ACCEPTANCE CRITERIA IS LESS THAN 0.6 La, CALCULATED IN THE MINIMUM PATHWAY BASIS, AT ALL TIMES WHEN CONTAINMENT INTEGRITY IS REQUIRED. THE VALUE OF 0.6 La FOR UNIT 1 WAS CALCULATED TO BE 388.44 SCFH. THE RESULTS OF THE TEST MEASURED 388.756 SCFH, WHICH EXCEED THE CALCULATED VALUE FOR THE COMBINED AS-FOUND TYPE 'B' AND 'C' LOCAL LEAK RATE TESTS. THIS CONDITION WOULD HAVE BEEN A TECH SPEC VIOLATION IF IDENTIFIED DURING POWER OPERATION.

THIS CONDITION WILL BE CORRECTED PRIOR TO PLANT RESTART.

THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.

* * * UPDATE 1000EDT ON 5/26/99 FROM KEN BELDEN TO S.SANDIN * * *

THE LICENSEE IS RETRACTING THIS REPORT BASED ON THE FOLLOWING:

"IT HAS SINCE BEEN DETERMINED THAT ACTUAL LEAKAGE RESULTS FROM THESE TESTS DOES NOT EXCEED 0.6La (388.44 SCFH). ACTUAL LEAKAGE HAS BEEN CALCULATED TO BE 345.086 SCFH.

"THE ORIGINAL DETERMINATION ON 5/10/99 WAS BASED ON A PROJECTION OF FINAL TYPE B AND C RESULTS PRIOR TO ACTUAL COMPLETION. RESULTS FROM APPROXIMATELY 15 LEAK RATE TESTS WHICH WERE NOT COMPLETE AT THE TIME OF THE ORIGINAL NOTIFICATION, WERE MUCH BETTER THAN EXPECTED, WHICH CAUSED A CHANGE FROM THIS CONDITION BEING REPORTABLE TO NOT REPORTABLE. [THE] ORIGINAL NOTIFICATION [IS] RESCINDED."

THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. NOTIFIED R1DO( CONTE ).


Power Reactor
Event Number: 35698
Facility: PEACH BOTTOM
Region: 1     State: PA
Unit: [2] [3] []
RX Type: [2] GE-4,[3] GE-4
NRC Notified By: KOVALCHICK
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/10/1999
Notification Time: 19:51 [ET]
Event Date: 05/10/1999
Event Time: 09:30 [EDT]
Last Update Date: 05/10/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
26.73 - FITNESS FOR DUTY
Person (Organization):
CURTIS COWGILL (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
TRACES OF A CONTROLLED SUBSTANCE FOUND IN A BATHROOM INSIDE THE PROTECTED AREA

ON 04/15/99, THREE SUSPECTED ITEMS WERE FOUND IN A BATHROOM INSIDE THE PLANT PROTECTED AREA AND WERE TURNED OVER TO PECO ENERGY CORPORATE SECURITY. AT 0930 ON 05/10/99, THE LICENSEE RECEIVED A REPORT FROM AN INDEPENDENT LABORATORY THAT INDICATED THAT, ALTHOUGH THERE WAS NO VISIBLE RESIDUE PRESENT, A GAS CHROMATOGRAPHY/MASS SPECTROMETRY DETECTED AND CONFIRMED THE PRESENCE OF A CONTROLLED SUBSTANCE. AT THE PRESENT TIME, THE SUSPECTED ITEMS HAVE NOT BEEN ASSOCIATED WITH ANY SPECIFIC INDIVIDUAL. THE LICENSEE IS CONTINUING TO INVESTIGATE THIS SITUATION.

THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.


Power Reactor
Event Number: 35699
Facility: RIVER BEND
Region: 4     State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: CARLSON
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 05/10/1999
Notification Time: 21:34 [ET]
Event Date: 05/10/1999
Event Time: 16:58 [CDT]
Last Update Date: 05/10/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
CHARLES CAIN (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Refueling 0 Refueling
Event Text
DIV 1 EDG INITIATION AND RHR LPCI "A" & LPCS INJECTION INTO THE RPV DUE TO AN INVALID SIGNAL

WITH THE PLANT IN OPERATIONAL CONDITION 5 IN A REFUELING OUTAGE, THE START OF THE DIVISION 1 EMERGENCY DIESEL GENERATOR (EDG) AND INJECTION INTO THE REACTOR PRESSURE VESSEL (RPV) VIA THE RESIDUAL HEAT REMOVAL (RHR) LOW PRESSURE COOLANT INJECTION (LPCI) "A" AND LOW PRESSURE CORE SPRAY (LPCS) SYSTEMS OCCURRED DUE TO AN INVALID EMERGENCY CORE COOLING SYSTEM INITIATION SIGNAL.

THE CAUSE OF THE INITIATION SIGNAL WAS A FAILED ROSEMONT TRIP UNIT (#B21-N671A), WHICH WAS NEWLY INSTALLED AND PLACED INTO SERVICE DURING THE PRESENT REFUELING OUTAGE IN
RESPONSE TO THE SAFETY/RELIEF VALVE LOGIC SMART FIRE ISSUE. WHEN THE TRIP UNIT FAILED, IT AFFECTED POWER TO THE DIVISION 1 INSTRUMENT RACK RESULTING IN THE GENERATION OF AN INVALID RPV LEVEL 1 INITIATION SIGNAL CAUSING THE ESF ACTUATIONS. PLANT OPERATORS VERIFIED THE REACTOR CAVITY LEVEL AND IMMEDIATELY OVERRODE THE OPEN INJECTION VALVE SIGNAL TO STOP THE INJECTION. APPROXIMATELY TWO INCHES OF WATER HAD BEEN ADDED TO THE REACTOR CAVITY LEVEL FROM THE SUPPRESSION POOL. THE EDG DID NOT LOAD AND WAS SECURED AFTER APPROXIMATELY TWO HOURS.

WHEN THE OPEN LPCS INJECTION VALVE SIGNAL WAS OVERRIDDEN, THE SYSTEM MINIMUM FLOW VALVE DID NOT REOPEN AND CONTROL ROOM OPERATORS OPENED THE MINIMUM FLOW VALVE TO PROVIDE LPCS PUMP PROTECTION. ALSO, THE RHR "A" INJECTION CHECK VALVE WAS STILL INDICATING OPEN (UNCLEAR IF THIS IS AN INDICATION PROBLEM OR A STUCK OPEN VALVE PROBLEM) AFTER THE INJECTION VALVE HAD BEEN SHUT. THE LICENSEE IS INVESTIGATING BOTH OF THESE CONDITIONS.

THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.