Skip to main content

Event Notification Report for April 30, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
04/29/1999 - 04/30/1999

EVENT NUMBERS
3565735658356603566135662

!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 35657
Facility: BRUNSWICK
Region: 2     State: NC
Unit: [] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: JOHN REINSBURROW
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 04/30/1999
Notification Time: 08:22 [ET]
Event Date: 04/30/1999
Event Time: 04:44 [EDT]
Last Update Date: 05/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - RPS ACTUATION
Person (Organization):
AL BELISLE (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 A/R N 0 Refueling 0 Refueling
Event Text
- ONE CONTROL ROD INSERTED INTO THE REACTOR VESSEL WITH THE FUEL OFF LOADED -

While all fuel was removed from the Brunswick Unit 2 reactor vessel for a scheduled refueling outage, an inadvertent reactor protection system actuation resulted in the insertion of one control rod (#50-31). The invalid scram signal was due to maintenance already underway on the "2A" DC switchboard (removed from service under clearance, half scram signal present on RPS "A" channel due to de-energization of reactor protection system instrumentation) and an inadvertent high level trip of average power range monitor B due to working on local power range monitoring instrumentation underneath the reactor vessel (half scram signal on the RPS "B" channel). The one control rod which moved had been withdrawn in preparation (or placing it under clearance) for control rod drive replacement. Seven other control rods were completely withdrawn and under clearance to support inspection work inside the reactor vessel. These rods did not move during this event due to being under clearance. This event has no safety significance. There was no fuel inside the reactor vessel at the time of this event.

The licensee informed the NRC Resident Inspector.

* * * UPDATE 1200EDT 5/17/99 FROM STEVE TABOR TO S. SANDIN * * *

The licensee is retracting this report based on the following:

"This event does not meet this reporting criterion in that the actuation signal resulting in the actuation of the RPS was invalid, and the safety function of RPS had already been completed at the time of the occurrence. In accordance with the technical specification, the RPS was not required to be operable based on the condition of the plant at the time of the occurrence. With the core defueled, the insertion of control rods no longer adds negative reactivity, and therefore, the safety function of RPS had already been completed prior to the occurrence.

"The above discussion also applies to the 10 CFR 50.73 reporting requirements.

"Based on the above analysis, the red phone report (Event Number 35657) was retracted by Steve Tabor on May 17, 1999, at 12:00 EDT. The NRC contact was Steve Sandin."

Notified R2DO(Bernhard).


Power Reactor
Event Number: 35658
Facility: COOK
Region: 3     State: MI
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CHUCK SMITH
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 04/30/1999
Notification Time: 09:56 [ET]
Event Date: 04/30/1999
Event Time: 09:10 [EDT]
Last Update Date: 05/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
JOHN MADERA (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Cold Shutdown 0 Cold Shutdown
2 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
- PLANT SECURITY REPORT -

A VULNERABILITY TO UNAUTHORIZED/UNDETECTED ENTRY INTO A PLANT VITAL AREA WAS DISCOVERED. COMPENSATORY MEASURES WERE IMMEDIATELY TAKEN UPON DISCOVERY. (CONTACT THE HOO FOR ADDITIONAL DETAILS.)

THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.

***UPDATE ON 05/14/99 AT 1326 EST FROM HERB TORBERG TAKEN BY MACKINNON***

This follow-up report is due to the ongoing Restart Readiness Assessment Program walkdown of vital area barriers. Another vulnerability to unauthorized/undetected entry into a plant vital area was discovered. Compensatory measures were immediately taken upon discovery. (Contact the HOO for more details.)

The licensee notified the NRC Resident Inspector. The R3DO (Roger Lanksbury) was notified by the NRC operations officer.


Power Reactor
Event Number: 35660
Facility: BRUNSWICK
Region: 2     State: NC
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: MARK SCHALL
HQ OPS Officer: BOB STRANSKY
Notification Date: 04/30/1999
Notification Time: 14:28 [ET]
Event Date: 04/30/1999
Event Time: 13:32 [EDT]
Last Update Date: 04/30/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(v) - EMERGENCY SIREN INOP
Person (Organization):
AL BELISLE (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N N 0 Refueling 0 Refueling
Event Text
TEN EMERGENCY SIRENS INOPERABLE

"On 4/30/99 at 1332, Brunswick experienced a loss of power to ten offsite sirens. Eight of the sirens are in Brunswick County and the other two are located in the Carolina Beach area of New Hanover County. The site experienced winds in excess of 50 mph when the sirens were determined to be lost.

"The function of the offsite siren system is to provide early warning to the public in the event of an accident. Emergency Management personnel of the affected counties have been notified to perform backup route alerting communication for these areas as necessary. Based on this interim measure, the safety significance is considered minimal.

"Repairs are currently in progress. Transmission crews are on the scene in the Carolina Beach area. The two sirens in Carolina Beach have been repaired."

The NRC resident inspector has been informed of this notification by the licensee.


Power Reactor
Event Number: 35661
Facility: NINE MILE POINT
Region: 1     State: NY
Unit: [1] [2] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: KEVIN BELDIN
HQ OPS Officer: DOUG WEAVER
Notification Date: 04/30/1999
Notification Time: 15:04 [ET]
Event Date: 04/30/1999
Event Time: 14:20 [EDT]
Last Update Date: 04/30/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(v) - OTHER ASMT/COMM INOP
Person (Organization):
CLIFFORD ANDERSON (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Refueling 0 Refueling
2 N N 0 Cold Shutdown 0 Cold Shutdown
Event Text
LOSS OF COMMUNICATIONS AT EMERGENCY OPERATIONS FACILITY AND JOINT NEWS CENTER

A fiber optic phone cable has been cut offsite that defeats the ability of the normal phone system for the Emergency Operations Facility (EOF) and Joint News Center. Additionally, the Radiological Emergency Communications System for county and state communications has been lost to the EOF. As a backup, cell phones and the normal offsite radio network facility have been tested to the EOF. Additionally, the site pager system can be used to contact Emergency Planning personnel to initiate communications. The repair is estimated to take 8 hours.

The licensee will notify the NRC resident inspector.


Power Reactor
Event Number: 35662
Facility: FITZPATRICK
Region: 1     State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ART ZAREMBA
HQ OPS Officer: DOUG WEAVER
Notification Date: 04/30/1999
Notification Time: 15:14 [ET]
Event Date: 04/30/1999
Event Time: 14:20 [EDT]
Last Update Date: 04/30/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(v) - OTHER ASMT/COMM INOP
Person (Organization):
CLIFFORD ANDERSON (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
LOSS OF COMMUNICATIONS AT THE EMERGENCY OPERATIONS FACILITY AND JOINT NEWS CENTER

A fiber optic phone cable has been cut offsite that defeats the ability of the normal phone system for the Emergency Operations Facility (EOF) and Joint News Center. Additionally, the Radiological Emergency Communications System for county and state communications has been lost to the EOF. As a backup, cell phones and the normal offsite radio network facility have been tested to the EOF. Additionally, the site pager system can be used to contact Emergency Planning personnel to initiate communications. The repair is estimated to take eight hours.

The licensee will notify the NRC resident inspector.