Event Notification Report for April 15, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
04/14/1999 - 04/15/1999
Power Reactor
Event Number: 35595
Facility: BRAIDWOOD
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DAN ACKERMAN
HQ OPS Officer: LEIGH TROCINE
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DAN ACKERMAN
HQ OPS Officer: LEIGH TROCINE
Notification Date: 04/15/1999
Notification Time: 14:47 [ET]
Event Date: 04/15/1999
Event Time: 13:01 [CDT]
Last Update Date: 04/15/1999
Notification Time: 14:47 [ET]
Event Date: 04/15/1999
Event Time: 13:01 [CDT]
Last Update Date: 04/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
JOHN JACOBSON (R3)
JOHN JACOBSON (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 12 | Power Operation | 0 | Hot Standby |
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN DUE TO A CONTROL BANK OVERLAP PROBLEM DURING UNIT 2 RESTART
The following text is a portion of a facsimile received from the licensee:
"[At 1301 CDT on 04/15/99, the] Unit 2 reactor was shut down from 12% power due to control bank overlap not meeting the requirements of Technical Specification 3.1.6. Unit 2 was in the process of starting up after a trip on 04/14/99 due to a generator problem." (Refer to event #35592 for additional information.)
The licensee stated that all systems functioned as required and that there was nothing unusual or not understood about this event. The estimated restart date is currently unknown.
The licensee notified the NRC Resident Inspector.
The following text is a portion of a facsimile received from the licensee:
"[At 1301 CDT on 04/15/99, the] Unit 2 reactor was shut down from 12% power due to control bank overlap not meeting the requirements of Technical Specification 3.1.6. Unit 2 was in the process of starting up after a trip on 04/14/99 due to a generator problem." (Refer to event #35592 for additional information.)
The licensee stated that all systems functioned as required and that there was nothing unusual or not understood about this event. The estimated restart date is currently unknown.
The licensee notified the NRC Resident Inspector.
Power Reactor
Event Number: 35596
Facility: SEQUOYAH
Region: 2 State: TN
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: PAUL SIMMONS
HQ OPS Officer: LEIGH TROCINE
Region: 2 State: TN
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: PAUL SIMMONS
HQ OPS Officer: LEIGH TROCINE
Notification Date: 04/15/1999
Notification Time: 20:04 [ET]
Event Date: 04/15/1999
Event Time: 16:19 [EDT]
Last Update Date: 04/15/1999
Notification Time: 20:04 [ET]
Event Date: 04/15/1999
Event Time: 16:19 [EDT]
Last Update Date: 04/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
PIERCE SKINNER (R2)
PIERCE SKINNER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
MANUAL STARTING OF THE STANDBY HIGH-HEAD CENTRIFUGAL CHARGING PUMP (CCP) DUE TO FAILURE OF OPERATING PUMP
The following text is a portion of a facsimile received from the licensee:
"[At approximately] 1619 on 04/15/99, the in-service 1B-B CCP was stopped after water was identified spraying from the outboard seal. The leak stopped when the pump was stopped. [The main control room unit operator] had observed increasing amps with decreasing charging flow indicating that the 1B-B CCP was not functioning [normally]. The 1A-A CCP was placed in service to maintain [pressurizer] level in the normal operating range and [to] prevent [pressurizer] level from decreasing to the letdown isolation/[pressurizer] heater lockout setpoint which could ultimately [have] lead to a [reactor] trip [and possibly a safety injection] on low [pressurizer] pressure."
The licensee stated that there were no unusual occurrences that were not understood and that the 1A-A CCP has functioned correctly. The licensee also stated that the unit entered three 72-hour technical specification limiting conditions for operation as a result of this event. These LCOs were entered at 1619 EDT.
The licensee reported that this event involved a manual actuation of an engineered safety feature component (1A-A CCP) in response to actual plant conditions and that this was not a system functional failure.
The licensee plans to notify the NRC Resident Inspector.
The following text is a portion of a facsimile received from the licensee:
"[At approximately] 1619 on 04/15/99, the in-service 1B-B CCP was stopped after water was identified spraying from the outboard seal. The leak stopped when the pump was stopped. [The main control room unit operator] had observed increasing amps with decreasing charging flow indicating that the 1B-B CCP was not functioning [normally]. The 1A-A CCP was placed in service to maintain [pressurizer] level in the normal operating range and [to] prevent [pressurizer] level from decreasing to the letdown isolation/[pressurizer] heater lockout setpoint which could ultimately [have] lead to a [reactor] trip [and possibly a safety injection] on low [pressurizer] pressure."
The licensee stated that there were no unusual occurrences that were not understood and that the 1A-A CCP has functioned correctly. The licensee also stated that the unit entered three 72-hour technical specification limiting conditions for operation as a result of this event. These LCOs were entered at 1619 EDT.
The licensee reported that this event involved a manual actuation of an engineered safety feature component (1A-A CCP) in response to actual plant conditions and that this was not a system functional failure.
The licensee plans to notify the NRC Resident Inspector.