Fuel Cycle Facility
Event Number: 35516
Facility: PORTSMOUTH GASEOUS DIFFUSION PLANT
Region: 3 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: KEITH VANDERPOOL
HQ OPS Officer: FANGIE JONES
Region: 3 State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: KEITH VANDERPOOL
HQ OPS Officer: FANGIE JONES
Notification Date: 03/26/1999
Notification Time: 16:08 [ET]
Event Date: 03/26/1999
Event Time: 09:56 [EST]
Last Update Date: 03/26/1999
Notification Time: 16:08 [ET]
Event Date: 03/26/1999
Event Time: 09:56 [EST]
Last Update Date: 03/26/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
MELVYN LEACH (R3)
DON COOL (NMSS)
MELVYN LEACH (R3)
DON COOL (NMSS)
NRC BULLETIN 91-01, 24 HOUR REPORT
On March 25, 1999 at 0958, during a building NCS self assessment, an NCS Engineer discovered that a Nuclear
Criticality Safety Approval (NCSA) requirement was not being maintained in the X-330 ACR 2 Small Diameter
Container Storage Area. NCSA-Plant025.A00 requirement #11 states that, "A minimum spacing of 23 inches center-to-center shall be maintained between small diameter containers within a storage area." An F-can and GP can were discovered to be spaced 22" center-to-center, in violation of this requirement.
All other controls were maintained during this event. The spacing control was restored under direction of the NCS staff.
The facility personnel notified the NRC Resident Inspector and the DOE site representative.
On March 25, 1999 at 0958, during a building NCS self assessment, an NCS Engineer discovered that a Nuclear
Criticality Safety Approval (NCSA) requirement was not being maintained in the X-330 ACR 2 Small Diameter
Container Storage Area. NCSA-Plant025.A00 requirement #11 states that, "A minimum spacing of 23 inches center-to-center shall be maintained between small diameter containers within a storage area." An F-can and GP can were discovered to be spaced 22" center-to-center, in violation of this requirement.
All other controls were maintained during this event. The spacing control was restored under direction of the NCS staff.
The facility personnel notified the NRC Resident Inspector and the DOE site representative.
General Information or Other
Event Number: 35524
Rep Org: COGEMA MINING, INC.
Licensee: COGEMA MINING, INC.
Region: 4
City: Linch State: WY
County: Campbell
License #:
Agreement: N
Docket:
NRC Notified By: JOHN VASELIN
HQ OPS Officer: JOHN MacKINNON
Licensee: COGEMA MINING, INC.
Region: 4
City: Linch State: WY
County: Campbell
License #:
Agreement: N
Docket:
NRC Notified By: JOHN VASELIN
HQ OPS Officer: JOHN MacKINNON
Notification Date: 03/29/1999
Notification Time: 16:15 [ET]
Event Date: 03/26/1999
Event Time: 12:00 [MST]
Last Update Date: 03/29/1999
Notification Time: 16:15 [ET]
Event Date: 03/26/1999
Event Time: 12:00 [MST]
Last Update Date: 03/29/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
LINDA HOWELL (R4)
SCOTT MOORE (NMSS)
JOE HOLONICH (NMSS)
JOHN MORRIS (DOE)
M. ROBERTSON, NRC (EPA)
LINDA HOWELL (R4)
SCOTT MOORE (NMSS)
JOE HOLONICH (NMSS)
JOHN MORRIS (DOE)
M. ROBERTSON, NRC (EPA)
SPILLED 60,918 GALLONS OF WATER CONTAINING 1.0 mg/l OF URANIUM ON 03/26/99 AND SPILLED 23,520 GALLONS OF WATER CONTAINING LESS THAN 0.4 mg/l OF URANIUM ON 03/29/99
This event was called in under as a 48 hour report per Cogema Mining, Inc., license.
Two spills of injection mining solution recently occurred at the Christensen Mine in Campbell County Wyoming. Both spills were located in Mine Unit 3 which is currently in restoration and resulted from plumbing failures. The following data summarizes the spills:
Date Location Estimated Uranium
Gallons mg/l
03/26/99 Well H17-1 60,918 1.0
03/29/99 Module bldg 3-1 23,520 <0.4
For purposes of reporting spills, the NRC license considers any spill or 10,000 gallons of more to be significant from an operations standpoint, regardless of the chemical and radioactive characteristics of the spill. Therefore, both spills are reported.
Health and Environmental Hazards: None expected. The solution does not pose a health or environmental hazard and did not leave the NRC permitted area. Note that the nearest community is Linch, Wyoming, approximately 15 miles to the southwest.
Corrective Actions: Well H17-1: Well was shut down until the plumbing failure can be repaired.
Available spill solution is being recovered.
Module building 3-1: The plumbing failure was repaired and flow is back on line.
Soil samples have been collected at both spill locations and will be analyzed for Ra-226 to determine if soil clean-up is needed.
Written Notification: A written notification giving further details will be submitted to the NRC Uranium Recovery Branch Chief within 7 days.
This event was called in under as a 48 hour report per Cogema Mining, Inc., license.
Two spills of injection mining solution recently occurred at the Christensen Mine in Campbell County Wyoming. Both spills were located in Mine Unit 3 which is currently in restoration and resulted from plumbing failures. The following data summarizes the spills:
Date Location Estimated Uranium
Gallons mg/l
03/26/99 Well H17-1 60,918 1.0
03/29/99 Module bldg 3-1 23,520 <0.4
For purposes of reporting spills, the NRC license considers any spill or 10,000 gallons of more to be significant from an operations standpoint, regardless of the chemical and radioactive characteristics of the spill. Therefore, both spills are reported.
Health and Environmental Hazards: None expected. The solution does not pose a health or environmental hazard and did not leave the NRC permitted area. Note that the nearest community is Linch, Wyoming, approximately 15 miles to the southwest.
Corrective Actions: Well H17-1: Well was shut down until the plumbing failure can be repaired.
Available spill solution is being recovered.
Module building 3-1: The plumbing failure was repaired and flow is back on line.
Soil samples have been collected at both spill locations and will be analyzed for Ra-226 to determine if soil clean-up is needed.