Skip to main content

Event Notification Report for February 20, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/19/1999 - 02/20/1999

EVENT NUMBERS
353903538635388

Power Reactor
Event Number: 35390
Facility: SEABROOK
Region: 1     State: NH
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: STEVE MORRISSEY
HQ OPS Officer: JOHN MacKINNON
Notification Date: 02/21/1999
Notification Time: 11:28 [ET]
Event Date: 02/20/1999
Event Time: 21:00 [EST]
Last Update Date: 02/23/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
JIM TRAPP (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
DISCOVERY OF ELEVEN DEAD SEA DUCKS IN CIRCULATING WATER SCREEN WASH DEBRIS

Eleven dead sea ducks were observed in Seabrook Station's circulating water screen wash debris on February 20, 1999, at approximately 2100 hours. It is not known at this time whether the ducks were alive or dead upon entering the offshore intake structure. Sea ducks are diving birds which feed underwater. This is a 24-hour notification in accordance with Section 4.1 of the Environmental Protection Plan, Appendix B of the operating license.

The NRC resident inspector was notified of this event report by the licensee.

* * * UPDATE AT 1407 EST ON 02/22/99 FROM STEVE MORRISSEY TO FANGIE JONES * * *

Two additional dead sea ducks were observed in Seabrook Station's circulating water screen wash debris on February 21, 1999, at approximately 2245 hours. The licensee believes these additional dead sea ducks are part of the original group and were not picked up on the screen wash of the night of February 20, 1999.

The licensee notified the NRC resident inspector. The NRC operations officer notified the R1DO (Richard Barkley).

* * * UPDATE AT 1402 ON 02/23/99 FROM STEVE MORRISSEY TO JOLLIFFE * * *

Three additional dead sea ducks were observed in Seabrook Station's circulating water screen wash debris on February 23, 1999, at approximately 0100 hours. The licensee believes that these additional dead sea ducks are part of the original group and were not picked up on the screen wash on February 21, 1999.

The licensee notified the NRC resident inspector. The NRC operations officer notified the R1DO (Richard Barkley).


Power Reactor
Event Number: 35386
Facility: DRESDEN
Region: 3     State: IL
Unit: [] [] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: SALGADO
HQ OPS Officer: JOHN MacKINNON
Notification Date: 02/20/1999
Notification Time: 06:02 [ET]
Event Date: 02/20/1999
Event Time: 04:14 [CST]
Last Update Date: 02/20/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
MIKE JORDAN (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
3 A N 0 Cold Shutdown 0 Cold Shutdown
Event Text
A FULL REACTOR SCRAM OCCURRED DURING RESTORATION LINEUP AFTER A HYDROSTATIC TEST

Unit 3 experienced a full reactor scram (no rod motion), group 2 (Reactor Water Cleanup, drywell atmosphere) isolation and group 3 (shutdown cooling) isolation while in mode 4 (cold shutdown). Actual reactor vessel water level was plus 32 inches (scram/isolation setpoint is approximately plus 15 inches). This event occurred during the restoration from the hydrostatic test lineup (probably a pressure spike on a instrument line during the restoration lineup caused this event). Shutdown cooling was lost for approximately 10 minutes. There was no discernable rise in reactor vessel water temperature during the time period shutdown cooling was inoperable. The licensee is investigating the cause of the reactor scram and the group isolations.

The NRC resident inspector will be informed of this event by the licensee.


Power Reactor
Event Number: 35388
Facility: PALO VERDE
Region: 4     State: AZ
Unit: [1] [2] [3]
RX Type: [1] CE,[2] CE,[3] CE
NRC Notified By: DANN R. DAILEY
HQ OPS Officer: JOHN MacKINNON
Notification Date: 02/20/1999
Notification Time: 10:30 [ET]
Event Date: 02/20/1999
Event Time: 06:48 [MST]
Last Update Date: 02/20/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(v) - EMERGENCY SIREN INOP
Person (Organization):
LAWRENCE YANDELL (R4)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation
Event Text
THE OFFSITE EMERGENCY SIREN SYSTEM SILENT AND BACKUP TEST FAILED.

On 02/20/99 at approximately 0648 MST, Palo Verde was notified by the Maricopa County Sheriff's Office (MCSO) of a failure of the Offsite Siren System in the Emergency Planning Zone. The discovery was during a scheduled silent test of the sirens by MCSO personnel. At approximately 0720 MST, the Department of Public Safety performed a back-up test of the Offsite Siren System that also failed. Emergency Planning personnel have been notified and are responding to correct the problem. Investigation of the above problem is in progress.

The NRC resident inspector was notified of this event by the licensee.


***Update by Dann R. Dailey on 02/20/99 at 1034 EST taken by MacKinnon***

The Offsite Siren System was successfully tested and returned to service at 0820 MST. R4DO (Larry Yandell) notified.

The NRC resident inspector will be notified of this update by the licensee.


**** UPDATE ON 2/20/99 @ 1428 BY MARKS TO GOULD ***

ALL 39 SIRENS WERE RETURNED TO SERVICE AT 0820 MST. CAUSE OF FAILURE WAS DUE TO PERSONNEL ERROR. A TEST TONE WAS INADVERTENTLY LEFT ON THE PHONE LINE AND IT INTERFERED WITH THE ABILITY TO ACTIVATE THE OFF-SITE SIRENS.

THE RESIDENT INSPECTOR WAS NOTIFIED. THE REG 4 RDO(YANDELL) WAS INFORMED.