Event Notification Report for February 17, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
02/16/1999 - 02/17/1999
EVENT NUMBERS
35385353773537835379353803538135373353743537535560
General Information or Other
Event Number: 35385
Rep Org: COGEMA MINING INC.
Licensee: COGEMA MINING INC.
Region: 4
City: LINCH State: WY
County: CAMPBELL
License #: SUA-1341
Agreement: N
Docket:
NRC Notified By: VASELIN (RSO)
HQ OPS Officer: CHAUNCEY GOULD
Licensee: COGEMA MINING INC.
Region: 4
City: LINCH State: WY
County: CAMPBELL
License #: SUA-1341
Agreement: N
Docket:
NRC Notified By: VASELIN (RSO)
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 02/19/1999
Notification Time: 17:07 [ET]
Event Date: 02/17/1999
Event Time: 12:00 [MST]
Last Update Date: 02/19/1999
Notification Time: 17:07 [ET]
Event Date: 02/17/1999
Event Time: 12:00 [MST]
Last Update Date: 02/19/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
LAWRENCE YANDELL (R4)
CHARLEY HAUGHNEY (NMSS)
JOE HOLONICH (NMSS)
LAWRENCE YANDELL (R4)
CHARLEY HAUGHNEY (NMSS)
JOE HOLONICH (NMSS)
MONITOR WELL PLACED ON EXCURSION STATUS
A ROUTINE BI-WEEKLY WATER SAMPLE COLLECTED ON 02/17/99 FROM MONITOR WELL "6MW40", EXCEEDED ALL 3 OF ITS UPPER CONTROL LIMITS UCLs. A CONFIRMATION SAMPLE WAS COLLECTED 2/19/99, WHICH ALSO EXCEEDED ALL 3 UCLs. MONITOR WELL "6MW40" WAS THEN PLACED ON EXCURSION STATUS AS PER LICENSE SECTION 11.2 AND ITS SAMPLING FREQUENCY INCREASED TO WEEKLY. "6MW40" IS A PERIMETER ORE ZONE MONITOR WELL LOCATED APPROXIMATELY 180 FEET (MAX. CAN BE 300 FT) EAST OF THE MINE UNIT 6 BOUNDARY AT THE CHRISTENSEN MINE, CAMPBELL COUNTY, WYOMING. THE NEAREST COMMUNITY IS LINCH, WYOMING, APPROXIMATELY 15 MILES TO THE SOUTHEAST.
ANALYSIS DATA:
DATE CHLORIDE mg/l CONDUCTIVITY µmhos/cm² ALKALINITY mg/l URANIUM mg/l U3O8
SAMPLED UCL 20.0 UCL 1576 UCL 95.2 NO UCL
----------------------------------------------------------------------------------------------------------------------------------------------------
2/17/99 39.2 1861 386.2 <0.4
2/19/99 25.9 1660 260.8 <0.4
THERE ARE NO HEALTH OR ENVIRONMENTAL HAZARDS FROM THE RESULTS OF THIS EXCURSION.
CORRECTIVE ACTION: OVER-RECOVERY PUMPING OF 50 GPM HAS BEGUN IN THE WELLFIELD AREA NEAREST MONITOR WELL "6MW40".
A WRITTEN NOTIFICATION WILL BE SUBMITTED TO NRC URANIUM RECOVERY BRANCH WITHIN 7 DAYS.
HOO NOTE: SEE EVENT #35190
A ROUTINE BI-WEEKLY WATER SAMPLE COLLECTED ON 02/17/99 FROM MONITOR WELL "6MW40", EXCEEDED ALL 3 OF ITS UPPER CONTROL LIMITS UCLs. A CONFIRMATION SAMPLE WAS COLLECTED 2/19/99, WHICH ALSO EXCEEDED ALL 3 UCLs. MONITOR WELL "6MW40" WAS THEN PLACED ON EXCURSION STATUS AS PER LICENSE SECTION 11.2 AND ITS SAMPLING FREQUENCY INCREASED TO WEEKLY. "6MW40" IS A PERIMETER ORE ZONE MONITOR WELL LOCATED APPROXIMATELY 180 FEET (MAX. CAN BE 300 FT) EAST OF THE MINE UNIT 6 BOUNDARY AT THE CHRISTENSEN MINE, CAMPBELL COUNTY, WYOMING. THE NEAREST COMMUNITY IS LINCH, WYOMING, APPROXIMATELY 15 MILES TO THE SOUTHEAST.
ANALYSIS DATA:
DATE CHLORIDE mg/l CONDUCTIVITY µmhos/cm² ALKALINITY mg/l URANIUM mg/l U3O8
SAMPLED UCL 20.0 UCL 1576 UCL 95.2 NO UCL
----------------------------------------------------------------------------------------------------------------------------------------------------
2/17/99 39.2 1861 386.2 <0.4
2/19/99 25.9 1660 260.8 <0.4
THERE ARE NO HEALTH OR ENVIRONMENTAL HAZARDS FROM THE RESULTS OF THIS EXCURSION.
CORRECTIVE ACTION: OVER-RECOVERY PUMPING OF 50 GPM HAS BEGUN IN THE WELLFIELD AREA NEAREST MONITOR WELL "6MW40".
A WRITTEN NOTIFICATION WILL BE SUBMITTED TO NRC URANIUM RECOVERY BRANCH WITHIN 7 DAYS.
HOO NOTE: SEE EVENT #35190
Fuel Cycle Facility
Event Number: 35377
Facility: PADUCAH GASEOUS DIFFUSION PLANT
Region: 3 State: KY
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: BILL HALICKS
HQ OPS Officer: DICK JOLLIFFE
Region: 3 State: KY
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: BILL HALICKS
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 02/17/1999
Notification Time: 11:22 [ET]
Event Date: 02/17/1999
Event Time: 09:52 [CST]
Last Update Date: 02/17/1999
Notification Time: 11:22 [ET]
Event Date: 02/17/1999
Event Time: 09:52 [CST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
MIKE JORDAN (R3)
SCOTT MOORE, NMSS (EO)
MIKE JORDAN (R3)
SCOTT MOORE, NMSS (EO)
- UF6 CYLINDER RECEIVED WITH REMOVABLE RADIOACTIVE SURFACE CONTAMINATION -
AT 0952 CST ON 02/17/99, PADUCAH RECEIVED AN EMPTY UF6 CYLINDER ON THE BACK OF A FLAT BED TRUCK FROM STARMET CMI, BARNWELL, SC. THE CARRIER WAS RSB LOGISTICS, ST LOUIS, MO. THE SURFACE OF THE CYLINDER WAS SURVEYED UPON RECEIPT AND CONTAMINATION LEVELS WERE 2,379 DPM PER 100 SQUARE CM BETA/GAMMA REMOVABLE RADIOACTIVE SURFACE CONTAMINATION. (THE MAXIMUM ACCEPTABLE LIMIT OF 10CFR71.87(i) IS 2,200.) THE SURVEY RESULTS OF THE TRUCK WERE LESS THAN THE MINIMUM DETECTABLE ACTIVITY. THE LICENSEE PLACED THE CYLINDER IN A RADIOLOGICALLY CONTROLLED AREA AND PLANS TO DECONTAMINATE IT.
PADUCAH PERSONNEL NOTIFIED THE NRC REGION 3 IN ACCORDANCE WITH THE REQUIREMENTS OF 10CFR20.1906(d)(1) AS A 1-HOUR EVENT NOTIFICATION REPORT. PADUCAH PERSONNEL ALSO NOTIFIED THE NRC RESIDENT INSPECTOR..
AT 0952 CST ON 02/17/99, PADUCAH RECEIVED AN EMPTY UF6 CYLINDER ON THE BACK OF A FLAT BED TRUCK FROM STARMET CMI, BARNWELL, SC. THE CARRIER WAS RSB LOGISTICS, ST LOUIS, MO. THE SURFACE OF THE CYLINDER WAS SURVEYED UPON RECEIPT AND CONTAMINATION LEVELS WERE 2,379 DPM PER 100 SQUARE CM BETA/GAMMA REMOVABLE RADIOACTIVE SURFACE CONTAMINATION. (THE MAXIMUM ACCEPTABLE LIMIT OF 10CFR71.87(i) IS 2,200.) THE SURVEY RESULTS OF THE TRUCK WERE LESS THAN THE MINIMUM DETECTABLE ACTIVITY. THE LICENSEE PLACED THE CYLINDER IN A RADIOLOGICALLY CONTROLLED AREA AND PLANS TO DECONTAMINATE IT.
PADUCAH PERSONNEL NOTIFIED THE NRC REGION 3 IN ACCORDANCE WITH THE REQUIREMENTS OF 10CFR20.1906(d)(1) AS A 1-HOUR EVENT NOTIFICATION REPORT. PADUCAH PERSONNEL ALSO NOTIFIED THE NRC RESIDENT INSPECTOR..
Power Reactor
Event Number: 35378
Facility: HARRIS
Region: 2 State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: MARK PALMER
HQ OPS Officer: LEIGH TROCINE
Region: 2 State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: MARK PALMER
HQ OPS Officer: LEIGH TROCINE
Notification Date: 02/17/1999
Notification Time: 13:05 [ET]
Event Date: 02/17/1999
Event Time: 12:19 [EST]
Last Update Date: 02/19/1999
Notification Time: 13:05 [ET]
Event Date: 02/17/1999
Event Time: 12:19 [EST]
Last Update Date: 02/19/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
ANN BOLAND (R2)
ANN BOLAND (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 7 | Power Operation |
TECHNICAL SPECIFICATION REQUIRED PLANT SHUTDOWN DUE TO FAILURE OF THE 'A' REACTOR TRIP BREAKER TO CLOSE RELIABLY DURING TESTING
The following text is a portion of a facsimile received from the licensee:
"During [technical specification] surveillance testing [with the unit] at 100% power, a testing failure occurred on the train 'A' reactor trip breaker. The test in progress was MST-I001, Train 'A' Solid State Protection System Actuation Logic and Master Relay Test. During this test, the 'A' reactor trip breaker failed to close with the test pushbutton. The following timeline occurred:"
"0821- [The] train 'A' reactor trip bypass breaker [was racked in and closed]. This began a 2-hour time
limit allowed for surveillance testing.
0916 - Reactor trip breaker 'A' failed to close with the test pushbutton. At this point, the 2-hour limit for
surveillance testing ended, and [Technical Specification] 3.3.1, action 8, was entered. This action
required the plant to be in Mode 3 within 6 hours. The time to enter Mode 3 is 1516.
1026 - NRC Region II representative, George MacDonald, [was] notified of [limiting condition for operation]
and necessity to be in Mode 3 by 1516. Mr. MacDonald was notified because [the] Harris resident
inspectors are out of town.
1219 - [A generator] load reduction for plant shutdown [was commenced]. Maintenance and engineering
personnel are investigating the problem."
The licensee emphasized that the train 'A' reactor trip breaker did not fail to open, which is its safety function. The breaker only failed to re-close. It has since been opened and re-closed several times during ongoing troubleshooting activities. The licensee currently believes that the failure of the breaker to re-close reliably may be the result of a possible problem with the test circuitry allowing the test signal to stay in.
Although all of the emergency diesel generators and emergency core cooling systems are operable and available if needed, the licensee stated that the emergency response data system is not available due to a Y2K problem. (The Y2K problem is not related to the breaker problem.)
*** UPDATE ON 2/19/99 @ 1356 BY FLEMING TO GOULD ***
THE PLANT EXITED TS 3.3.1 ACTION 8 AT 1452 ON 2/17/99 WHILE AT 7% POWER. THE UNIT DID NOT DROP FROM THE GRID OR ENTER MODE 3 PRIOR TO DECLARING THE "A" REACTOR TRIP BREAKER OPERABLE AND IN-SERVICE WITH ITS BYPASS BREAKER OPEN. AFTER EXITING THE LCO, POWER LEVEL WAS INCREASED AND THE REACTOR IS CURRENTLY AT 100% POWER.
THE ORIGINAL REPORT STATED THAT "ERDS NOT AVAILABLE DUE TO Y2K PROBLEM." A SUBSEQUENT INVESTIGATION HAS REVEALED THAT ERDS REMAINED AVAILABLE IMMEDIATELY PRIOR TO AND DURING THE REPORTED EVENT. CONTROL ROOM STAFF WAS UNDER A MISTAKEN IMPRESSION THAT THE ERDS LINK WAS UNAVAILABLE DUE TO Y2K TESTING BY THE NRC. A SERIES OF INCOMPLETE COMMUNICATIONS LED THEM TO THAT CONCLUSION.
THE RESIDENT INSPECTOR WAS NOTIFIED.
REG2 RDO(BOLAND) WAS INFORMED.
The following text is a portion of a facsimile received from the licensee:
"During [technical specification] surveillance testing [with the unit] at 100% power, a testing failure occurred on the train 'A' reactor trip breaker. The test in progress was MST-I001, Train 'A' Solid State Protection System Actuation Logic and Master Relay Test. During this test, the 'A' reactor trip breaker failed to close with the test pushbutton. The following timeline occurred:"
"0821- [The] train 'A' reactor trip bypass breaker [was racked in and closed]. This began a 2-hour time
limit allowed for surveillance testing.
0916 - Reactor trip breaker 'A' failed to close with the test pushbutton. At this point, the 2-hour limit for
surveillance testing ended, and [Technical Specification] 3.3.1, action 8, was entered. This action
required the plant to be in Mode 3 within 6 hours. The time to enter Mode 3 is 1516.
1026 - NRC Region II representative, George MacDonald, [was] notified of [limiting condition for operation]
and necessity to be in Mode 3 by 1516. Mr. MacDonald was notified because [the] Harris resident
inspectors are out of town.
1219 - [A generator] load reduction for plant shutdown [was commenced]. Maintenance and engineering
personnel are investigating the problem."
The licensee emphasized that the train 'A' reactor trip breaker did not fail to open, which is its safety function. The breaker only failed to re-close. It has since been opened and re-closed several times during ongoing troubleshooting activities. The licensee currently believes that the failure of the breaker to re-close reliably may be the result of a possible problem with the test circuitry allowing the test signal to stay in.
Although all of the emergency diesel generators and emergency core cooling systems are operable and available if needed, the licensee stated that the emergency response data system is not available due to a Y2K problem. (The Y2K problem is not related to the breaker problem.)
*** UPDATE ON 2/19/99 @ 1356 BY FLEMING TO GOULD ***
THE PLANT EXITED TS 3.3.1 ACTION 8 AT 1452 ON 2/17/99 WHILE AT 7% POWER. THE UNIT DID NOT DROP FROM THE GRID OR ENTER MODE 3 PRIOR TO DECLARING THE "A" REACTOR TRIP BREAKER OPERABLE AND IN-SERVICE WITH ITS BYPASS BREAKER OPEN. AFTER EXITING THE LCO, POWER LEVEL WAS INCREASED AND THE REACTOR IS CURRENTLY AT 100% POWER.
THE ORIGINAL REPORT STATED THAT "ERDS NOT AVAILABLE DUE TO Y2K PROBLEM." A SUBSEQUENT INVESTIGATION HAS REVEALED THAT ERDS REMAINED AVAILABLE IMMEDIATELY PRIOR TO AND DURING THE REPORTED EVENT. CONTROL ROOM STAFF WAS UNDER A MISTAKEN IMPRESSION THAT THE ERDS LINK WAS UNAVAILABLE DUE TO Y2K TESTING BY THE NRC. A SERIES OF INCOMPLETE COMMUNICATIONS LED THEM TO THAT CONCLUSION.
THE RESIDENT INSPECTOR WAS NOTIFIED.
REG2 RDO(BOLAND) WAS INFORMED.
Power Reactor
Event Number: 35379
Facility: CALVERT CLIFFS
Region: 1 State: MD
Unit: [1] [] []
RX Type: [1] CE,[2] CE
NRC Notified By: ERIC MEERBACH
HQ OPS Officer: LEIGH TROCINE
Region: 1 State: MD
Unit: [1] [] []
RX Type: [1] CE,[2] CE
NRC Notified By: ERIC MEERBACH
HQ OPS Officer: LEIGH TROCINE
Notification Date: 02/17/1999
Notification Time: 15:55 [ET]
Event Date: 02/17/1999
Event Time: 14:30 [EST]
Last Update Date: 02/17/1999
Notification Time: 15:55 [ET]
Event Date: 02/17/1999
Event Time: 14:30 [EST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
JIM TRAPP (R1)
JIM TRAPP (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
OFFSITE NOTIFICATION OF HIGH COLIFORM IN THE DRINKING WATER AT THE VISITOR'S CENTER
A positive coliform result was received for the drinking water at the site's visitor's center. Accordingly, Chemistry personnel were notified, and an Issue Report was generated. The licensee also notified the Maryland Department of the Environment and the NRC resident inspector.
A positive coliform result was received for the drinking water at the site's visitor's center. Accordingly, Chemistry personnel were notified, and an Issue Report was generated. The licensee also notified the Maryland Department of the Environment and the NRC resident inspector.
Hospital
Event Number: 35380
Rep Org: LOWER BUCKS HOSPITAL
Licensee: LOWER BUCKS HOSPITAL
Region: 1
City: BRISTOL State: PA
County: BUCKS
License #: SNM-1800
Agreement: N
Docket:
NRC Notified By: DR. MARK ANSLEY
HQ OPS Officer: LEIGH TROCINE
Licensee: LOWER BUCKS HOSPITAL
Region: 1
City: BRISTOL State: PA
County: BUCKS
License #: SNM-1800
Agreement: N
Docket:
NRC Notified By: DR. MARK ANSLEY
HQ OPS Officer: LEIGH TROCINE
Notification Date: 02/17/1999
Notification Time: 16:24 [ET]
Event Date: 02/17/1999
Event Time: 12:00 [EST]
Last Update Date: 02/17/1999
Notification Time: 16:24 [ET]
Event Date: 02/17/1999
Event Time: 12:00 [EST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
JIM TRAPP (R1)
CHARLEY HAUGHNEY (NMSS)
JIM TRAPP (R1)
CHARLEY HAUGHNEY (NMSS)
DEATH OF A PATIENT WITH AN IMPLANTED NUCLEAR-POWERED CARDIAC PACEMAKER (24-hour report)
A representative from Lower Bucks Hospital located in Bristol, PA, reported the death of a patient with an implanted nuclear-powered cardiac pacemaker. The patient expired today (02/17/99) at Einstein Hospital located in Philadelphia, PA. The pacemaker was manufactured by Coratomic (model #C-101, serial #1054), and it contained 4 grams of Plutonium-238.
The pacemaker is currently implanted in the patient, and the licensee plans to have Einstein Hospital remove it. Once the pacemaker is retrieved, it will be shipped to the manufacturer for proper disposal. When notification of receipt is received by the licensee, the licensee plans to submit a written report to the NRC. The licensee also plans to notify the NRC Region I Office.
(Contact the NRC operations officer for a site contact telephone number.)
A representative from Lower Bucks Hospital located in Bristol, PA, reported the death of a patient with an implanted nuclear-powered cardiac pacemaker. The patient expired today (02/17/99) at Einstein Hospital located in Philadelphia, PA. The pacemaker was manufactured by Coratomic (model #C-101, serial #1054), and it contained 4 grams of Plutonium-238.
The pacemaker is currently implanted in the patient, and the licensee plans to have Einstein Hospital remove it. Once the pacemaker is retrieved, it will be shipped to the manufacturer for proper disposal. When notification of receipt is received by the licensee, the licensee plans to submit a written report to the NRC. The licensee also plans to notify the NRC Region I Office.
(Contact the NRC operations officer for a site contact telephone number.)
Power Reactor
Event Number: 35381
Facility: NINE MILE POINT
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: JIM KRONENBITTER
HQ OPS Officer: LEIGH TROCINE
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: JIM KRONENBITTER
HQ OPS Officer: LEIGH TROCINE
Notification Date: 02/17/1999
Notification Time: 18:47 [ET]
Event Date: 02/17/1999
Event Time: 18:40 [EST]
Last Update Date: 02/17/1999
Notification Time: 18:47 [ET]
Event Date: 02/17/1999
Event Time: 18:40 [EST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
JIM TRAPP (R1)
JIM TRAPP (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 98 | Power Operation |
TECHNICAL SPECIFICATION REQUIRED PLANT SHUTDOWN DUE TO FAILURE TO PERFORM SURVEILLANCE TESTING IN ACCORDANCE WITH ASME SECTION XI REQUIREMENTS FOLLOWING REPLACEMENT OF EMERGENCY (ISO) CONDENSER TUBE BUNDLES LAST FALL
The following text is a portion of a facsimile received from the licensee:
"In accordance with Technical Specification 3.2.6(a)1, Quality Group A, B, and C components shall satisfy the requirements contained in Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda for continued service of ASME Code Class 1, 2, and 3 components to be considered operable. The pre-service inspection (radiographs) for emergency condensers 111, 112, 121, and 122 was performed prior to the construction hydrostatic test for emergency condensers 111, 112, 121, and 122. This sequence of testing is contrary to the requirements of the ASME code. Emergency condensers 111, 112, 121, and 122 are inoperable. Technical Specification 3.1.3(e) requires [that] a normal orderly shutdown shall be initiated within [1-]hour and [that] the reactor shall be in the Cold Shutdown condition within [10] hours with no emergency cooling system operable."
The licensee stated that all of the Unit 1 emergency condensers were declared inoperable at approximately 1750, and a unit shutdown was commenced at 1840.
The licensee notified the NRC resident inspector.
HOO NOTE: At approximately 1900 on 02/17/99, the licensee requested a Notice of Enforcement Discretion to
allow 48 hours to perform the required testing. A Notice of Enforcement Discretion was granted by
the NRC Region 1 Office at 2026.
The following text is a portion of a facsimile received from the licensee:
"In accordance with Technical Specification 3.2.6(a)1, Quality Group A, B, and C components shall satisfy the requirements contained in Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda for continued service of ASME Code Class 1, 2, and 3 components to be considered operable. The pre-service inspection (radiographs) for emergency condensers 111, 112, 121, and 122 was performed prior to the construction hydrostatic test for emergency condensers 111, 112, 121, and 122. This sequence of testing is contrary to the requirements of the ASME code. Emergency condensers 111, 112, 121, and 122 are inoperable. Technical Specification 3.1.3(e) requires [that] a normal orderly shutdown shall be initiated within [1-]hour and [that] the reactor shall be in the Cold Shutdown condition within [10] hours with no emergency cooling system operable."
The licensee stated that all of the Unit 1 emergency condensers were declared inoperable at approximately 1750, and a unit shutdown was commenced at 1840.
The licensee notified the NRC resident inspector.
HOO NOTE: At approximately 1900 on 02/17/99, the licensee requested a Notice of Enforcement Discretion to
allow 48 hours to perform the required testing. A Notice of Enforcement Discretion was granted by
the NRC Region 1 Office at 2026.
Power Reactor
Event Number: 35373
Facility: SALEM
Region: 1 State: NJ
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: STEVE SAUER
HQ OPS Officer: DICK JOLLIFFE
Region: 1 State: NJ
Unit: [] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: STEVE SAUER
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 02/17/1999
Notification Time: 02:16 [ET]
Event Date: 02/17/1999
Event Time: 02:02 [EST]
Last Update Date: 02/17/1999
Notification Time: 02:16 [ET]
Event Date: 02/17/1999
Event Time: 02:02 [EST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
JIM TRAPP (R1)
JIM TRAPP (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 98 | Power Operation |
- TECH SPEC REQUIRED PLANT SHUTDOWN DUE TO A 28 VOLT DC BATTERY CELL TESTING LOW -
AT 0202 ON 02/17/99, DURING THE PERFORMANCE OF A QUARTERLY SURVEILLANCE TEST, THE VOLTAGE OF ONE OF THE 28 VOLT DC BATTERY CELLS TESTED AT 2.11 VDC. THE TECH SPEC MINIMUM LIMIT IS 2.13 VDC. TECH SPEC LCO A/S 3.8.2.5 REQUIRES THE LICENSEE TO REPLACE THE AFFECTED CELL IN TWO HOURS OR PLACE UNIT 2 IN THE HOT STANDBY MODE WITHIN SIX HOURS. THE LICENSEE PLANS TO REPLACE THE AFFECTED CELL WITHIN TWO HOURS.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE AT 0354 ON 02/17/99 FROM STEVE SAUER TO JOLLIFFE * * *
AT 0351 ON 02/17/99, THE LICENSEE REPLACED THE AFFECTED BATTERY CELL AND EXITED TECH SPEC LCO A/S 3.8.2.5.
THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED THE R1DO JIM TRAPP.
AT 0202 ON 02/17/99, DURING THE PERFORMANCE OF A QUARTERLY SURVEILLANCE TEST, THE VOLTAGE OF ONE OF THE 28 VOLT DC BATTERY CELLS TESTED AT 2.11 VDC. THE TECH SPEC MINIMUM LIMIT IS 2.13 VDC. TECH SPEC LCO A/S 3.8.2.5 REQUIRES THE LICENSEE TO REPLACE THE AFFECTED CELL IN TWO HOURS OR PLACE UNIT 2 IN THE HOT STANDBY MODE WITHIN SIX HOURS. THE LICENSEE PLANS TO REPLACE THE AFFECTED CELL WITHIN TWO HOURS.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE AT 0354 ON 02/17/99 FROM STEVE SAUER TO JOLLIFFE * * *
AT 0351 ON 02/17/99, THE LICENSEE REPLACED THE AFFECTED BATTERY CELL AND EXITED TECH SPEC LCO A/S 3.8.2.5.
THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED THE R1DO JIM TRAPP.
Power Reactor
Event Number: 35374
Facility: LIMERICK
Region: 1 State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: CARL RICH
HQ OPS Officer: DICK JOLLIFFE
Region: 1 State: PA
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: CARL RICH
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 02/17/1999
Notification Time: 03:50 [ET]
Event Date: 02/17/1999
Event Time: 02:50 [EST]
Last Update Date: 02/17/1999
Notification Time: 03:50 [ET]
Event Date: 02/17/1999
Event Time: 02:50 [EST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
JIM TRAPP (R1)
JIM TRAPP (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
- PLANT SECURITY REPORT -
A COMPROMISE OF PLANT SECURITY DOCUMENT WAS DISCOVERED. COMPENSATORY MEASURES WERE IMMEDIATELY TAKEN UPON DISCOVERY. CONTACT THE NRC OPERATIONS OFFICER FOR ADDITIONAL DETAILS.
THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR.
A COMPROMISE OF PLANT SECURITY DOCUMENT WAS DISCOVERED. COMPENSATORY MEASURES WERE IMMEDIATELY TAKEN UPON DISCOVERY. CONTACT THE NRC OPERATIONS OFFICER FOR ADDITIONAL DETAILS.
THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR.
Power Reactor
Event Number: 35375
Facility: QUAD CITIES
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: DARYL NOHR
HQ OPS Officer: DICK JOLLIFFE
Region: 3 State: IL
Unit: [] [2] []
RX Type: [1] GE-3,[2] GE-3
NRC Notified By: DARYL NOHR
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 02/17/1999
Notification Time: 05:16 [ET]
Event Date: 02/17/1999
Event Time: 00:20 [CST]
Last Update Date: 02/17/1999
Notification Time: 05:16 [ET]
Event Date: 02/17/1999
Event Time: 00:20 [CST]
Last Update Date: 02/17/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
MIKE JORDAN (R3)
MIKE JORDAN (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
- UNIT 2 RECEIVED ESF ACTUATIONS DUE TO A FAILED VOLTAGE REGULATOR. -
AT 0020 CST ON 02/17/99, UNIT 2 (100% POWER) UNEXPECTEDLY RECEIVED THE FOLLOWING ENGINEERED SAFETY FEATURE (ESF) ACTUATIONS: HALF SCRAM SIGNAL, HALF PRIMARY CONTAINMENT ISOLATION SYSTEM (PCIS) GROUP 1 ISOLATION SIGNAL (MAIN STEAM LINE VALVES), HALF PCIS GROUP 2 ISOLATION SIGNAL (VENT AND SAMPLE VALVES INSIDE THE DRYWELL), AND REACTOR WATER CLEANUP ISOLATION SIGNAL. AS PART OF THE PARTIAL PCIS GROUP 2 ESF ACTUATION, SEVERAL PRIMARY CONTAINMENT ISOLATION VALVES CLOSED.
AT THE TIME OF THE ESF ACTUATION, THE #2A REACTOR PROTECTION SYSTEM (RPS) WAS BEING SUPPLIED FROM ITS RESERVE FEED, AND THE LICENSEE DETERMINED IT TO BE TRIPPED DUE TO A FAILED VOLTAGE REGULATOR. THE LICENSEE REENERGIZED THE #2A RPS FROM ITS NORMAL FEED AND RESTORED THE PLANT LINEUP TO NORMAL EXCEPT THE #2A MAIN STEAM LINE RADIATION MONITOR DOWNSCALE WOULD NOT RESET. THE LICENSEE INSERTED A HALF SCRAM SIGNAL AND A HALF PCIS GROUP 1 ISOLATION SIGNAL IN ACCORDANCE WITH TECH SPEC REQUIREMENTS WHILE REPAIRS ARE IN PROGRESS.
THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR.
AT 0020 CST ON 02/17/99, UNIT 2 (100% POWER) UNEXPECTEDLY RECEIVED THE FOLLOWING ENGINEERED SAFETY FEATURE (ESF) ACTUATIONS: HALF SCRAM SIGNAL, HALF PRIMARY CONTAINMENT ISOLATION SYSTEM (PCIS) GROUP 1 ISOLATION SIGNAL (MAIN STEAM LINE VALVES), HALF PCIS GROUP 2 ISOLATION SIGNAL (VENT AND SAMPLE VALVES INSIDE THE DRYWELL), AND REACTOR WATER CLEANUP ISOLATION SIGNAL. AS PART OF THE PARTIAL PCIS GROUP 2 ESF ACTUATION, SEVERAL PRIMARY CONTAINMENT ISOLATION VALVES CLOSED.
AT THE TIME OF THE ESF ACTUATION, THE #2A REACTOR PROTECTION SYSTEM (RPS) WAS BEING SUPPLIED FROM ITS RESERVE FEED, AND THE LICENSEE DETERMINED IT TO BE TRIPPED DUE TO A FAILED VOLTAGE REGULATOR. THE LICENSEE REENERGIZED THE #2A RPS FROM ITS NORMAL FEED AND RESTORED THE PLANT LINEUP TO NORMAL EXCEPT THE #2A MAIN STEAM LINE RADIATION MONITOR DOWNSCALE WOULD NOT RESET. THE LICENSEE INSERTED A HALF SCRAM SIGNAL AND A HALF PCIS GROUP 1 ISOLATION SIGNAL IN ACCORDANCE WITH TECH SPEC REQUIREMENTS WHILE REPAIRS ARE IN PROGRESS.
THE LICENSEE PLANS TO INFORM THE NRC RESIDENT INSPECTOR.
Power Reactor
Event Number: 35560
Facility: SEABROOK
Region: 1 State: NH
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: KILBY
HQ OPS Officer: BOB STRANSKY
Region: 1 State: NH
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: KILBY
HQ OPS Officer: BOB STRANSKY
Notification Date: 04/08/1999
Notification Time: 15:41 [ET]
Event Date: 02/17/1999
Event Time: 00:00 [EDT]
Last Update Date: 05/13/1999
Notification Time: 15:41 [ET]
Event Date: 02/17/1999
Event Time: 00:00 [EDT]
Last Update Date: 05/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
FRANK COSTELLO (R1)
FRANK COSTELLO (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Refueling | 0 | Refueling |
UNESCORTED ACCESS GRANTED INAPPROPRIATELY. IMMEDIATE COMPENSATORY MEASURES TAKEN UPON DISCOVERY. CONTACT HOO FOR ADDITIONAL DETAILS.
******************** UPDATE AT 1131 ON 05/13/99 FROM MIKE DAVID TO TROCINE ********************
The following text is a portion of a facsimile received from the licensee:
"North Atlantic [Energy Service Corporation] is providing this update because the NRC Daily Report (Event Number: 35560) described this event as 'Unescorted Access Granted Inappropriately.' North Atlantic believes that the Unescorted Access was granted in accordance with the appropriate procedures and that it did not violate any NRC regulations; hence, it was appropriate. Furthermore, the appropriate action was taken when the FBI information was received. North Atlantic believes that the event would have been more accurately described as 'Unescorted Access Revoked.'"
Contact the NRC operations officer for additional details.
The licensee notified the NRC resident inspector. The NRC operations officer notified the R1DO (Caruso).
******************** UPDATE AT 1131 ON 05/13/99 FROM MIKE DAVID TO TROCINE ********************
The following text is a portion of a facsimile received from the licensee:
"North Atlantic [Energy Service Corporation] is providing this update because the NRC Daily Report (Event Number: 35560) described this event as 'Unescorted Access Granted Inappropriately.' North Atlantic believes that the Unescorted Access was granted in accordance with the appropriate procedures and that it did not violate any NRC regulations; hence, it was appropriate. Furthermore, the appropriate action was taken when the FBI information was received. North Atlantic believes that the event would have been more accurately described as 'Unescorted Access Revoked.'"
Contact the NRC operations officer for additional details.
The licensee notified the NRC resident inspector. The NRC operations officer notified the R1DO (Caruso).