Event Notification Report for February 15, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
02/14/1999 - 02/15/1999

EVENT NUMBERS
3537035371

Power Reactor
Event Number: 35370
Facility: MONTICELLO
Region: 3     State: MN
Unit: [1] [] []
RX Type: [1] GE-3
NRC Notified By: JIM McKAY
HQ OPS Officer: LEIGH TROCINE
Notification Date: 02/15/1999
Notification Time: 16:58 [ET]
Event Date: 02/15/1999
Event Time: 15:19 [CST]
Last Update Date: 02/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
GARY SHEAR (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
HIGH PRESSURE COOLANT INJECTION (HPCI) GROUP IV ISOLATION DURING TESTING

During a quarterly HPCI test run, a Group IV high steam flow isolation was received. The cause of the high steam flow isolation is under investigation.

The licensee stated that the isolation had not yet been reset and that all other emergency core cooling systems are operable and available if needed. The unit is currently in a 14-day limiting condition for operation because HPCI is out of service.

The licensee notified the NRC resident inspector.


Power Reactor
Event Number: 35371
Facility: CATAWBA
Region: 2     State: SC
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: GARY CLEMENTS
HQ OPS Officer: LEIGH TROCINE
Notification Date: 02/15/1999
Notification Time: 22:33 [ET]
Event Date: 02/15/1999
Event Time: 21:45 [EST]
Last Update Date: 02/16/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(A) - UNANALYZED COND OP
Person (Organization):
THOMAS DECKER (R2)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
DISCOVERY THAT UNIT 1 FUELING WATER STORAGE TANK (FWST) CHANNEL 3 WAS NOT PLACED IN BYPASS WITHIN 6 HOURS OF BECOMING INOPERABLE

FWST Channel 3 was tripped shortly after 0800 today to facilitate a modification to change out a transmitter. With this channel removed from service, plant technical specifications require the licensee to place the channel in bypass within 6 hours. At 2145, it was discovered that the channel had not been placed in bypass within 6 hours of becoming inoperable, and the unit entered Technical Specification 3.0.3. The channel was successfully placed in bypass within 2 minutes, and Technical Specification 3.0.3 was exited at 2147.

The licensee plans to notify the NRC resident inspector.

[HOO NOTE: This event report is being reissued to correct the site name.]