Event Notification Report for February 07, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
02/06/1999 - 02/07/1999
Power Reactor
Event Number: 35356
Facility: SAINT LUCIE
Region: 2 State: FL
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: CALVIN WARD
HQ OPS Officer: DICK JOLLIFFE
Region: 2 State: FL
Unit: [1] [2] []
RX Type: [1] CE,[2] CE
NRC Notified By: CALVIN WARD
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 02/09/1999
Notification Time: 13:09 [ET]
Event Date: 02/07/1999
Event Time: 17:00 [EST]
Last Update Date: 02/09/1999
Notification Time: 13:09 [ET]
Event Date: 02/07/1999
Event Time: 17:00 [EST]
Last Update Date: 02/09/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
THOMAS DECKER (R2)
THOMAS DECKER (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
- STATE NOTIFIED OF A SMALL DEAD GREEN TURTLE FOUND IN A NET IN THE PLANT INTAKE CANAL -
THE LICENSEE FOUND A DEAD 7.5 POUND GREEN TURTLE IN A CAPTURE NET IN THE PLANT INTAKE CANAL. THE LICENSEE NOTIFIED THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP) AND PLANS TO SEND THE TURTLE TO A FLORIDA DEP LAB FOR NECROPSY. THE LICENSEE IS DETERMINING CORRECTIVE ACTIONS AND PLANS TO SUBMIT A WRITTEN REPORT TO THE NRC WITHIN 30 DAYS.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
THE LICENSEE FOUND A DEAD 7.5 POUND GREEN TURTLE IN A CAPTURE NET IN THE PLANT INTAKE CANAL. THE LICENSEE NOTIFIED THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP) AND PLANS TO SEND THE TURTLE TO A FLORIDA DEP LAB FOR NECROPSY. THE LICENSEE IS DETERMINING CORRECTIVE ACTIONS AND PLANS TO SUBMIT A WRITTEN REPORT TO THE NRC WITHIN 30 DAYS.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
Power Reactor
Event Number: 35352
Facility: GRAND GULF
Region: 4 State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: HANKS
HQ OPS Officer: CHAUNCEY GOULD
Region: 4 State: MS
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: HANKS
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 02/08/1999
Notification Time: 00:34 [ET]
Event Date: 02/07/1999
Event Time: 22:38 [CST]
Last Update Date: 02/08/1999
Notification Time: 00:34 [ET]
Event Date: 02/07/1999
Event Time: 22:38 [CST]
Last Update Date: 02/08/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
JEFF SHACKELFORD (R4)
JEFF SHACKELFORD (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
THE LICENSEE DECLARED RCIC INOPERABLE AND ENTERED A 14 DAY LCO ACTION STATEMENT.
RCIC WAS DECLARED INOPERABLE WHEN A DIVISION II ISOLATION OCCURRED DUE TO AN INVALID SIGNAL DURING THE PERFORMANCE OF A SURVEILLANCE. THE CAUSE IS BEING INVESTIGATED. HPCS WAS VERIFIED OPERABLE WITHIN ONE HOUR , AS REQUIRED BY THE LCO ACTION STATEMENT, AT 2310 CST. RCIC IS REQUIRED TO BE RETURNED TO SERVICE WITHIN 14 DAYS. THE ISOLATION SIGNAL HAS BEEN RESET, BUT THE VALVES ARE STILL CLOSED AND WILL NOT BE REOPENED UNTIL THE CAUSE OF THE ISOLATION HAS BEEN DETERMINED.
THE RESIDENT INSPECTOR WILL BE NOTIFIED.
RCIC WAS DECLARED INOPERABLE WHEN A DIVISION II ISOLATION OCCURRED DUE TO AN INVALID SIGNAL DURING THE PERFORMANCE OF A SURVEILLANCE. THE CAUSE IS BEING INVESTIGATED. HPCS WAS VERIFIED OPERABLE WITHIN ONE HOUR , AS REQUIRED BY THE LCO ACTION STATEMENT, AT 2310 CST. RCIC IS REQUIRED TO BE RETURNED TO SERVICE WITHIN 14 DAYS. THE ISOLATION SIGNAL HAS BEEN RESET, BUT THE VALVES ARE STILL CLOSED AND WILL NOT BE REOPENED UNTIL THE CAUSE OF THE ISOLATION HAS BEEN DETERMINED.
THE RESIDENT INSPECTOR WILL BE NOTIFIED.