Event Notification Report for January 27, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/26/1999 - 01/27/1999
EVENT NUMBERS
35323
General Information or Other
Event Number: 35323
Rep Org: MD RADIOLOGICAL HEALTH DEPT
Licensee: SYNCOR INTERNATIONAL CORP
Region: 1
City: TIMONIUM State: MD
County:
License #: MD-05-058-01
Agreement: Y
Docket:
NRC Notified By: DONNA GAINES
HQ OPS Officer: DICK JOLLIFFE
Licensee: SYNCOR INTERNATIONAL CORP
Region: 1
City: TIMONIUM State: MD
County:
License #: MD-05-058-01
Agreement: Y
Docket:
NRC Notified By: DONNA GAINES
HQ OPS Officer: DICK JOLLIFFE
Notification Date: 01/29/1999
Notification Time: 09:35 [ET]
Event Date: 01/27/1999
Event Time: 12:00 [EST]
Last Update Date: 01/29/1999
Notification Time: 09:35 [ET]
Event Date: 01/27/1999
Event Time: 12:00 [EST]
Last Update Date: 01/29/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
10 CFR Section:
Person (Organization):
DAVID SILK (R1)
DAVID SILK (R1)
- Moly Generator shipping box apparently contaminated at Syncor -
On 01/28/99, a Moly Generator shipped by FedEx from Dupont received at Syncor International Corporation in Timonium, MD, was found to have external contamination but no internal contamination. The wipes from outside of the generator shipping box read 224,590 cpm (244,385 dpm). The generator was taken out of the shipping box and used since there was no internal contamination. The shipping box was isolated and rewiped later in the afternoon, and no contamination was detected.
The shipping box was labeled RADIII Mo-99 287.59 GBq with a TI of 4.1.
The FedEx driver and his delivery truck were surveyed and no contamination above background was found.
Based on the above events, it appears that the shipping box was contaminated once in the restricted area at Syncor. The person conducting the survey could have touched something contaminated and subsequently contaminated the shipping box.
Syncor's package receipt procedures were reviewed by a MD inspector with emphasis on their protocol for contaminated packages.
Syncor is conducting an investigation and plans to submit a written report of this incident and follow-up action taken to MD within 30 days.
On 01/28/99, a Moly Generator shipped by FedEx from Dupont received at Syncor International Corporation in Timonium, MD, was found to have external contamination but no internal contamination. The wipes from outside of the generator shipping box read 224,590 cpm (244,385 dpm). The generator was taken out of the shipping box and used since there was no internal contamination. The shipping box was isolated and rewiped later in the afternoon, and no contamination was detected.
The shipping box was labeled RADIII Mo-99 287.59 GBq with a TI of 4.1.
The FedEx driver and his delivery truck were surveyed and no contamination above background was found.
Based on the above events, it appears that the shipping box was contaminated once in the restricted area at Syncor. The person conducting the survey could have touched something contaminated and subsequently contaminated the shipping box.
Syncor's package receipt procedures were reviewed by a MD inspector with emphasis on their protocol for contaminated packages.
Syncor is conducting an investigation and plans to submit a written report of this incident and follow-up action taken to MD within 30 days.