Event Notification Report for January 14, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/13/1999 - 01/14/1999
EVENT NUMBERS
365233525935260352613526235263352643526535266
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
!!!!! THIS EVENT HAS BEEN RETRACTED !!!!!
Power Reactor
Event Number: 36523
Facility: FITZPATRICK
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MIKE ABRAMSKI
HQ OPS Officer: DOUG WEAVER
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: MIKE ABRAMSKI
HQ OPS Officer: DOUG WEAVER
Notification Date: 12/17/1999
Notification Time: 12:47 [ET]
Event Date: 01/14/1999
Event Time: 12:00 [EST]
Last Update Date: 01/14/2000
Notification Time: 12:47 [ET]
Event Date: 01/14/1999
Event Time: 12:00 [EST]
Last Update Date: 01/14/2000
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(C) - POT UNCNTRL RAD REL
10 CFR Section:
50.72(b)(2)(iii)(C) - POT UNCNTRL RAD REL
Person (Organization):
BILL RULAND (R1)
BILL RULAND (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
MAIN STEAM RADIATION MONITORS ALARM SETPOINT SET TOO HIGH
THE TRIP LEVEL SETTING OF THE MAIN STEAM LINE TUNNEL HIGH RADIATION MONITORS IS REQUIRED TO BE <= 3X NORMAL RATED FULL POWER BACKGROUND. THE NORMAL RATED FULL POWER BACKGROUND RADIATION LEVEL IS DEPENDANT ON HYDROGEN INJECTION RATE. THE PLANT OPERATED FROM 01/14/99 TO 03/19/99 WITH HYDROGEN INJECTION OUT OF SERVICE, AND THE MAIN STEAM LINE TUNNEL RADIATION MONITOR TRIP LEVEL SETTING WAS NOT LOWERED TO <= 3X THE NORMAL RATED FULL POWER BACKGROUND WITH HYDROGEN INJECTION OUT OF SERVICE.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * RETRACTED AT 1407 EST ON 01/14/2000 FROM GORDON BROWNELL TO FANGIE JONES * * *
The license is retracting this event notification. After a subsequent review determined that during the reported period, the main steam line tunnel radiation monitor trip level setpoint was in accordance with technical specification requirements, and the system would have initiated safety actions consistent with system design.
The licensee notified the NRC resident inspector, and the R1DO (Glenn Meyer) was notified by the NRC Operations Officer.
THE TRIP LEVEL SETTING OF THE MAIN STEAM LINE TUNNEL HIGH RADIATION MONITORS IS REQUIRED TO BE <= 3X NORMAL RATED FULL POWER BACKGROUND. THE NORMAL RATED FULL POWER BACKGROUND RADIATION LEVEL IS DEPENDANT ON HYDROGEN INJECTION RATE. THE PLANT OPERATED FROM 01/14/99 TO 03/19/99 WITH HYDROGEN INJECTION OUT OF SERVICE, AND THE MAIN STEAM LINE TUNNEL RADIATION MONITOR TRIP LEVEL SETTING WAS NOT LOWERED TO <= 3X THE NORMAL RATED FULL POWER BACKGROUND WITH HYDROGEN INJECTION OUT OF SERVICE.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * RETRACTED AT 1407 EST ON 01/14/2000 FROM GORDON BROWNELL TO FANGIE JONES * * *
The license is retracting this event notification. After a subsequent review determined that during the reported period, the main steam line tunnel radiation monitor trip level setpoint was in accordance with technical specification requirements, and the system would have initiated safety actions consistent with system design.
The licensee notified the NRC resident inspector, and the R1DO (Glenn Meyer) was notified by the NRC Operations Officer.
Power Reactor
Event Number: 35259
Facility: BIG ROCK POINT
Region: 3 State: MI
Unit: [1] [] []
RX Type: [1] GE-1
NRC Notified By: MIKE AZURE
HQ OPS Officer: LEIGH TROCINE
Region: 3 State: MI
Unit: [1] [] []
RX Type: [1] GE-1
NRC Notified By: MIKE AZURE
HQ OPS Officer: LEIGH TROCINE
Notification Date: 01/14/1999
Notification Time: 03:26 [ET]
Event Date: 01/14/1999
Event Time: 03:00 [EST]
Last Update Date: 01/14/1999
Notification Time: 03:26 [ET]
Event Date: 01/14/1999
Event Time: 03:00 [EST]
Last Update Date: 01/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(v) - ENS INOPERABLE
10 CFR Section:
50.72(b)(1)(v) - ENS INOPERABLE
Person (Organization):
JIM GAVULA (R3)
JIM GAVULA (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Decommissioned | 0 | Decommissioned |
LOSS OF EMERGENCY NOTIFICATION SYSTEM (ENS) AND COMMERCIAL TELEPHONES
At 0300, it was discovered that the FTS-2000 ENS telephone line and the offsite commercial telephone lines were out of service. The cause of this telephone outage is unknown at this time. However, the licensee stated that there does not seem to be a trunk line problem. The licensee has contacted Ameritech and a local telephone representative. Offsite communications are available via the use of cellular telephones and base radios to the Michigan State Police and to the licensee's power control (load dispatcher). Outside calls can be made from those locations if it is necessary for the licensee to relay information.
(Call the NRC Operations Center for a licensee cellular telephone number.)
******************** UPDATE AT 1009 ON 01/14/99 FROM GARY RUEHLE TO TROCINE ********************
Telephone service was restored at approximately 0930, and the ENS line tested satisfactorily at 1009. The telephone outage was due to an Ameritech problem.
The NRC operations officer notified the R3DO (Gavula).
At 0300, it was discovered that the FTS-2000 ENS telephone line and the offsite commercial telephone lines were out of service. The cause of this telephone outage is unknown at this time. However, the licensee stated that there does not seem to be a trunk line problem. The licensee has contacted Ameritech and a local telephone representative. Offsite communications are available via the use of cellular telephones and base radios to the Michigan State Police and to the licensee's power control (load dispatcher). Outside calls can be made from those locations if it is necessary for the licensee to relay information.
(Call the NRC Operations Center for a licensee cellular telephone number.)
******************** UPDATE AT 1009 ON 01/14/99 FROM GARY RUEHLE TO TROCINE ********************
Telephone service was restored at approximately 0930, and the ENS line tested satisfactorily at 1009. The telephone outage was due to an Ameritech problem.
The NRC operations officer notified the R3DO (Gavula).
Hospital
Event Number: 35260
Rep Org: HAWAIIAN EYE CENTER
Licensee: HAWAIIAN EYE CENTER
Region: 4
City: WAHIAWA State: HI
County: HONOLULU
License #: 53-18343-01
Agreement: N
Docket:
NRC Notified By: CYNTHIA SEMBRANO
HQ OPS Officer: STEVE SANDIN
Licensee: HAWAIIAN EYE CENTER
Region: 4
City: WAHIAWA State: HI
County: HONOLULU
License #: 53-18343-01
Agreement: N
Docket:
NRC Notified By: CYNTHIA SEMBRANO
HQ OPS Officer: STEVE SANDIN
Notification Date: 01/14/1999
Notification Time: 13:00 [ET]
Event Date: 01/14/1999
Event Time: 00:00 [HST]
Last Update Date: 01/14/1999
Notification Time: 13:00 [ET]
Event Date: 01/14/1999
Event Time: 00:00 [HST]
Last Update Date: 01/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
35.33 - MED MISADMINISTRATION
10 CFR Section:
35.33 - MED MISADMINISTRATION
Person (Organization):
BLAIR SPITZBERG (R4)
JOHN SURMEIER, EO (NMSS)
BLAIR SPITZBERG (R4)
JOHN SURMEIER, EO (NMSS)
LICENSEE REPORTED THAT NUMEROUS PATIENTS RECEIVED LESS THAN THE PRESCRIBED Sr-90 DOSE.
IN 1998, TWELVE (12) PATIENTS WERE DIAGNOSED AND TREATED FOR PTERYGIUM, A SUPERFICIAL GROWTH ON THE LENS OF THE EYE, ELEVEN HUNDRED (1,100) RADS WAS PRESCRIBED FOR EACH; HOWEVER, DUE TO THE LICENSEE NOT APPLYING A DECAY FACTOR TO THE STRONTIUM-90 SOURCE, PATIENTS RECEIVED APPROXIMATELY 600 RADS. THE TWO (2) EYE APPLICATORS (SERIAL #s 0302 AND 431 - EACH 100 mCi Sr-90) WERE RECEIVED FROM NEW ENGLAND NUCLEAR IN MARCH 1979. THE DISCREPANCY IN THE PRESCRIBED VERSUS ADMINISTERED DOSE WAS DISCOVERED DURING AN ONSITE INSPECTION BY THE NRC ON 01/13/99. THE LICENSEE IS CONTINUING ITS INVESTIGATION TO DETERMINE APPROPRIATE CORRECTIVE ACTIONS.
IN 1998, TWELVE (12) PATIENTS WERE DIAGNOSED AND TREATED FOR PTERYGIUM, A SUPERFICIAL GROWTH ON THE LENS OF THE EYE, ELEVEN HUNDRED (1,100) RADS WAS PRESCRIBED FOR EACH; HOWEVER, DUE TO THE LICENSEE NOT APPLYING A DECAY FACTOR TO THE STRONTIUM-90 SOURCE, PATIENTS RECEIVED APPROXIMATELY 600 RADS. THE TWO (2) EYE APPLICATORS (SERIAL #s 0302 AND 431 - EACH 100 mCi Sr-90) WERE RECEIVED FROM NEW ENGLAND NUCLEAR IN MARCH 1979. THE DISCREPANCY IN THE PRESCRIBED VERSUS ADMINISTERED DOSE WAS DISCOVERED DURING AN ONSITE INSPECTION BY THE NRC ON 01/13/99. THE LICENSEE IS CONTINUING ITS INVESTIGATION TO DETERMINE APPROPRIATE CORRECTIVE ACTIONS.
Power Reactor
Event Number: 35261
Facility: HARRIS
Region: 2 State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: MARK PALMER
HQ OPS Officer: FANGIE JONES
Region: 2 State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: MARK PALMER
HQ OPS Officer: FANGIE JONES
Notification Date: 01/14/1999
Notification Time: 13:06 [ET]
Event Date: 01/14/1999
Event Time: 09:18 [EST]
Last Update Date: 01/21/1999
Notification Time: 13:06 [ET]
Event Date: 01/14/1999
Event Time: 09:18 [EST]
Last Update Date: 01/21/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION 50.72(b)(2)(vi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION 50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
AL BELISLE (R2)
AL BELISLE (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | A/R | Y | 100 | Power Operation | 0 | Hot Standby |
AUTOMATIC REACTOR TRIP ON TRIP OF TWO OF THREE REACTOR COOLANT PUMPS AND LOSS OF TWO 6.9-kV BUSES
During relay calibration on the 'A' 6.9-kV non-safety bus, the bus was unexpectedly deenergized. The 'C' 6.9-kV bus is a swing bus and was tied to the 'A' 6.9-kV bus, which caused it to be deenergized also. This caused the loss of two of three reactor coolant pumps, and in turn, caused an automatic reactor trip from 100% power. All systems functioned as expected, all rods fully inserted, and auxiliary feedwater started on low steam generator level as expected. All safety systems are operable except the 'A' containment hydrogen analyzer which is out of service for planned maintenance.
The exact cause of the loss of the 6.9-kV buses is currently under investigation.
The licensee notified the NRC Resident Inspector, the State of North Carolina, and the local county.
***Update on 01/21/99 at 1710 ET by Mark Ellington taken by MacKinnon***
The licensee stated that they had not made an official notification to the state of North Carolina or the local counties but instead they had made courtesy calls to the state of North Carolina and the applicable counties notifying them of the reactor trip.
The licensee also stated that 'A-SA" Containment Hydrogen Recombiner was out of service instead of the "A" containment hydrogen analyzer. R2DO (Chris Christensen) notified.
The NRC resident inspector was notified of this update by the licensee.
During relay calibration on the 'A' 6.9-kV non-safety bus, the bus was unexpectedly deenergized. The 'C' 6.9-kV bus is a swing bus and was tied to the 'A' 6.9-kV bus, which caused it to be deenergized also. This caused the loss of two of three reactor coolant pumps, and in turn, caused an automatic reactor trip from 100% power. All systems functioned as expected, all rods fully inserted, and auxiliary feedwater started on low steam generator level as expected. All safety systems are operable except the 'A' containment hydrogen analyzer which is out of service for planned maintenance.
The exact cause of the loss of the 6.9-kV buses is currently under investigation.
The licensee notified the NRC Resident Inspector, the State of North Carolina, and the local county.
***Update on 01/21/99 at 1710 ET by Mark Ellington taken by MacKinnon***
The licensee stated that they had not made an official notification to the state of North Carolina or the local counties but instead they had made courtesy calls to the state of North Carolina and the applicable counties notifying them of the reactor trip.
The licensee also stated that 'A-SA" Containment Hydrogen Recombiner was out of service instead of the "A" containment hydrogen analyzer. R2DO (Chris Christensen) notified.
The NRC resident inspector was notified of this update by the licensee.
Power Reactor
Event Number: 35262
Facility: FITZPATRICK
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: RICK PLASSE
HQ OPS Officer: STEVE SANDIN
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: RICK PLASSE
HQ OPS Officer: STEVE SANDIN
Notification Date: 01/14/1999
Notification Time: 13:38 [ET]
Event Date: 01/14/1999
Event Time: 13:11 [EST]
Last Update Date: 01/14/1999
Notification Time: 13:38 [ET]
Event Date: 01/14/1999
Event Time: 13:11 [EST]
Last Update Date: 01/14/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
CURT COWGILL (RI)
JOHN STOLZ, NRR (EO)
FRANK CONGEL (IRO)
SULLIVAN (FEMA)
CURT COWGILL (RI)
JOHN STOLZ, NRR (EO)
FRANK CONGEL (IRO)
SULLIVAN (FEMA)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
THE LICENSEE DECLARED AN UNUSUAL EVENT DUE TO A FIRE LASTING LONGER THAN 15 MINUTES INSIDE THE PROTECTED AREA. (REFER TO EVENT #s 35263 AND 35264 FOR RELATED EVENTS.)
AT 1256 EST, OPERATORS RECEIVED A REPORT OF AN ONGOING FIRE IN THE VICINITY OF THE HYDROGEN TANK FARM AREA APPROXIMATELY 300 FEET WEST OF THE PLANT. THE SOURCE IS A HYDROGEN RELEASE. THE LOCATION OF THE SOURCE HAS NOT BEEN IDENTIFIED. THE LICENSEE EVACUATED PERSONNEL IN THE AREA AND DECLARED AN UNUSUAL EVENT AT 1311 EST DUE TO AN ONGOING FIRE LASTING LONGER THAN 15 MINUTES. OFFSITE FIRE ASSISTANCE WAS REQUESTED FROM THE SCRIBA FIRE DEPARTMENT. ALL PERSONNEL ARE ACCOUNTED FOR WITH ONE KNOWN MINOR INJURY. ALL SAFETY EQUIPMENT IS AVAILABLE. BOTH 115-kV SOURCES OF OFFSITE POWER WERE DEENERGIZED AS A SAFETY PRECAUTION TO ALLOW FIREFIGHTERS' ACCESS. THE LICENSEE IS MAINTAINING ELECTRICAL LOADS ON GENERATOR OUTPUT WITH THE STANDBY EMERGENCY DIESEL GENERATORS RUNNING UNLOADED. THE LICENSEE INFORMED NEW YORK STATE AND THE NRC RESIDENT INSPECTOR.
* * * UPDATE AT 1424 EST ON 01/14/99 * * *
AT 1424 EST, THE NRC ENTERED THE MONITORING PHASE OF NORMAL MODE.
* * * UPDATE AT 1500 EST ON 01/14/99 * * *
A COMMISSIONERS' ASSISTANTS BRIEFING WAS CONDUCTED. THE FOLLOWING NOTIFICATIONS WERE MADE (* OFFICE DID NOT PARTICIPATE): IRO (CONGEL AND WEINSTEIN); JACKSON (MILLER); DICUS (CHAN); DIAZ (HSIA); McGAFFIGAN (BEALL); MERRIFIELD (McCABE); EDO (HILTZ); DEDE (MITCHELL*); NRR EO (STOLZ); R1DO (COWGILL); PAO (GILLILAND); CAO (MADDEN); SECY (BATES); SP (LARKINS); IP (FAULKNER); BRIEFER (COWGILL); SRI (RASMUSSEN); AND NRR (BAWA, WONG, LONG, AND CONNELL).
* * * UPDATE AT 1730 EST ON 01/14/99 * * *
A COMMISSIONERS' ASSISTANTS BRIEFING WAS CONDUCTED. THE FOLLOWING NOTIFICATIONS WERE MADE: IRO (CONGEL), JACKSON (MILLER), DICUS (CHAN), DIAZ (HSIA), McGAFFIGAN (BEALL), MERRIFIELD (McCABE), EDO (HILTZ), BRIEFER (COWGILL), SRI (RASMUSSEN), AND NRR (BAWA AND WILLIAM).
* * * UPDATE AT 2111 EST ON 01/14/99 FROM TOM KERR TO FANGIE JONES * * *
THE LICENSEE TERMINATED THE UNUSUAL EVENT AT 2105 EST. THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE AT 2120 EST ON 01/14/99 * * *
THE NRC EXITED THE MONITORING PHASE OF NORMAL MODE AT 2108 EST. THE NRC OPERATIONS OFFICER NOTIFIED THE NRR EO (BOGER), IRO (CONGEL), AND FEMA (CANUPP).
AT 1256 EST, OPERATORS RECEIVED A REPORT OF AN ONGOING FIRE IN THE VICINITY OF THE HYDROGEN TANK FARM AREA APPROXIMATELY 300 FEET WEST OF THE PLANT. THE SOURCE IS A HYDROGEN RELEASE. THE LOCATION OF THE SOURCE HAS NOT BEEN IDENTIFIED. THE LICENSEE EVACUATED PERSONNEL IN THE AREA AND DECLARED AN UNUSUAL EVENT AT 1311 EST DUE TO AN ONGOING FIRE LASTING LONGER THAN 15 MINUTES. OFFSITE FIRE ASSISTANCE WAS REQUESTED FROM THE SCRIBA FIRE DEPARTMENT. ALL PERSONNEL ARE ACCOUNTED FOR WITH ONE KNOWN MINOR INJURY. ALL SAFETY EQUIPMENT IS AVAILABLE. BOTH 115-kV SOURCES OF OFFSITE POWER WERE DEENERGIZED AS A SAFETY PRECAUTION TO ALLOW FIREFIGHTERS' ACCESS. THE LICENSEE IS MAINTAINING ELECTRICAL LOADS ON GENERATOR OUTPUT WITH THE STANDBY EMERGENCY DIESEL GENERATORS RUNNING UNLOADED. THE LICENSEE INFORMED NEW YORK STATE AND THE NRC RESIDENT INSPECTOR.
* * * UPDATE AT 1424 EST ON 01/14/99 * * *
AT 1424 EST, THE NRC ENTERED THE MONITORING PHASE OF NORMAL MODE.
* * * UPDATE AT 1500 EST ON 01/14/99 * * *
A COMMISSIONERS' ASSISTANTS BRIEFING WAS CONDUCTED. THE FOLLOWING NOTIFICATIONS WERE MADE (* OFFICE DID NOT PARTICIPATE): IRO (CONGEL AND WEINSTEIN); JACKSON (MILLER); DICUS (CHAN); DIAZ (HSIA); McGAFFIGAN (BEALL); MERRIFIELD (McCABE); EDO (HILTZ); DEDE (MITCHELL*); NRR EO (STOLZ); R1DO (COWGILL); PAO (GILLILAND); CAO (MADDEN); SECY (BATES); SP (LARKINS); IP (FAULKNER); BRIEFER (COWGILL); SRI (RASMUSSEN); AND NRR (BAWA, WONG, LONG, AND CONNELL).
* * * UPDATE AT 1730 EST ON 01/14/99 * * *
A COMMISSIONERS' ASSISTANTS BRIEFING WAS CONDUCTED. THE FOLLOWING NOTIFICATIONS WERE MADE: IRO (CONGEL), JACKSON (MILLER), DICUS (CHAN), DIAZ (HSIA), McGAFFIGAN (BEALL), MERRIFIELD (McCABE), EDO (HILTZ), BRIEFER (COWGILL), SRI (RASMUSSEN), AND NRR (BAWA AND WILLIAM).
* * * UPDATE AT 2111 EST ON 01/14/99 FROM TOM KERR TO FANGIE JONES * * *
THE LICENSEE TERMINATED THE UNUSUAL EVENT AT 2105 EST. THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE AT 2120 EST ON 01/14/99 * * *
THE NRC EXITED THE MONITORING PHASE OF NORMAL MODE AT 2108 EST. THE NRC OPERATIONS OFFICER NOTIFIED THE NRR EO (BOGER), IRO (CONGEL), AND FEMA (CANUPP).
Power Reactor
Event Number: 35263
Facility: NINE MILE POINT
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: REVETTE
HQ OPS Officer: CHAUNCEY GOULD
Region: 1 State: NY
Unit: [1] [] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: REVETTE
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 01/14/1999
Notification Time: 14:23 [ET]
Event Date: 01/14/1999
Event Time: 13:47 [EST]
Last Update Date: 01/14/1999
Notification Time: 14:23 [ET]
Event Date: 01/14/1999
Event Time: 13:47 [EST]
Last Update Date: 01/14/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
GENE KELLY (R1)
JOHN STOLZ, NRR (EO)
CIBOCH (FEMA)
FRANK CONGEL (IRO)
GENE KELLY (R1)
JOHN STOLZ, NRR (EO)
CIBOCH (FEMA)
FRANK CONGEL (IRO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
THE LICENSEE DECLARED AN UNUSUAL EVENT DUE TO PLANT'S PROXIMITY TO A HYDROGEN FIRE AT FITZPATRICK. (REFER TO EVENT #s 35262 AND 35264 FOR RELATED EVENTS.)
THE LICENSEE IS DOING A PRECAUTIONARY STAFFING OF ITS TECHNICAL SUPPORT CENTER DUE TO THE FIRE AT FITZPATRICK.
THE LICENSEE HAS NOTIFIED THE NRC RESIDENT INSPECTOR AS WELL AS STATE, LOCAL, AND OTHER AGENCIES. THERE WILL BE NO PRESS RELEASE.
* * * UPDATE AT 2139 EST ON 01/14/99 FROM STAN LUCAS TO S.SANDIN * * *
UNIT 1 EXITED THE UNUSUAL EVENT AT 2125 EST BASED ON TERMINATION OF THE FITZPATRICK UNUSUAL EVENT.
THE LICENSEE INFORMED STATE/LOCAL AGENCIES AND THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED R1DO (KELLY), NRR EO (BOGER), IRO (CONGEL), AND FEMA (STEINDURF).
THE LICENSEE IS DOING A PRECAUTIONARY STAFFING OF ITS TECHNICAL SUPPORT CENTER DUE TO THE FIRE AT FITZPATRICK.
THE LICENSEE HAS NOTIFIED THE NRC RESIDENT INSPECTOR AS WELL AS STATE, LOCAL, AND OTHER AGENCIES. THERE WILL BE NO PRESS RELEASE.
* * * UPDATE AT 2139 EST ON 01/14/99 FROM STAN LUCAS TO S.SANDIN * * *
UNIT 1 EXITED THE UNUSUAL EVENT AT 2125 EST BASED ON TERMINATION OF THE FITZPATRICK UNUSUAL EVENT.
THE LICENSEE INFORMED STATE/LOCAL AGENCIES AND THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED R1DO (KELLY), NRR EO (BOGER), IRO (CONGEL), AND FEMA (STEINDURF).
Power Reactor
Event Number: 35264
Facility: NINE MILE POINT
Region: 1 State: NY
Unit: [] [2] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: WEAVER
HQ OPS Officer: CHAUNCEY GOULD
Region: 1 State: NY
Unit: [] [2] []
RX Type: [1] GE-2,[2] GE-5
NRC Notified By: WEAVER
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 01/14/1999
Notification Time: 14:23 [ET]
Event Date: 01/14/1999
Event Time: 13:47 [EST]
Last Update Date: 01/14/1999
Notification Time: 14:23 [ET]
Event Date: 01/14/1999
Event Time: 13:47 [EST]
Last Update Date: 01/14/1999
Emergency Class: UNUSUAL EVENT
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
10 CFR Section:
50.72(a)(1)(i) - EMERGENCY DECLARED
Person (Organization):
GENE KELLY (R1)
JOHN STOLZ, NRR (EO)
CIBOCH (FEMA)
FRANK CONGEL (IRD)
GENE KELLY (R1)
JOHN STOLZ, NRR (EO)
CIBOCH (FEMA)
FRANK CONGEL (IRD)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
THE LICENSEE DECLARED AN UNUSUAL EVENT DUE TO PLANT'S PROXIMITY TO A HYDROGEN FIRE AT FITZPATRICK. (REFER TO EVENT #s 35262 AND 35263 FOR RELATED EVENTS.)
THE LICENSEE IS EVACUATING PERSONNEL FROM ITS BUILDINGS LOCATED ON THE EAST SIDE OF THE SITE OUTSIDE THE PROTECTED AREA FENCE. THESE BUILDINGS WERE APPROXIMATELY SEVERAL HUNDRED YARDS FROM THE FIRE SITE. THIS ACTION WAS RECOMMENDED BY A LOCAL OFFICIAL BASED ON THE FIRE AT THE FITZPATRICK SITE WHICH BORDERS NINE MILE POINT'S EAST BOUNDARY. IT IS REPORTED THAT HYDROGEN WILL BE VENTED FOR SEVERAL HOURS. WIND DIRECTION IS FROM FITZPATRICK SITE TOWARDS NINE MILE POINT.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED ALONG WITH STATE, LOCAL, AND OTHER GOVERNMENT AGENCIES. THE LICENSEE PLANS TO ISSUE A PRESS RELEASE.
* * * UPDATE AT 2139 EST ON 01/14/99 FROM STAN LUCAS TO S.SANDIN * * *
UNIT 2 EXITED THE UNUSUAL EVENT AT 2125 EST BASED ON TERMINATION OF THE FITZPATRICK UNUSUAL EVENT.
THE LICENSEE INFORMED STATE/LOCAL AGENCIES AND THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED THE R1DO (KELLY), NRR EO (BOGER), IRO (CONGEL) AND FEMA (STEINDURF).
THE LICENSEE IS EVACUATING PERSONNEL FROM ITS BUILDINGS LOCATED ON THE EAST SIDE OF THE SITE OUTSIDE THE PROTECTED AREA FENCE. THESE BUILDINGS WERE APPROXIMATELY SEVERAL HUNDRED YARDS FROM THE FIRE SITE. THIS ACTION WAS RECOMMENDED BY A LOCAL OFFICIAL BASED ON THE FIRE AT THE FITZPATRICK SITE WHICH BORDERS NINE MILE POINT'S EAST BOUNDARY. IT IS REPORTED THAT HYDROGEN WILL BE VENTED FOR SEVERAL HOURS. WIND DIRECTION IS FROM FITZPATRICK SITE TOWARDS NINE MILE POINT.
THE NRC RESIDENT INSPECTOR WAS NOTIFIED ALONG WITH STATE, LOCAL, AND OTHER GOVERNMENT AGENCIES. THE LICENSEE PLANS TO ISSUE A PRESS RELEASE.
* * * UPDATE AT 2139 EST ON 01/14/99 FROM STAN LUCAS TO S.SANDIN * * *
UNIT 2 EXITED THE UNUSUAL EVENT AT 2125 EST BASED ON TERMINATION OF THE FITZPATRICK UNUSUAL EVENT.
THE LICENSEE INFORMED STATE/LOCAL AGENCIES AND THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED THE R1DO (KELLY), NRR EO (BOGER), IRO (CONGEL) AND FEMA (STEINDURF).
Power Reactor
Event Number: 35265
Facility: BROWNS FERRY
Region: 2 State: AL
Unit: [] [] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: RODNEY NACOSTE
HQ OPS Officer: STEVE SANDIN
Region: 2 State: AL
Unit: [] [] [3]
RX Type: [1] GE-4,[2] GE-4,[3] GE-4
NRC Notified By: RODNEY NACOSTE
HQ OPS Officer: STEVE SANDIN
Notification Date: 01/14/1999
Notification Time: 20:26 [ET]
Event Date: 01/14/1999
Event Time: 16:40 [CST]
Last Update Date: 01/15/1999
Notification Time: 20:26 [ET]
Event Date: 01/14/1999
Event Time: 16:40 [CST]
Last Update Date: 01/15/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
AL BELISLE (R2)
AL BELISLE (R2)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
HIGH PRESSURE COOLANT INJECTION (HPCI) INOPERABLE DUE TO AN OIL LEAK
THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM THE LICENSEE:
"DURING THE PERFORMANCE OF [PROCEDURE] 3-SR-3.5.1.7, HPCI MAIN AND BOOSTER PUMP SET DEVELOPED HEAD AND FLOW RATE TEST, WHILE THE HPCI PUMP WAS STARTING, AN OIL LEAK DEVELOPED ON [VALVE] 3-SV-73-18, HPCI STOP VALVE. ONE STUD WAS FOUND SHEARED FROM THE STOP VALVE. HPCI WAS SUBSEQUENTLY DECLARED INOPERABLE, AND THE APPROPRIATE [LIMITING CONDITIONS FOR OPERATION] WERE ENTERED."
THE LICENSEE IS CONDUCTING AN INVESTIGATION TO DETERMINE THE CAUSE OF THE FAILURE AND THE APPROPRIATE CORRECTIVE ACTIONS.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE 1245 EST ON 1/15/99 FROM CHRIS VAUGHN TO S. SANDIN * * *
THE LICENSEE AFTER FURTHER REVIEW CONCLUDED THAT THE APPLICABLE PARAGRAPH FOR REPORTABILITY WAS 10CFR50.72(b)(2)(iii)(D) ACCIDENT MITIGATION RATHER THAN 10CFR50.72(b)(2)(iii)(B) RHR CAPABILITY. THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED THE R2DO (AL BELISLE).
THE FOLLOWING TEXT IS A PORTION OF A FACSIMILE RECEIVED FROM THE LICENSEE:
"DURING THE PERFORMANCE OF [PROCEDURE] 3-SR-3.5.1.7, HPCI MAIN AND BOOSTER PUMP SET DEVELOPED HEAD AND FLOW RATE TEST, WHILE THE HPCI PUMP WAS STARTING, AN OIL LEAK DEVELOPED ON [VALVE] 3-SV-73-18, HPCI STOP VALVE. ONE STUD WAS FOUND SHEARED FROM THE STOP VALVE. HPCI WAS SUBSEQUENTLY DECLARED INOPERABLE, AND THE APPROPRIATE [LIMITING CONDITIONS FOR OPERATION] WERE ENTERED."
THE LICENSEE IS CONDUCTING AN INVESTIGATION TO DETERMINE THE CAUSE OF THE FAILURE AND THE APPROPRIATE CORRECTIVE ACTIONS.
THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR.
* * * UPDATE 1245 EST ON 1/15/99 FROM CHRIS VAUGHN TO S. SANDIN * * *
THE LICENSEE AFTER FURTHER REVIEW CONCLUDED THAT THE APPLICABLE PARAGRAPH FOR REPORTABILITY WAS 10CFR50.72(b)(2)(iii)(D) ACCIDENT MITIGATION RATHER THAN 10CFR50.72(b)(2)(iii)(B) RHR CAPABILITY. THE LICENSEE INFORMED THE NRC RESIDENT INSPECTOR. THE NRC OPERATIONS OFFICER NOTIFIED THE R2DO (AL BELISLE).
Power Reactor
Event Number: 35266
Facility: DRESDEN
Region: 3 State: IL
Unit: [] [2] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: SALGADO
HQ OPS Officer: FANGIE JONES
Region: 3 State: IL
Unit: [] [2] [3]
RX Type: [1] GE-1,[2] GE-3,[3] GE-3
NRC Notified By: SALGADO
HQ OPS Officer: FANGIE JONES
Notification Date: 01/14/1999
Notification Time: 21:27 [ET]
Event Date: 01/14/1999
Event Time: 20:12 [CST]
Last Update Date: 01/14/1999
Notification Time: 21:27 [ET]
Event Date: 01/14/1999
Event Time: 20:12 [CST]
Last Update Date: 01/14/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
10 CFR Section:
73.71(b)(1) - SAFEGUARDS REPORTS
Person (Organization):
JAMES CREED, REG 3 (IAT)
JOHN DAVIDSON, NMSS (IAT)
RICHARD ROSANO, NRR (IAT)
BRUCE BOGER, NRR (EO)
JAMES CREED, REG 3 (IAT)
JOHN DAVIDSON, NMSS (IAT)
RICHARD ROSANO, NRR (IAT)
BRUCE BOGER, NRR (EO)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 2 | N | Y | 100 | Power Operation | 100 | Power Operation |
| 3 | N | Y | 100 | Power Operation | 100 | Power Operation |
There was an unauthorized entry into the protected area, and immediate compensatory measures were taken upon discovery. (Contact the NRC Operations Center for additional details.)
The licensee notified the NRC Resident Inspector.
The licensee notified the NRC Resident Inspector.