Event Notification Report for January 11, 1999
U.S. Nuclear Regulatory Commission
Operations Center
EVENT REPORTS FOR
01/10/1999 - 01/11/1999
EVENT NUMBERS
35239352403524135242
Power Reactor
Event Number: 35239
Facility: RIVER BEND
Region: 4 State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: RUSS GODWIN
HQ OPS Officer: BOB STRANSKY
Region: 4 State: LA
Unit: [1] [] []
RX Type: [1] GE-6
NRC Notified By: RUSS GODWIN
HQ OPS Officer: BOB STRANSKY
Notification Date: 01/11/1999
Notification Time: 16:56 [ET]
Event Date: 01/11/1999
Event Time: 15:20 [CST]
Last Update Date: 02/23/1999
Notification Time: 16:56 [ET]
Event Date: 01/11/1999
Event Time: 15:20 [CST]
Last Update Date: 02/23/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
10 CFR Section:
50.72(b)(2)(vi) - OFFSITE NOTIFICATION
Person (Organization):
BLAIR SPITZBERG (R4)
BLAIR SPITZBERG (R4)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
NOTIFICATION TO STATE DEPARTMENT OF ENVIRONMENTAL QUALITY (Refer the event #34815 for additional information.)
The following text is a portion of a facsimile received from the licensee:
"On January 11, 1999, [River Bend Station (RBS)] personnel made a report to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. A previous report was made on September 21, 1998, and updated on October 22, 1998. RBS personnel have continued to monitor plant conditions after the first two had been suppressed. Chemistry sampling and power suppression results indicate a probable third fuel failure. Indications could be caused by a previously identified fuel failure."
"The plant is operating at 100% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR [Part] 20. Plant personnel continue to implement site procedures to address the issue and take appropriate actions."
The NRC resident inspector has been informed of this notification by the licensee.
* * * UPDATE AT 1507 EST ON 01/26/99 FROM JOEY CLARK TO S.SANDIN * * *
The following text is a portion of a facsimile received from the licensee:
"[At 1305 CST] on January 26, 1999, RBS personnel made a report to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. [Previous reports were] made on September 21, 1998, updated on October 22, 1998, and on January 11, 1999. Plant instrumentation and chemistry sampling indicates RBS has three (3) apparent fuel leakers and a probable fourth fuel leaker adjacent to a previously identified and suppressed fuel leaker."
"The plant is operating at 94.5% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR [Part] 20. Plant personnel continue to implement site procedures to address this issue and take appropriate actions."
The licensee informed the NRC resident inspector. The NRC operations officer notified the R4DO (Marshall).
* * * UPDATE AT 1435 EST ON 02/05/99 FROM DAN JERRELL TO JOLLIFFE * * *
On 02/05/99, RBS personnel made a reports to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. Previous report were made on 09/21/98 (updated on 10/22/98) and on 01/11/99 (updated on 01/26/99). During suppression testing for the 01/26/99 update, an additional probable fuel leaker was identified. Plant instrumentation and chemistry sampling indicates RBS has three apparent fuel leakers and two probable fuel leakers. Currently, all apparent and probable fuel leakers are being suppressed.
The plant is operating at 94% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR Part 20. Plant personnel continue to implement site procedures to address this issue and take appropriate actions.
The licensee informed the NRC resident inspector. The NRC operations officer notified the R4DO (Jeff Shackelford).
* * * UPDATE AT 1453 EST ON 02/23/99 FROM DONALD CHASE TO FANGIE JONES * * *
On 02/23/99, RBS personnel made a report to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. On 02/15/99 at approximately 1200 CST, plant instrumentation indicated that RBS experienced an additional probable fuel leaker. Plant instrumentation and chemistry sampling indicates RBS has four apparent fuel leakers and two probable fuel leakers. RBS is planning to perform suppression testing this weekend in an attempt to locate and suppress this additional fuel leaker.
The plant is operating at 90% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR Part 20. Plant personnel continue to implement site procedures to address this issue and take appropriate actions.
The licensee informed the NRC resident inspector. The NRC operations officer notified the R4DO (Elmo Collins).
The following text is a portion of a facsimile received from the licensee:
"On January 11, 1999, [River Bend Station (RBS)] personnel made a report to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. A previous report was made on September 21, 1998, and updated on October 22, 1998. RBS personnel have continued to monitor plant conditions after the first two had been suppressed. Chemistry sampling and power suppression results indicate a probable third fuel failure. Indications could be caused by a previously identified fuel failure."
"The plant is operating at 100% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR [Part] 20. Plant personnel continue to implement site procedures to address the issue and take appropriate actions."
The NRC resident inspector has been informed of this notification by the licensee.
* * * UPDATE AT 1507 EST ON 01/26/99 FROM JOEY CLARK TO S.SANDIN * * *
The following text is a portion of a facsimile received from the licensee:
"[At 1305 CST] on January 26, 1999, RBS personnel made a report to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. [Previous reports were] made on September 21, 1998, updated on October 22, 1998, and on January 11, 1999. Plant instrumentation and chemistry sampling indicates RBS has three (3) apparent fuel leakers and a probable fourth fuel leaker adjacent to a previously identified and suppressed fuel leaker."
"The plant is operating at 94.5% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR [Part] 20. Plant personnel continue to implement site procedures to address this issue and take appropriate actions."
The licensee informed the NRC resident inspector. The NRC operations officer notified the R4DO (Marshall).
* * * UPDATE AT 1435 EST ON 02/05/99 FROM DAN JERRELL TO JOLLIFFE * * *
On 02/05/99, RBS personnel made a reports to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. Previous report were made on 09/21/98 (updated on 10/22/98) and on 01/11/99 (updated on 01/26/99). During suppression testing for the 01/26/99 update, an additional probable fuel leaker was identified. Plant instrumentation and chemistry sampling indicates RBS has three apparent fuel leakers and two probable fuel leakers. Currently, all apparent and probable fuel leakers are being suppressed.
The plant is operating at 94% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR Part 20. Plant personnel continue to implement site procedures to address this issue and take appropriate actions.
The licensee informed the NRC resident inspector. The NRC operations officer notified the R4DO (Jeff Shackelford).
* * * UPDATE AT 1453 EST ON 02/23/99 FROM DONALD CHASE TO FANGIE JONES * * *
On 02/23/99, RBS personnel made a report to the Louisiana Department of Environmental Quality related to a potential defect in fuel cladding. On 02/15/99 at approximately 1200 CST, plant instrumentation indicated that RBS experienced an additional probable fuel leaker. Plant instrumentation and chemistry sampling indicates RBS has four apparent fuel leakers and two probable fuel leakers. RBS is planning to perform suppression testing this weekend in an attempt to locate and suppress this additional fuel leaker.
The plant is operating at 90% power with radioactive releases well below the limits of the Technical Requirements Manual and 10 CFR Part 20. Plant personnel continue to implement site procedures to address this issue and take appropriate actions.
The licensee informed the NRC resident inspector. The NRC operations officer notified the R4DO (Elmo Collins).
Power Reactor
Event Number: 35240
Facility: HADDAM NECK
Region: 1 State: CT
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: JON BOWER
HQ OPS Officer: BOB STRANSKY
Region: 1 State: CT
Unit: [1] [] []
RX Type: [1] W-4-LP
NRC Notified By: JON BOWER
HQ OPS Officer: BOB STRANSKY
Notification Date: 01/11/1999
Notification Time: 17:56 [ET]
Event Date: 01/11/1999
Event Time: 17:00 [EST]
Last Update Date: 01/11/1999
Notification Time: 17:56 [ET]
Event Date: 01/11/1999
Event Time: 17:00 [EST]
Last Update Date: 01/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
Person (Organization):
GENE KELLY (R1)
GENE KELLY (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Decommissioned | 0 | Decommissioned |
VENT STACK RADIATION MONITOR CALIBRATION PROCEDURE INADEQUATE
The licensee has determined that the pressure transmitter compensation input signal to the primary vent stack monitor (R-14A) was not recognized or used in the calibration of the monitor.
The following information was submitted by the licensee via facsimile:
"The condition report [99-0011] has noted that the RM-14A monitor's output signal is compensated based on the effects of the absolute pressure as measured at the detector chamber by a pressure transmitter mounted on the monitor skid. It has been determined that this pressure transmitter was provided as part of the original design by the vendor (Victoreen). Also noted is that the pressure transmitter Is not calibrated as part of the radiation monitor's surveillance procedure and that no separate calibration procedure exists for the pressure transmitter.
"Radiation monitor RM-14A monitors the noble gas effluents being discharged through the primary vent stack (which includes discharges from the Spent Fuel Building). Plant modification number, PDCR 1550, approved on December 11, 1995, replaced several radiation monitor channels, including RM-14A (this PDCR is still open at present, with final installation being completed).
"PDCR 1550 noted in the bases of current design section that the replacement RM-14A monitor Is non-QA and is not required during accident conditions since it does not perform a safety related function. The replacement monitor was purchased in accordance with CY specification SP-CY-EE-369.
"The purpose of PDCR 1550 was to replace radiation monitors that were obsolete or difficult to maintain. The design basis for RM-14A is to monitor gaseous effluent r releases through the primary vent stack and provide indication I alarms for the plant operator r the PDCR nor the purchase specification noted the requirement for a pressure con compensated signal for RM-14A.
"Radiation monitor RM-14A was tested under PDCR 1550 and released for operations on August 5,1996. As a condition of release this monitor was calibrated and functionally tested by the surveillance test SUR 5.2-81.3 (last performed on October 28, 1998).Since this surveillance test does not include the calibration or functional check of the pressure transmitter, the indicated radiation level may be inaccurate. This is interpreted as a missed surveillance and inadequate functional testing of the RM-14A replacement design. Therefore it is believed to be reportable under 1OCFR5O.73(a)(2)(i)(B) as a condition prohibited by the plant's Technical Specifications.
"The Victoreen Technical Manual is a 2 volume set that provides installation, operation and maintenance instructions as well as factory test procedures and initial data. The organization of this information is somewhat confusing regarding the use of or need for the pressure transmitter. The system overview does not discuss this function at all, the theory of operation section states that the signal is used to calculate the radiation value 'when used,' and the section on 'optional circuit boards' lists an analog input board that can be used for the pressure input signal.
"SP-CY-EE.369 specified technical requirements and factory acceptance testing for the radiation monitors purchased under PDCR 1550. CY personnel were to witness (indeterminate if performed) factory calibration tests of the monitors. Victoreen's factory test data sheet for the monitor's electronic check had a hand written entry that the pressure transmitter input was disabled during the test, this step is not documented in their test procedure.
"The PDCR and surveillance test procedure for RM-14A failed to recognize that the pressure transmitter input signal was used to calculate a compensated radiation value. This indicates an inadequate understanding of system design and instrument calibration by plant personnel. Therefore it is believed to be reportable under 10CFR5O.73(a)(2)(ii)(B) outside the design basis of the plant."
The licensee has determined that the pressure transmitter compensation input signal to the primary vent stack monitor (R-14A) was not recognized or used in the calibration of the monitor.
The following information was submitted by the licensee via facsimile:
"The condition report [99-0011] has noted that the RM-14A monitor's output signal is compensated based on the effects of the absolute pressure as measured at the detector chamber by a pressure transmitter mounted on the monitor skid. It has been determined that this pressure transmitter was provided as part of the original design by the vendor (Victoreen). Also noted is that the pressure transmitter Is not calibrated as part of the radiation monitor's surveillance procedure and that no separate calibration procedure exists for the pressure transmitter.
"Radiation monitor RM-14A monitors the noble gas effluents being discharged through the primary vent stack (which includes discharges from the Spent Fuel Building). Plant modification number, PDCR 1550, approved on December 11, 1995, replaced several radiation monitor channels, including RM-14A (this PDCR is still open at present, with final installation being completed).
"PDCR 1550 noted in the bases of current design section that the replacement RM-14A monitor Is non-QA and is not required during accident conditions since it does not perform a safety related function. The replacement monitor was purchased in accordance with CY specification SP-CY-EE-369.
"The purpose of PDCR 1550 was to replace radiation monitors that were obsolete or difficult to maintain. The design basis for RM-14A is to monitor gaseous effluent r releases through the primary vent stack and provide indication I alarms for the plant operator r the PDCR nor the purchase specification noted the requirement for a pressure con compensated signal for RM-14A.
"Radiation monitor RM-14A was tested under PDCR 1550 and released for operations on August 5,1996. As a condition of release this monitor was calibrated and functionally tested by the surveillance test SUR 5.2-81.3 (last performed on October 28, 1998).Since this surveillance test does not include the calibration or functional check of the pressure transmitter, the indicated radiation level may be inaccurate. This is interpreted as a missed surveillance and inadequate functional testing of the RM-14A replacement design. Therefore it is believed to be reportable under 1OCFR5O.73(a)(2)(i)(B) as a condition prohibited by the plant's Technical Specifications.
"The Victoreen Technical Manual is a 2 volume set that provides installation, operation and maintenance instructions as well as factory test procedures and initial data. The organization of this information is somewhat confusing regarding the use of or need for the pressure transmitter. The system overview does not discuss this function at all, the theory of operation section states that the signal is used to calculate the radiation value 'when used,' and the section on 'optional circuit boards' lists an analog input board that can be used for the pressure input signal.
"SP-CY-EE.369 specified technical requirements and factory acceptance testing for the radiation monitors purchased under PDCR 1550. CY personnel were to witness (indeterminate if performed) factory calibration tests of the monitors. Victoreen's factory test data sheet for the monitor's electronic check had a hand written entry that the pressure transmitter input was disabled during the test, this step is not documented in their test procedure.
"The PDCR and surveillance test procedure for RM-14A failed to recognize that the pressure transmitter input signal was used to calculate a compensated radiation value. This indicates an inadequate understanding of system design and instrument calibration by plant personnel. Therefore it is believed to be reportable under 10CFR5O.73(a)(2)(ii)(B) outside the design basis of the plant."
Power Reactor
Event Number: 35241
Facility: HOPE CREEK
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ERV PARKER
HQ OPS Officer: BOB STRANSKY
Region: 1 State: NJ
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: ERV PARKER
HQ OPS Officer: BOB STRANSKY
Notification Date: 01/11/1999
Notification Time: 19:01 [ET]
Event Date: 01/11/1999
Event Time: 16:41 [EST]
Last Update Date: 01/11/1999
Notification Time: 19:01 [ET]
Event Date: 01/11/1999
Event Time: 16:41 [EST]
Last Update Date: 01/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
10 CFR Section:
50.72(b)(2)(iii)(D) - ACCIDENT MITIGATION
Person (Organization):
GENE KELLY (R1)
GENE KELLY (R1)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | Y | 100 | Power Operation | 100 | Power Operation |
RCIC SYSTEM DECLARED INOPERABLE
The licensee manually closed the Reactor Core Isolation Cooling (RCIC) outboard steam supply isolation valve in accordance with plant Technical Specifications. At 1541, the Isolation Actuation Instrumentation System TS was entered due to an apparent component power supply failure in the steam leak detection isolation circuitry. The licensee is currently troubleshooting the power supply problem with the steam leak detection circuitry. With the RCIC outboard steam supply isolation valve closed, the system is not capable of performing its intended function. The High Pressure Coolant Injection (HPCI) system is currently operable. The NRC resident inspector will be informed of this event by the licensee.
The licensee manually closed the Reactor Core Isolation Cooling (RCIC) outboard steam supply isolation valve in accordance with plant Technical Specifications. At 1541, the Isolation Actuation Instrumentation System TS was entered due to an apparent component power supply failure in the steam leak detection isolation circuitry. The licensee is currently troubleshooting the power supply problem with the steam leak detection circuitry. With the RCIC outboard steam supply isolation valve closed, the system is not capable of performing its intended function. The High Pressure Coolant Injection (HPCI) system is currently operable. The NRC resident inspector will be informed of this event by the licensee.
Power Reactor
Event Number: 35242
Facility: COOK
Region: 3 State: MI
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DON KOSLOFF
HQ OPS Officer: BOB STRANSKY
Region: 3 State: MI
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: DON KOSLOFF
HQ OPS Officer: BOB STRANSKY
Notification Date: 01/11/1999
Notification Time: 20:27 [ET]
Event Date: 01/11/1999
Event Time: 16:28 [EST]
Last Update Date: 01/11/1999
Notification Time: 20:27 [ET]
Event Date: 01/11/1999
Event Time: 16:28 [EST]
Last Update Date: 01/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(i) - DEG/UNANALYZED COND 50.72(b)(2)(iii)(A) - POT UNABLE TO SAFE SD
10 CFR Section:
50.72(b)(2)(i) - DEG/UNANALYZED COND 50.72(b)(2)(iii)(A) - POT UNABLE TO SAFE SD
Person (Organization):
JIM GAVULA (R3)
JIM GAVULA (R3)
| Unit | SCRAM Code | RX Crit | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
|---|---|---|---|---|---|---|
| 1 | N | N | 0 | Cold Shutdown | 0 | Cold Shutdown |
| 2 | N | N | 0 | Cold Shutdown | 0 | Cold Shutdown |
SAFETY RELATED RELAYS MAY NOT BE SEISMICALLY QUALIFIED
"General Electric HFA safety related relays may be inoperable due to inadequate seismic qualification. Several hundred relays are now being evaluated to determine which ones need to be checked for qualification. The HFA relays are supplied with normally open contacts. If contacts are changed to normally closed, the contacts must be checked to verify contact synchronization and wipe. There is no evidence that the verification has been performed. Therefore all relays are considered suspect and all four emergency diesel generators were declared inoperable at 1628 hours on January 11, 1999.
"Evaluation of this condition is continuing. An initial list of relays that require checking is being compiled and action requests are being written to perform the required checks. Both Units are currently in Mode 5."
The NRC resident inspector will be informed of this notification by the licensee.
"General Electric HFA safety related relays may be inoperable due to inadequate seismic qualification. Several hundred relays are now being evaluated to determine which ones need to be checked for qualification. The HFA relays are supplied with normally open contacts. If contacts are changed to normally closed, the contacts must be checked to verify contact synchronization and wipe. There is no evidence that the verification has been performed. Therefore all relays are considered suspect and all four emergency diesel generators were declared inoperable at 1628 hours on January 11, 1999.
"Evaluation of this condition is continuing. An initial list of relays that require checking is being compiled and action requests are being written to perform the required checks. Both Units are currently in Mode 5."
The NRC resident inspector will be informed of this notification by the licensee.