Event Notification Report for January 08, 1999

U.S. Nuclear Regulatory Commission
Operations Center

EVENT REPORTS FOR
01/07/1999 - 01/08/1999

EVENT NUMBERS
352293523035231352323523335234

General Information or Other
Event Number: 35229
Rep Org: STATE OF LOUSIANA
Licensee: EAST JEFF GENERAL HOSPITAL
Region: 4
City: NEW ORLEANS   State: LA
County:
License #:
Agreement: Y
Docket:
NRC Notified By: JOE NOBLE
HQ OPS Officer: BOB STRANSKY
Notification Date: 01/08/1999
Notification Time: 09:48 [ET]
Event Date: 01/08/1999
Event Time: 00:00 [CST]
Last Update Date: 01/08/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
PHIL HARRELL (R4)
Event Text
AGREEMENT STATE REPORT

While changing sources in a high dose rate afterloader, the source became disconnected from the drive cable. The afterloader device is located in a shielded room. The licensee has contacted the vendor to retrieve the source. No further details were provided. A representative of the state is responding to the site.


Power Reactor
Event Number: 35230
Facility: PRAIRIE ISLAND
Region: 3     State: MN
Unit: [1] [] []
RX Type: [1] W-2-LP,[2] W-2-LP
NRC Notified By: MATHER
HQ OPS Officer: CHAUNCEY GOULD
Notification Date: 01/08/1999
Notification Time: 10:43 [ET]
Event Date: 01/08/1999
Event Time: 08:52 [CST]
Last Update Date: 01/08/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(ii) - ESF ACTUATION
Person (Organization):
BRENT CLAYTON (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N N 0 Hot Shutdown 0 Hot Shutdown
Event Text
AUTO START OF THE #11 TURBINE DRIVEN AUX FEED PUMP.

WHILE TESTING OF THE #11 REACTOR COOLANT PUMP BREAKER WAS IN PROGRESS ON 4.16KV BUS 11, AN INADVERTENT UNDERVOLTAGE OCCURRED ON BUS 12 CAUSING TRIP OF REACTOR COOLANT PUMP (RCP) 12, PUTTING THE PLANT IN A SECOND LCO FOR HAVING TWO RCPS OUT OF SERVICE. THIS RESULTED IN THE INITIATING SIGNAL FOR THE AUTO START OF THE # 11 TURBINE DRIVEN AUX FEEDWATER PUMP. THE #11 TURBINE DRIVEN AUX FEED PUMP WAS SECURED WHEN THE UNDERVOLTAGE SIGNAL WAS CLEARED ON BUS 12 AND #12 REACTOR COOLANT PUMP WAS RESTARTED, AT WHICH TIME THEY EXITED THE SECOND LCO. THE CAUSE OF THIS EVENT IS BEING INVESTIGATED.

THE RESIDENT INSPECTOR WAS NOTIFIED.


Power Reactor
Event Number: 35231
Facility: VERMONT YANKEE
Region: 1     State: VT
Unit: [1] [] []
RX Type: [1] GE-4
NRC Notified By: M. MAGNUSON
HQ OPS Officer: BOB STRANSKY
Notification Date: 01/08/1999
Notification Time: 11:28 [ET]
Event Date: 01/08/1999
Event Time: 10:35 [EST]
Last Update Date: 01/11/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(ii)(B) - OUTSIDE DESIGN BASIS
Person (Organization):
WILLIAM COOK (R1)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
Event Text
RHR SERVICE WATER PUMPS MAY NOT HAVE ADEQUATE NPSH

A review of calculation VYC-990, R4 shows that inadequate NPSH exists for RHR Service Water (RHRSW) pumps. VYC-990, R4 may not have conservatively taken into account pump and system parameters, resulting in a condition of being outside the design basis of the plant for the RHRSW system.

The NRC resident inspector has been informed of this event by the licensee.

* * * UPDATE 1557 1/11/99 FROM CREITZER TAKEN BY STRANSKY * * *

The licensee submitted the following clarification of the initial report:

"During a review of the NPSH calculations and input data for the RHRSW pumps it was determined that potentially the calculation may not be conservative. There is no operability concern for the RHRSW pumps at this time due to the administrative restrictions the plant has put in place. (BMO 98-44) Alternate Cooling System deep basin water temperature will be maintained at <= 73°F. A Basis for Maintaining Operability (BMO) has been developed and approved by plant management.

"At the present time, the plant is operating in winter conditions and the ambient conditions result in additional margin for NPSH. In addition, Alternate Cooling System deep basin water temperature is monitored and logged once per day.

"Based on the above restrictions and conditions the available NPSH for the RHRSW pumps is adequate, for the present and near term operability conditions."

NRC resident inspector has been informed of this event by the licensee. Notified R1DO (Kelly).


Hospital
Event Number: 35232
Rep Org: ST. VINCENT'S MEDICAL CENTER
Licensee: ST. VINCENT'S MEDICAL CENTER
Region: 1
City: BRIDGEPORT   State: CT
County:
License #: 06-00843-03
Agreement: N
Docket:
NRC Notified By: ROBERT LANGE
HQ OPS Officer: DOUG WEAVER
Notification Date: 01/08/1999
Notification Time: 13:50 [ET]
Event Date: 01/08/1999
Event Time: 12:00 [EST]
Last Update Date: 01/08/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
20.2202(b)(1) - PERS OVEREXPOSURE/TEDE >= 5 REM
Person (Organization):
WILLIAM COOK (R1)
DR. COOL (NMSS)
Event Text
POTENTIAL PERSONNEL OVEREXPOSURE

A radiation oncology technologist's film badge recorded a dose of 19,490 mR for the month of November. The results were provided to the licensee on 12/18/98. The licensee requested confirmation of the results and the confirmation was received today, 1/8/99.

The licensee does not believe the technologist actually received this dosage based on an interview with the employee. The employee denies being present during any treatments that could have resulted in the dose. The employee provided a blood sample and it was found to be normal.


Power Reactor
Event Number: 35233
Facility: BYRON
Region: 3     State: IL
Unit: [1] [] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: LARRY BUNNER
HQ OPS Officer: DOUG WEAVER
Notification Date: 01/08/1999
Notification Time: 15:00 [ET]
Event Date: 01/08/1999
Event Time: 13:41 [CST]
Last Update Date: 01/08/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(1)(i)(A) - PLANT S/D REQD BY TS
Person (Organization):
BRENT CLAYTON (R3)
Power Reactor Unit Info
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 99 Power Operation
Event Text
TECHNICAL SPECIFICATION REQUIRED SHUTDOWN

"During testing of the 'A' train of the solid state protection system, the Reactor Trip breaker 'A' failed to function normally and was declared inoperable. Technical specifications require the unit to be placed in Mode 3 (shutdown condition) within 6 hours. At 1341 a power ramp was initiated to decrease reactor power to mode 3."

Technical Specifications allow six hours to reach mode 3. The six hour clock started at 1224. No other equipment is out of service that will impact the plant shutdown. The licensee notified the NRC resident inspector.


***************************** UPDATE AT 1707 ON 1/8/99, BY BUNNER TAKEN BY WEAVER *****************

The licensee repaired and completed testing the breaker at 1555. Power had been reduced to 54% and is now increasing. The Tech Spec LCO action statement has been exited. The licensee will inform the NRC resident inspector. The HOO notified the R3DO (Clayton).


Fuel Cycle Facility
Event Number: 35234
Facility: PORTSMOUTH GASEOUS DIFFUSION PLANT
Region: 3     State: OH
Unit: [] [] []
RX Type: URANIUM ENRICHMENT FACILITY
Comments: 2 DEMOCRACY CENTER
6903 ROCKLEDGE DRIVE
BETHESDA, MD 20817 (301)564-3200
NRC Notified By: KURT SISLER
HQ OPS Officer: DOUG WEAVER
Notification Date: 01/08/1999
Notification Time: 16:17 [ET]
Event Date: 01/08/1999
Event Time: 12:30 [EST]
Last Update Date: 01/13/1999
Emergency Class: NON EMERGENCY
10 CFR Section:
Person (Organization):
BRENT CLAYTON (R3)
SUSAN SHANKMAN (NMSS)
JOSEPH GIITTER (IRD)
Event Text
BULLETIN 91-01 4-HOUR REPORT

The following text is a portion of a facsimile received from Portsmouth:

"On January 8, 1999, at 1230 hours, it was discovered that no Nuclear Criticality Safety Approval (NCSA) was in place for the X-326 Evacuation Booster Station. The Evacuation Booster Station has been abandoned in place for more than 20 years. A UF6 negative was obtained on this equipment before it was isolated from the rest of the X-326 cascade equipment. Applied Nuclear Technology (ANTS) is analyzing to determine if greater than 15 grams of U235 is present."

"This event is being reported under criticality control (Bulletin 91-01) 4-hour due to the potential that abandoned equipment contains more than 15 grams U235 requiring NCSA per [Technical Safety Requirement] 3.11.2."

The NRC resident inspector was notified by Portsmouth personnel.

* * * UPDATE AT 1743 ON 01/13/99 FROM SPAETH TAKEN BY STRANSKY * * *

The following text is a portion of a facsimile received from Portsmouth:

"[Nondestructive analysis (NDA)] results obtained from the X-326 [Evacuation Booster Station] indicated numerous components containing greater than 15 grams U235 present. Enrichment was a maximum of 26% U235 with the mass deposits determined to be less than safe mass. Two components were determined to have a U235 mass requiring the components to be handled as 'PEH' [(Planned Expeditious Handling)]."

The NRC resident inspector has been informed of this update by Portsmouth personnel. The NRC Operations Officer notified the R3DO (Gavula), NMSS EO (Surmeier), and IRD (Congel).